Search NASA⌕ Search

SEARCH · Search NASA

Results for “PERMITTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Soil Sample Workplan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit (Part V, Special Condition #14 a-f)

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semi-volatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 7 and 8. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. Nitrate and all CAM17 metals have been added to the sampling plan to comply with DTSC comments received in correspondence dated June 4, 2021. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Geophysical Characterization and Monitoring of the 200 Area Treated Effluent Disposal Facility to Support Permit Renewal; TEDF Geophysical Monitoring

The Treated Effluent Disposal Facility (TEDF), located in the 200 East Area of the Hanford Site, is a site where non-hazardous and non-radioactive liquid wastes are disposed into two state-permitted infiltration basins. In 2016, the Washington State Department of Ecology denied a permit renewal request for TEDF due to the inability to adequately assess the impact of TEDF discharge water on the underlying groundwater quality. TEDF overlies the relatively impermeable Ringold Lower Mud (RLM) unit, whose upper contact lies in the vadose zone approximately 30 m below ground surface and approximately 10 m above the water table boundary. The RLM is assumed to isolate TEDF discharge water from the natural groundwater aquifer, which is monitored using wellbores screened below the RLM. Therefore, samples collected from monitoring wells near TEDF are not considered representative of TEDF discharge water. Rather, TEDF discharge water is assumed to mound on top of the RLM to form a perched aquifer. To support permitting of the TEDF, a new monitoring well is required that can be used to sample water from the presumed perched water aquifer above the RLM. Ideally, the screened section of the well would be located at the peak of the perched water mound(s), which presumably occurs at the point of maximum vertical flux from TEDF to the RLM, or equivalently where the dominant infiltration flow paths reach the RLM. This report describes how time-lapse 3D electrical resistivity tomography (ERT) was used in conjunction with nominal TEDF discharge operations to image the dominant flow paths from each pond to the RLM. Results are summarized in Figure ES.1. Figure ES.1A shows a satellite image of the TEDF overlain by an array of surface ERT electrodes. The solid and dashed black circles denote the zones of maximum vertical flux at the RLM within the south and north ponds, respectively, and presumably the regions where perched water peaks during discharge. Figure ES.1B shows time-lapse difference imaging results approximately 15 days after switching discharge from the south pond to the north pond. Blue iso-surfaces beneath the north pond denote regions of increasing bulk electrical conductivity caused by increasing saturation due to infiltrating water. Red iso-surfaces beneath the south pond denote regions that were previously saturated during the south pond discharge and are now de-saturating, causing a decrease in bulk electrical conductivity. In both cases, the zones of maximum change mark the dominant flow paths to the RLM. Figure ES.1C shows time-lapse imaging results approximately 15 days after switching discharge from the north pond to the south pond. In this case, blue iso-surfaces mark the dominant flow paths to the RLM from the south pond. The red iso-surfaces mark the dominant flow paths that existed during discharge to the north pond. The regions of maximum change in bulk conductivity (due to saturation or desaturation) that mark the primary flow paths are equivalent in both cases and denoted by the dashed solid and black circles. If a perched water zone forms on the RLM, it is likely to mound within or near the dashed circle during discharge to the north pond, and in the solid circle during discharge to the south pond. In other words, if perched water mounding occurs, the circles mark the optimum locations suggested by the ERT imaging for monitoring boreholes to be placed, enabling samples to be collected that are representative of TEDF discharge impacts on groundwater quality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Marine and Hydrokinetic Devices

Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale, and for commercial arrays. This work is carried out under the U.S. Department of Energy reference model project, with the costs for engineering, deployment strategies, mooring and anchoring configurations, and maintenance operations, being developed by a consortium of Department of Energy national laboratories and universities. The goal of the reference model is to assist the MHK industry to become a cost-competitive contributor of renewable energy, by identifying those aspects of MHK projects that contribute significantly to the cost of energy, and directing research funding towards lowering those costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Mixed Waste Storage Unit (MWSU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application to the Nevada Division of Environmental Protection focuses on continued operation of the Mixed Waste Storage Unit at the Nevada National Security Site (NNSS), under the auspices of DOE’s National Nuclear Security Administration Nevada Field Office (NNSA/NFO). Low-level mixed waste (LLMW) accepted at the NNSS contains both radioactive and hazardous material components as defined by various laws and regulations. The Mixed Waste Storage Unit (MWSU) is located at the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC are used to store LLMW generated at or shipped to the NNSS prior to disposal at the Mixed Waste Disposal Unit (MWDU). The document describes the MWSU, its general design, its operation, the materials it stores, and relevant health and safety regulations with which NNSS complies. The currently permitted MWSU has been operated since December 2010. Each of the four designated storage areas is RCRA-compliant for the storage of hazardous waste. This application represents a renewal request by DOE for the permitted MWSU. For security reasons, some of the contents of the full application are not available for public viewing. This version of the application contains most but not all of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reuse Permit I-160-02Quality Assurance Project Plan (QAPP) for Required Environmental and Process MonitoringIdaho National Laboratory Materials and Fuels Complex Industrial Waste Ditch and Pond

The purpose of this quality assurance project plan (QAPP) is to describe the technical requirements and quality assurance (QA) activities of the environmental data collection/analyses operations to be performed under Reuse Permit I-160-02, Modification 1 (hereafter ‘permit’). It describes the scope of monitoring, the organization and persons involved, the data quality objectives, the monitoring procedures, and the specific quality control (QC) measures to be employed. All QAPP activities are implemented to determine whether the results of the sampling and monitoring performed are the right type, quantity, and quality to satisfy the requirements of the permit, Section 5.

99 GENERAL AND MISCELLANEOUS↗

Air Permit Compliance for Hanford Waste Retrieval Operations Involving Multi-Unit Emissions

Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT OPERATIONS

Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diagnosing added value of convection-permitting regional models using precipitation event identification and tracking

Dynamical downscaling with high-resolution regional climate models may offer the possibility of realistically reproducing precipitation and weather events in climate simulations. As resolutions fall to order kilometers, the use of explicit rather than parametrized convection may offer even greater fidelity. However, these increased resolutions both allow and require increasingly complex diagnostics for evaluating model fidelity. Here we focus on precipitation evaluation and analyze five 2-month-long dynamically downscaled model runs over the continental United States that employ different convective and microphysics parameterizations, including one high-resolution convection-permitting simulation. All model runs use the Weather Research and Forecasting Model driven by National Center for Environmental Prediction reanalysis data. We show that employing a novel rainstorm identification and tracking algorithm that allocates essentially all rainfall to individual precipitation events allows new insights into model biases. Results include that, at least in these runs, model wet bias is driven by excessive areal extent of individual precipitating events, and that the effect is time-dependent, producing excessive diurnal cycle amplitude. This amplified cycle is driven not by new production of events but by excessive daytime enlargement of long-lived precipitation events. Here, we further show that in the domain average, precipitation biases appear best represented as additive offsets. Of all model configurations evaluated, convection-permitting simulations most consistently reduced biases in precipitation event characteristics.

54 ENVIRONMENTAL SCIENCES↗

Geothermal Permitting and NEPA Timeline Analysis

In this analysis, we outline the types of NEPA-related analyses and approvals (e.g., environmental assessment), and we provide examples of geothermal development activities (e.g., well drilling) that might require each type of approval, including an overview and discussion of the specific permits. We conducted an in-depth analysis of timelines specific to each NEPA analysis type, and we analyzed a sample of geothermal projects to identify factors that increased NEPA review timelines. Based on that analysis, we identified proven and potential strategies that can assist geothermal projects by lowering the time necessary to navigate the NEPA process, while maintaining the efficacy of the federal environmental review intact. We also identified areas of potential improvement in NEPA efficiency within each phase of geothermal development. Shortening project timelines can effectively decrease the perceived risk profiles of geothermal development projects. This submission includes a paper, poster, and presentation for the Geothermal Resources Council (GRC) summarizing geothermal permitting and NEPA timeline analysis. Also included are two spreadsheets detailing the NEPA timeline analysis and environmental assessments (EA).

15 GEOTHERMAL ENERGY↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗

Evaluation of precipitation across the contiguous United States, Alaska, and Puerto Rico in multi-decadal convection-permitting simulations

Abstract This study is an early effort to generate a multi-decadal convection-permitting regional climate dataset that covers nearly the entire North American continent. We assessed a 20 year dynamically downscaled regional climate simulation at a 4 km spatial resolution with explicit convection across the contiguous United States (CONUS), Alaska, and Puerto Rico. Specifically, we evaluated the model’s performance in representing mean, 95th percentile, and extreme precipitation across regions. Our findings indicate that when compared with ERA5 reanalysis, the forcing data, convection-permitting simulation improves representations of seasonal, 95th percentile, and extreme precipitation over a large portion of the CONUS, Alaska, and Puerto Rico, particularly in areas where precipitation is heaviest. The simulation adds value over its forcing data (ERA5) in up to 53% of all grid cells in the CONUS, 68.8% in Alaska, and 84.0% in Puerto Rico. It is important to note that, however, despite improvements, model errors in Puerto Rico remain large. Similar improvements are observed in extreme indices, including consecutive dry days, maximum 5 days precipitation, and extreme precipitation. Analysis of the diurnal cycle of mean hourly precipitation suggests that representations of convective processes—including onset, dissipation, suppression, downstream propagation, and local circulation—improved overall.

54 ENVIRONMENTAL SCIENCES↗

Transportation of Large Wind Components: A Permitting and Regulatory Review

This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

17 WIND ENERGY↗

Summary Overview of Content Guidance For Early Site Permit Applications

The Early Site Permit (ESP) process offered under Title 10 Code of Federal Regulations (CFR) Part 52, Subpart A, was promulgated by the Nuclear Regulatory Commission (NRC) in 1989 to address industry concerns with the former licensing process under 10 CFR Part 50. Previously, the licensing process required large expenditures of time and money by applicants well before key site specific environmental, safety, and emergency planning issues could be resolved. As envisioned, the ESP process is meant to resolve these issues well in advance of when a decision is made to build a nuclear power facility and before substantial capital is invested in the construction of a new nuclear facility. The ESP application is required to provide design information pertaining to structures, systems, and components along with site-specific parameters (such as meteorology, demographics, and hydrology) and address site safety, environmental protection, and emergency planning. Although an ESP applicant does not need to specify a particular nuclear plant design, as in construction permit applications, it does need to provide sufficient surrogate design information (developed to bound the nuclear plant design(s) that are being considered by the applicant) so that the NRC can make a determination on the acceptability of the site and the environmental impacts, and determine whether designs bounded by the surrogate design information provided by the applicant can be qualified for the proposed site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Workshop Summary Report on Using AI Tools to Improve the Efficiency and Outcomes of the NEPA Process: AI for Permitting Workshop at the 2025 National Association of Environmental Professionals (NAEP) Annual Conference

On April 29, 2025, the U.S. Department of Energy and Pacific Northwest National Laboratory hosted a workshop at the National Association of Environmental Professionals 2025 Conference and Training Symposium in Charleston, South Carolina, titled, “Effective and Responsible Use of Customized AI Tools to Improve the Efficiency and Outcomes of the NEPA Process.” The objectives of this workshop were to make environmental practitioners aware of the potential for using artificial intelligence in the National Environmental Policy Act process, demonstrate examples of how artificial intelligence can be integrated effectively to improve efficiency and outcomes and solicit questions and feedback from practitioners. This report summarizes the key points from all talks and case studies, as well as audience questions and feedback on the presentation topics and the broader topic of "AI in permitting". The report concludes by highlighting the key barriers and opportunities for the implementation of AI in permitting, as discussed during the workshop.

54 ENVIRONMENTAL SCIENCES↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stations Tool for Automated Permitting (S-TAP) User Manual

The Stations Tool for Automated Permitting (S-TAP) is a spreadsheet-based plan review questionnaire designed to help automate and expedite the electric vehicle supply equipment (EVSE) permitting process. This manual goes into detail on the development of the tool and guidance for use cases of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deployment of CCS Technologies across the Load Curve for a Competitive Electricity Market as a Function of CO2 Emissions Permit Prices

Consistent with other published studies, the modelling presented here reveals that baseload power plants are the first aspects of the electricity sector to decarbonize and are essentially decarbonized once CO2 permit prices exceed a certain threshold ($90/ton CO2 in this study). The decarbonization of baseload electricity is met by significant expansions of nuclear power and renewable energy generation technologies as well as the application of carbon dioxide capture and storage (CCS) technologies applied to both coal and natural gas fired power plants. Relatively little attention has been paid thus far to whether intermediate and peaking units would respond the same way to a climate policy given the very different operational and economic context that these kinds of electricity generation units operate under. In this paper, the authors discuss key aspects of the load segmentation methodology used to imbed a varying electricity demand within the GCAM (a state-of-the-art Integrated Assessment Model) energy and economic modelling framework and present key results on the role CCS technologies could play in decarbonizng subpeak and peak generation (encompassing only the top 10% of the load) and under what conditions. To do this, the authors have modelled two hypothetical climate policies that require 50% and 80% reductions in US emissions from business as usual by the middle of this century. Intermediate electricity generation is virtually decarbonized once carbon prices exceed approximately $150/tonCO2. When CO2 permit prices exceed $160/tonCO2, natural gas power plants with CCS have roughly the same marketshare as conventional gas plants in serving subpeak loads. The penetration of CCS into peak load (upper 6% here) is minimal under the scenarios modeled here suggesting that CO2 emissions from this aspect of the U.S. electricity sector would persist well into the future even with stringent CO2 emission control policies in place.

01 COAL, LIGNITE, AND PEAT↗

Biorefinery upgrading of herbaceous biomass to renewable hydrocarbon fuels, Part 2: Air pollutant emissions and permitting implications

The development of advanced biofuel production facilities is still at a nascent stage, and the biorefineries could face challenges in obtaining air permits required for their construction and operation because they are novel emission sources. To fill gaps in knowledge regarding potential emissions, we perform a detailed federal regulatory analysis and estimate air pollutant emissions for an advanced biorefinery that produces renewable diesel blendstock (RDB) from lignocellulosic biomass via aerobic respiration documented in Part 1 of the paper. We evaluate 12 design permutations that include two feedstocks, a uniform format blend (UFB) and corn stover; three biorefinery scales, 2,000, 5,200, and 9,100 dry metric tons per day (dmtd) of lignocellulosic biomass feed; and two lignin uses, as either a boiler fuel or for pellet production. We also evaluate 6 additional design permutations by incorporating non-emitting renewable power, which could reduce up to 63% carbon monoxide (CO) and nitrogen oxides (NO x ) each, 21% volatile organic compounds (VOC), and 43% hazardous air pollutants (HAP) as opposed to on-site power production, for biorefineries that produce pellets, using either UFB or corn stover. Our results indicate that all 18 design permutations would be classified as a major source under the Clean Air Act's New Source Review program without additional emission controls. Compared to using lignin as a boiler fuel, diverting lignin for pellet production reduces the emissions of CO up to 88%, NOx up to 73%, sulfur dioxide (SO 2 ) up to 99%, VOCs up to 72%, and HAPs up to 66%. Additionally, we explore control options that could further reduce emissions and assess whether reductions are enough to achieve minor source classification. Insights from our analysis can help biorefinery developers and regulators develop permitting strategies to mitigate investment risks.

09 BIOMASS FUELS↗