Test Site Operations and Maintenance Safety: Test Facilities Capital Equipment.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The paper will describe the design concept of the emergency power system utilized in the high temperature gas cooled reactor project (HTR-PM) which is currently under construction in Shandong, China. As a class 1E system which is related to the safety feature of the reactor, emergency power system is responsible for providing multiple reliable power sources for nuclear safety class loads. Therefore, the structure, power source deployment, operation, maintenance and alignment of the system should meet several standards and regulations. The paper will give a detailed description about the designing process of the system which include structure design, determination of primary device parameters, and some calculation results of device capacity such as emergency diesel engine, UPS et al. (authors)
Poster to explain app that we are presenting at the conference
Operation and maintenance costs for nuclear power plants are very large. Reactors are starting to shut down even after their operating licenses have been extended, because they are not price competitive compared to other energy sources. The nuclear industry is witnessing early closure of nuclear power plants due to economic reasons despite excellent safety records. Therefore, it is imperative to reduce costs to prevent these early closures. This paper showcases recent research into advanced fault diagnostics techniques and preventative maintenance optimization to reduce these maintenance costs. This report focuses on the condensate and feedwater system for both pressurized and boiling water reactor systems. The computerized maintenance management system, which contains the plant’s digital record of all the corrective- and preventative-maintenance work orders, was used as a ground truth to locate potential faults and label the process data as healthy or faulty. Various feature extraction techniques were utilized to further differentiate the faults from the healthy data. Support vectors machines were used to categorize other test sets of process data as healthy or faulty through a cross validation procedure. Similar faults were not found within this system leading to preventative maintenance optimization. Unnecessary amounts of preventative maintenance lead to inflated maintenance costs. This paper summarizes the steps for preventative maintenance optimization from component health determination to recommendation for action. This optimization was completed for condensate pumps, condensate booster pumps, and the respective motors that drive them.
Nuclear power continues to be a safe, reliable, and carbon-free electricity generating source for the United States, though the cost of operating and maintaining the current United States nuclear power plant fleet has become uncompetitive with other sources. This gap is attributed to the advent of new digital instrumentation and control technologies that other electricity generating industries are currently leveraging to streamline work and greatly reduce operating, maintenance, and support costs. Digital instrumentation and control systems and control room modernization offers significant opportunities to reduce operating and maintenance costs to ensure the continued operation of the existing United States light-water reactors.
EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.
The National Energy Technology Laboratory (NETL) and EPRI (Participant) will collaborate in the investigation of flashovers in electric power distribution maintenance operations. Live line and barehand maintenance techniques are used on overhead transmission lines around the world. While flashovers during this type of work are rare, several unexplained flashovers have occurred in North America. In each case, available evidence suggests these occurred at steady state (60 Hz) system voltage and at voltage stress levels well below that which is known to cause flashover. Understanding the cause of these flashovers is essential so they can be avoided in the future and enhance line worker safety. Some utilities are considering adding sheds to their live line tools (e.g. hot sticks) as a possible mitigation measure. The effect of adding sheds to the hot sticks was modelled and published by Chalmers University. A strong case can be made for sheds if the model can be validated through laboratory testing. This research is envisioned to be a multiple-year project. The work proposed under this agreement represents the initial research steps which will involve reproducing, verifying, and extending the modeling research previously published by Chalmers University.
This presentation describes a technoeconomic analysis using NLR's Windfarm Operations & Maintenance cost-Benefit Analysis Tool (WOMBAT) to compare operational expenses and levelized cost of energy for wind turbines using standard spherical roller bearings with a novel segmented journal bearing developed by Miba.
Tokamak Cooling Water System (TCWS) drain tanks (DTs) serve two functions: normal operation and safety operation. Normal DTs are used for regular maintenance operations when draining is necessary. Safety DTs are used to receive the water leaked into the Vacuum Vessel (VV) after an in-vessel loss of coolant accident (LOCA) event. The preliminary design of the DTs shall be based on the information provided by this document. The capacity of the normal DTs is estimated based on the internal volume of in-vessel components [e.g., First Wall/Blanket (FW/BLK) and Divertor (DIV)]; Neutral Beam Injector (NBI) components; and TCWS piping, heat exchangers, electric heaters, pump casing, pressurizers, and valves. Water volumes have been updated based on 2004-design information, changes adopted because of approved Project Change Requests (PCRs), and data verification by US ITER and AREVA Federal Services, the US ITER A and E Company. Two tanks will store water from normal draining operations of the FW/BLK and DIV Primary Heat Transfer Systems (PHTSs). One tank will store water from normal draining operations of the NBI PHTS. The capacity of the safety DTs is based on analysis of a design basis accident: a large leak from in-vessel components. There are two safety DTs that will receive water from a VV LOCA event and drainage from the VV, as needed. In addition, there is one sump tank for the DIV that will be used for collecting drain water from the draining and drying processes and specifically for draining the DIV system as the DIV cassette lines are at a lower elevation than the DT connection point. Information documented in this report must be refined and verified during the preliminary design of the DTs, and there are several aspects to be considered to complete the preliminary design. Input to these design considerations is discussed in this report and includes, but is not limited to, water inventory; operating procedures/maintenance; Failure Modes and Effects Analysis (FMEA); tank layout and dimensions, including design margin; classification under French Nuclear Pressure Directives, Equipements Sous Pression Nucleaires (ESPN); and adaptations for construction.
Tokamak Cooling Water System (TCWS) drain tanks (DTs) serve two functions: normal operation and safety operation. Normal DTs are used for regular maintenance operations when draining is necessary. Safety DTs are used to receive the water leaked into the Vacuum Vessel (VV) after an in-vessel loss of cooling accident (LOCA) event. The preliminary design of the DTs shall be based on the information provided by this document. The capacity of the normal DTs is estimated based on the internal volume of in-vessel components [e.g., First Wall/Blanket (FW/BLK) and Divertor (DIV)], Neutral Beam Injector (NBI) components, and TCWS piping, heat exchangers, electric heaters, pump casing, pressurizers, and valves. Water volumes have been updated based on 2004 design information, changes adopted because of approved Project Change Requests (PCRs), and data verification by U.S. ITER. Two tanks will store water from normal draining operations of the FW/BLK and DIV Primary Heat Transfer Systems (PHTSs). One tank will store water from normal draining operations of the NBI PHTS. The capacity of the safety DTs is based on analysis of a design-basis accident:1 a large leak from in-vessel components. There are two safety DTs that will receive water from a VV LOCA event and drainage from the VV, as needed. In addition, there is one sump tank for the DIV that will be used for collecting drain water from the draining and drying processes and specifically for draining the DIV system as the DIV cassettes lines are at a lower elevation than the DT connection point. Information documented in this report must be refined and verified during the preliminary design of the DTs, and there are several aspects to be considered to complete the preliminary design. Input to these design considerations is discussed in this report and includes, but is not limited to, water inventory; operating procedures/maintenance; Failure Modes and Effects Analysis (FMEA); tank layout anddimensions, including design margin; classification under French Nuclear Pressure Directives, Equipements Sous Pression Nucleaires (ESPN); and adaptations for construction.
Wind turbine operations & maintenance (O&M) costs constitute a sizable portion of total energy cost for wind power. There are many components in a utility-scale wind turbine that need to be lubricated with either oil or grease. This study uses gearbox oil as an example and assesses how lubricant technology improvements may impact wind turbine power production and levelized cost of energy. Using the modeling tools (i.e., WOMBAT, reV, and SAM) developed at National Renewable Energy Laboratory and lubrication oil technology scenarios defined based on inputs provided by ExxonMobil and industry stakeholders, we quantify the potential for increasing energy production and reducing maintenance costs across the current and future U.S. fleet of wind turbines as a result of improvements in lubrication technologies. The modeled improvements reduce the median levelized cost of energy by 1-2% across the U.S. fleet. Cumulative saving from gear oil technology improvements in 2050 for U.S. fleet is estimated to be approximately $6 billion. Extending the lubricant replacement interval has a larger impact on total cost and energy production than reducing lubricant cost.
Natural soiling and the subsequent requisite cleaning of photovoltaic (PV) modules result in abrasion damage to the cover glass. The durability of the front glass has important economic consequences, including determining the use of anti-reflective and/or anti-soiling coatings as well as the method and frequency of operational maintenance (cleaning). Artificial linear brush abrasion using Nylon 6/12 bristles was therefore examined to explore the durability of representative PV first-surfaces, i.e., the surface of a module incident to direct solar radiation. Specimens examined include silane surface functionalized-, roughened (etched)-, porous silica-coated-, fluoropolymer-coated-, and ceramic (TiO2 or ZrO2/SiO2/ZrO2/SiO2)-coated-glass, which are compared to monolithic-poly(methyl methacrylate) and -glass coupons. Characterization methods used in this study include: optical microscopy, ultraviolet-visible-near-infrared (UV-VIS-NIR) spectroscopy, sessile drop goniometry, white-light interferometry, atomic force microscopy (AFM), and depth-profiling X-ray photoelectron spectroscopy (XPS). The corresponding characteristics examined include: surface morphology, transmittance (i.e., optical performance), surface energy (water contact angle), surface roughness, scratch width and depth, and chemical composition, respectively. The study here was performed to determine coating failure modes; identify characterization methods that can detect nascent failures; compare the durability of popular contemporary coating materials; identify their corresponding damage characteristics; and compare slurry and dry-dust abrasion. This study will also aid in developing an abrasion standard for the PV industry.
Natural soiling and the subsequent necessary cleaning of photovoltaic (PV) modules result in abrasion damage to the cover glass. The durability of the front glass has important economic consequences, including determining the use of anti-reflective and/or anti-soiling coatings as well as the method and frequency of operational maintenance (cleaning). Artificial linear brush abrasion using Nylon 6/12 bristles was therefore examined to explore the durability of representative PV first-surfaces, i.e., the surface of a module incident to direct solar radiation. Specimens examined include silane surface functionalized-, roughened (etched)-, porous silica-coated-, fluoropolymer-coated-, and ceramic (TiO 2 or ZrO 2 /SiO 2 /ZrO 2 /SiO 2 )-coated-glass, which are compared to monolithic-poly(methyl methacrylate) and -glass coupons. Characterization methods used in this study include: optical microscopy, ultraviolet–visible–near-infrared (UV-VIS-NIR) spectroscopy, sessile drop goniometry, white-light interferometry, atomic force microscopy (AFM), and depth-profiling X-ray photoelectron spectroscopy (XPS). The corresponding characteristics examined include: surface morphology, transmittance (i.e., optical performance), surface energy (water contact angle), surface roughness, scratch width and depth, and chemical composition, respectively. The study here was performed to determine coating failure modes; identify characterization methods that can detect nascent failures; compare the durability of popular contemporary coating materials; identify their corresponding damage characteristics; and compare slurry and dry-dust abrasion. This study will also aid in developing an abrasion standard for the PV industry.
Safeguards verification measurements of nuclear material content in fresh fuel salt for liquid-fueled molten salt reactors (MSRs) are likely to be required as part of nuclear material accountancy for International Atomic Energy Agency safeguards. Here, this paper presents a comprehensive review and evaluation of 18 potential candidate techniques to quantify total uranium and 235 U for input accountancy measurements for liquid-fueled MSRs. As part of an overall screening and down-selection effort to identify the most promising techniques for further development for an MSR feed monitoring system, this paper defines eight figures of merit (FOMs): reasonably achievable measurement uncertainty, measurement time required, capital cost, burden upon the facility operator, maintenance intensity, technological maturity, human capital requirements for operation, and whether the technique introduces a path for potential material removal. Each candidate technique is then evaluated across these FOMs to identify the techniques with the highest potential for future development for fresh fuel accountancy measurements in MSRs. Our findings indicate that no single technique or combination thereof currently has the requisite technological maturity for immediate implementation in nuclear material accountancy at a liquid-fueled MSR facility. While several promising techniques are identified, there is a critical lack of experimental data for most systems in the context of molten salt applications.
The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following the demise of the breeder reactor program in the United States, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. FFTF operations ceased in April 1992 after a determination by DOE that no combination of proposed missions was financially feasible over a ten-year period. The reactor is currently deactivated and in a long-term surveillance and maintenance (S&M) mode. This report provides information on the extensive and rigorous process that was used to conduct turnover from construction followed by acceptance and startup testing of the FFTF. This paper is in support of the Gateway for Accelerated Innovation in Nuclear (GAIN), which provides the nuclear energy community with access to the technical, regulatory, and financial support necessary to move new or advanced nuclear reactor designs toward commercialization while ensuring the continued safe, reliable, and economic operation of the existing nuclear fleet. The information obtained from the design, startup, and operation of the FFTF provides valuable insight for follow-on reactor projects, such as the Versatile Test Reactor (VTR), in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, reactor startup and operations, and reactor deactivation and decommissioning (D&D). The focus of this report is on the process used to startup the FFTF and to ensure that operations could be conducted efficiently and safely. A reference section is provided of documents detailing the successful turnover and testing process implemented for startup of the reactor and its supporting systems. The documents listed can be retrieved upon request and are believed useful for future reactor startup endeavors.
Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)