Search NASA⌕ Search

SEARCH · Search NASA

Results for “Orbital Replacement Units”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Development and evaluation of a predictive algorithm for telerobotic task complexity

There is a wide range of complexity in the various telerobotic servicing tasks performed in subsea, space, and hazardous material handling environments. Experience with telerobotic servicing has evolved into a knowledge base used to design tasks to be 'telerobot friendly.' This knowledge base generally resides in a small group of people. Written documentation and requirements are limited in conveying this knowledge base to serviceable equipment designers and are subject to misinterpretation. A mathematical model of task complexity based on measurable task parameters and telerobot performance characteristics would be a valuable tool to designers and operational planners. Oceaneering Space Systems and TRW have performed an independent research and development project to develop such a tool for telerobotic orbital replacement unit (ORU) exchange. This algorithm was developed to predict an ORU exchange degree of difficulty rating (based on the Cooper-Harper rating used to assess piloted operations). It is based on measurable parameters of the ORU, attachment receptacle and quantifiable telerobotic performance characteristics (e.g., link length, joint ranges, positional accuracy, tool lengths, number of cameras, and locations). The resulting algorithm can be used to predict task complexity as the ORU parameters, receptacle parameters, and telerobotic characteristics are varied.

Gernhardt, M. L.↗

Supervised autonomous control, shared control, and teleoperation for space servicing

A local-remote telerobot system for single- and dual-arm supervised autonomy, shared control, and teleoperation has been demonstrated. The system is composed of two distinct parts: the local site, where the operator resides; and the remote site, where the robots reside. The system could be further separated into dual local sites communicating with a common remote site. This is valuable for potential space missions where a space based robotic system may be controlled either by a space based operator or by a ground based operator. Also, multiple modes of control integrated into a common system are valuable for satisfying different servicing scenarios. The remote site single arm control system is described, and its parameterization for different supervised autonomous control, shared control, and teleoperation tasks are given. Experimental results are also given for selected tasks. The tasks include compliant grasping, orbital replacement unit changeout, bolt seating and turning, electronics card removal and insertion, and door opening.

Backes, Paul G.↗

Structural design feasibility study of Space Station long spacer truss

The structural design and configuration feasibility of the long spacer truss assembly that will be used as part of the Space Station Freedom is the focus of this study. The structural analysis discussed herein is derived from the transient loading events presented in the Space Transportation System Interface Control Document (STS ICD). The transient loading events are liftoff, landing, and emergency landing loads. Quasi-static loading events were neglected in this study since the magnitude of the quasi-static acceleration factors is lower than that of the transient acceleration factors. Structural analysis of the proposed configuration of the long spacer truss with four longerons indicated that negative safety margins are possible. As a result, configuration changes were proposed. The primary configuration change suggested was to increase the number of truss longerons to six. The six-longeron truss appears to be a more promising structure than the four-longeron truss because it offers a positive margin of safety and more volume in its second bay (BAY2). This additional volume can be used for resupply of some of the orbital replacement units (such as a battery box). Note that the design effort on the long spacer truss has not fully begun and that calculations and reports of the negative safety margins are, to date, based on concept only.

Armand, Sasan C.↗

Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

Chladek, John T.↗

Evaluation of COSTAR mass handling characteristics in an environment. A simulation of the Hubble Space Telescope service mission

The STS-61 Shuttle mission, which took place in December 1993, was solely aimed at servicing the Hubble Space Telescope (HST). Successful completion of this mission was critical to NASA since it was necessary to rectify a flaw in the HST mirror. In addition, NASA had never scheduled a mission with such a high quantity of complex extravehicular activity. To meet the challenge of this mission, the STS-61 crew trained extensively in the Weightless Environment Test Facility at the Johnson Space Center and in the Neutral Buoyancy Simulator at the Marshall Space Flight Center. However, it was suspected that neutral buoyancy training might induce negative training by virtue of the viscous damping effect present in water. The mockups built for this training also did not have the mass properties of the actual orbital replacement units (ORUs). It was felt that the crew should be further trained on mockups with similar mass characteristics. A comprehensive study was designed to address these issues. The study was quantitative, and instrumentation was set up to measure and quantify the forces and moments experienced during ORU mass handling and remote manipulator system run conditions.

Rajulu, Sudhakar L.↗

Dexterous Orbital Servicing System (DOSS)

The Dexterous Orbiter Servicing System (DOSS) is a dexterous robotic spaceflight system that is based on the manipulator designed as part of the Flight Telerobotics Servicer program for the Space Station Freedom and built during a 'technology capture' effort that was commissioned when the FTS was cancelled from the Space Station Freedom program. The FTS technology capture effort yielded one flight manipulator and the 1 g hydraulic simulator that had been designed as an integrated test tool and crew trainer. The DOSS concept was developed to satisfy needs of the telerobotics research community, the space shuttle, and the space station. As a flight testbed, DOSS would serve as a baseline reference for testing the performance of advanced telerobotics and intelligent robotics components. For shuttle, the DOSS, configured as a movable dexterous tool, would be used to provide operational flexibility for payload operations and contingency operations. As a risk mitigation flight demonstration, the DOSS would serve the International Space Station to characterize the end to end system performance of the Special Purpose Dexterous Manipulator performing assembly and maintenance tasks with actual ISSA orbital replacement units. Currently, the most likely entrance of the DOSS into spaceflight is a risk mitigation flight experiment for the International Space Station.

Price, Charles R.↗

Feasibility of flywheel energy storage systems for applications in future space missions

The objective of this study was to examine the overall feasibility of deploying electromechanical flywheel systems in space used for excess energy storage. Results of previous Rocketdyne studies have shown that the flywheel concept has a number of advantages over the NiH2 battery, including higher specific energy, longer life and high roundtrip efficiency. Based on this prior work, this current study was broken into four subtasks. The first subtask investigated the feasibility of replacing the NiH2 battery orbital replacement unit (ORU) on the international space station (ISSA) with a flywheel ORU. In addition, a conceptual design of a generic flywheel demonstrator experiment implemented on the ISSA was completed. An assessment of the life cycle cost benefits of replacing the station battery energy storage ORU's with flywheel ORU's was performed. A fourth task generated a top-level development plan for critical flywheel technologies, the flywheel demonstrator experiments and its evolution into the production unit flywheel replacement ORU.

Santo, G. Espiritu↗

Pump and Flow Control Subassembly of Thermal Control Subsystem for Photovoltaic Power Module

The pump and flow control subassembly (PFCS) is an orbital replacement unit (ORU) on the Space Station Freedom photovoltaic power module (PVM). The PFCS pumps liquid ammonia at a constant rate of approximately 1170 kg/hr while providing temperature control by flow regulation between the radiator and the bypass loop. Also, housed within the ORU is an accumulator to compensate for fluid volumetric changes as well as the electronics and firmware for monitoring and control of the photovoltaic thermal control system (PVTCS). Major electronic functions include signal conditioning, data interfacing and motor control. This paper will provide a description of each major component within the PFCS along with performance test data. In addition, this paper will discuss the flow control algorithm and describe how the nickel hydrogen batteries and associated power electronics will be thermally controlled through regulation of coolant flow to the radiator.

Motil, Brian↗

Evaluation of space station ATCS evolution growth paths

This paper determines the feasibility of potential Active Thermal Control System (ATCS) growth paths by assessing thermal, integration, and implementation impacts. Thermal Radiation Analysis System/Infrared Radiation Transfer (TRASYS/IRTRAN) models were used to evaluate the effects of increased radiator temperature, increased radiator area, and radiator wing addition on Space Station Freedom (SSF) elements, including energy reflected back to the ATCS. Systems Improved Numerical Differencing Analyzer/Fluid Integrator (SINDA/FLUINT) models were used to determine the heat rejection capability of an ATCS loop with an integrated heat pump that operates with Electric Power System (EPS) peak power. The effects of upgrading the ATCS by advanced technology Orbital Replacement Unit (ORU) implementation during maintenance replacements was also evaluated. The study results presented lead to conclusions on which paths are best suited for different growth scenarios.

Ames, Brian E.↗

Artificial neural network application for space station power system fault diagnosis

This study presents a methodology for fault diagnosis using a Two-Stage Artificial Neural Network Clustering Algorithm. Previously, SPICE models of a 5-bus DC power distribution system with assumed constant output power during contingencies from the DDCU were used to evaluate the ANN's fault diagnosis capabilities. This on-going study uses EMTP models of the components (distribution lines, SPDU, TPDU, loads) and power sources (DDCU) of Space Station Alpha's electrical Power Distribution System as a basis for the ANN fault diagnostic tool. The results from the two studies are contrasted. In the event of a major fault, ground controllers need the ability to identify the type of fault, isolate the fault to the orbital replaceable unit level and provide the necessary information for the power management expert system to optimally determine a degraded-mode load schedule. To accomplish these goals, the electrical power distribution system's architecture can be subdivided into three major classes: DC-DC converter to loads, DC Switching Unit (DCSU) to Main bus Switching Unit (MBSU), and Power Sources to DCSU. Each class which has its own electrical characteristics and operations, requires a unique fault analysis philosophy. This study identifies these philosophies as Riddles 1, 2 and 3 respectively. The results of the on-going study addresses Riddle-1. It is concluded in this study that the combination of the EMTP models of the DDCU, distribution cables and electrical loads yields a more accurate model of the behavior and in addition yielded more accurate fault diagnosis using ANN versus the results obtained with the SPICE models.

Momoh, James A.↗

Fault Diagnosis of Power Systems Using Intelligent Systems

The power system operator's need for a reliable power delivery system calls for a real-time or near-real-time Al-based fault diagnosis tool. Such a tool will allow NASA ground controllers to re-establish a normal or near-normal degraded operating state of the EPS (a DC power system) for Space Station Alpha by isolating the faulted branches and loads of the system. And after isolation, re-energizing those branches and loads that have been found not to have any faults in them. A proposed solution involves using the Fault Diagnosis Intelligent System (FDIS) to perform near-real time fault diagnosis of Alpha's EPS by downloading power transient telemetry at fault-time from onboard data loggers. The FDIS uses an ANN clustering algorithm augmented with a wavelet transform feature extractor. This combination enables this system to perform pattern recognition of the power transient signatures to diagnose the fault type and its location down to the orbital replaceable unit. FDIS has been tested using a simulation of the LeRC Testbed Space Station Freedom configuration including the topology from the DDCU's to the electrical loads attached to the TPDU's. FDIS will work in conjunction with the Power Management Load Scheduler to determine what the state of the system was at the time of the fault condition. This information is used to activate the appropriate diagnostic section, and to refine if necessary the solution obtained. In the latter case, if the FDIS reports back that it is equally likely that the faulty device as 'start tracker #1' and 'time generation unit,' then based on a priori knowledge of the system's state, the refined solution would be 'star tracker #1' located in cabinet ITAS2. It is concluded from the present studies that artificial intelligence diagnostic abilities are improved with the addition of the wavelet transform, and that when such a system such as FDIS is coupled to the Power Management Load Scheduler, a faulty device can be located and isolated from the rest of the system. The benefit of these studies provides NASA with the ability to quickly restore the operating status of a space station from a critical state to a safe degraded mode, thereby saving costs in experimentation rescheduling, fault diagnostics, and prevention of loss-of-life.

Momoh, James A.↗

Hubble Space Telescope - First Servicing Mission: Down to Earth Logistics - From GSFC to KSC and Back

The Hubble Space Telescope First Servicing Mission is a major accomplishment for NASA and has drawn world-wide attention and interest. The extravehicular servicing and repair activities performed by the STS-61 crew were the most ambitious ever undertaken. Their unprecedented success in performing on-orbit repair and maintenance, particularly in correcting the aberration in the primary mirror, has enabled the HST to provide sensational images and the anticipation of exciting scientific discoveries. Although the whole world watched the televised logistics activities (on-orbit maintenance) that took place in space, few are aware of the time and effort that went into planning and executing the space logistics that takes place with our feet on the ground. This paper addresses a major part of that effort - the packaging, handling, and transportation (PH&T) activities required to ship the GSFC HST space flight hardware and ground support equipment to KSC for launch and the post launch return to GSFC. It addresses the logistics and transportation planning for the containers for the Solar Array Carrier, the Orbital Replacement Unit Carrier, and the Flight Support System and their transporters, and the over land and water portions of the shipments.

Kubicko, Richard M.↗

STS-85 Day 05 Highlights

On this fifth day of the STS-85 mission, the flight crew, Cmdr. Curtis L. Brown, Jr., Pilot Kent V. Rominger, Payload Cmdr. N. Jan Davis (Ph.D.), Mission Specialists Robert L. Curbeam, Jr. and Stephen K. Robinson (Ph.D.), and Payload Specialist Bjarni V. Tryggvason once again test the small robotic arm serving as a prototype for one that will fly as part of the Japanese Experiment Module on the International Space Station. Simulated orbital replacement unit detachment and reattachment will be the focus. Bob Curbeam discusses the progress of the flight with a television station in St Louis, before continuing his work with the Bioreactor Demonstration System designed to perform cell biology experiments under controlled conditions. Immediately after Curbeam's interview, Canadian Payload Specialist Bjarni Tryggvason is set to talk to elementary and high school students at a summer camp in Saskatchewan, Canada.

Source record↗

Portable Fan Assembly for the International Space Station

NASA/ Marshall Space Flight Center (NASA/MSFC) is responsible for the design and fabrication of a Portable Fan Assembly (PFA) for the International Space Station (ISS). The PFA will be used to enhance ventilation inside the ISS modules as needed for crew comfort and for rack rotation. The PFA consists of the fan on-orbit replaceable unit (ORU) and two noise suppression packages (silencers). The fan ORU will have a mechanical interface with the Seat Track Equipment Anchor Assembly, in addition to the power supply module which includes a DC-DC converter, on/standby switch, speed control, power cable and connector. This paper provides a brief development history, including the criteria used for the fan, and a detailed description of the PFA operational configurations. Space Station requirements as well as fan performance characteristics are also discussed.

Jenkins, Arthur A.↗

STS-103 Payload Door Closure: Hubble Repair. Discovery

Live footage of the Discovery's cargo bay door closure is shown. Discovery's payload include an Orbital Replacement Unit Carrier that contains the tools and replacement parts necessary to service the HST and Flight Support System that will hold the telescope during servicing.

Source record↗

STS-103 Mission Highlights Resource Tape (1 of 2)

The STS-103 flight crew, Commander Curtis L. Brown, Pilot Scott J. Kelly, Mission Specialists Steven L. Smith, C. Michael Foale, John M. Grunsfeld, Claude Nicollier, and Jean-Francois Clervoy, are seen performing pre-launch activities such as crew suit-up, and ride out to the launch pad for a night launch. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the White Room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once on-orbit the primary objective is to capture and service the Hubble Space Telescope. Included are various live shots of the payload bay showing the flight support system, the orbiter replacement unit carrier and the forward fixture that house the new Fine Guidance System (FGS). Smith and Grunsfeld replaces and changes the sensor units during the first space walk of this mission. The second space walk by Nicollier and Foale includes the changing of the computer and installation of the FGS. This is tape 1 of 2, tape 2 has a report number of NONP-NASA-VT-2000036031.

Source record↗

STS-101: Crew Activity Report CAR/Flight Day 04 Highlights

On this fourth day of the STS-101 Atlantis mission, the flight crew, Commander James D. Halsell Jr., Pilot Scott J. Horowitz, and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev are seen performing final preparations for the scheduled space walk. Horowitz, Williams and Voss are seen in the mid-deck before the space walk. Horowitz and Weber are also seen in the flight deck, powering-up the robot-arm. During the space walk Voss is seen checking the American Cargo Crane-Orbital Replacement Unit Transfer Device. Voss and Williams are shown securing the American-built crane that was installed on the station last year. They are seen as they install the final parts (boom extension) of a Russian-built crane on the station. Voss and Williams are also shown as they replace a faulty antenna for one of the station's communications systems on the Unity Module, and install several handrails and a camera cable on the station's exterior.

Source record↗