Search NASA⌕ Search

SEARCH · Search NASA

Results for “POWER LINES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Building Large-Scale U.S. Synthetic Electric Distribution System Models

Rapid increases in distributed energy resources on distribution systems are prompting research efforts to improve and evaluate electric power distribution algorithms; however, there is a shortage of realistic, large-scale, U.S.-style test systems for the evaluation of such advanced algorithms. Some available tools to build large-scale test systems are of European style, and their application to studies focused on the United States might not be desirable given very different characteristics between the European and U.S. distribution designs. Motivated by this need, this paper develops detailed algorithms to build large-scale U.S. distribution systems and incorporates them in a new Reference Network Model, RNM-US. The approach starts with information from street maps and a catalog with electric equipment that includes power lines, transformers, voltage regulators, capacitors, and switching devices. The paper presents the algorithms through an illustrative case study of the different steps that comprise the process of building a synthetic distribution grid. Finally, the paper presents a medium- and a large-scale data set covering 10 million electrical nodes and 120,000 km of power lines, demonstrating the applicability of the proposed method to build very large-scale synthetic distribution systems.

27 ARPA - Advanced Research Projects Agency-Energy↗

RF model of the distribution system as a communication channel, phase 2. Volume 2: Task reports

Based on the established feasibility of predicting, via a model, the propagation of Power Line Frequency on radial type distribution feeders, verification studies comparing model predictions against measurements were undertaken using more complicated feeder circuits and situations. Detailed accounts of the major tasks are presented. These include: (1) verification of model; (2) extension, implementation, and verification of perturbation theory; (3) parameter sensitivity; (4) transformer modeling; and (5) compensation of power distribution systems for enhancement of power line carrier communication reliability.

Rustay, R. C.↗

Roads do not increase carrion use by a vertebrate scavenging community

Wildlife-vehicle collisions introduce a considerable amount of carrion into the environment, but scavenger use of this resource has not been extensively investigated. Scavengers may use roads for reliable foraging opportunities, but might also use roads for other purposes and encounter carrion opportunistically. We examined scavenging of carrion along linear features by placing 52 rabbit carcasses in each of three treatments in forested habitat during winter (Dec 2016-Mar 2017) in South Carolina, USA: roads, power line clearings (linear feature with fewer carcasses than roads due to lack of road kill), and forest interior. We used motion-activated cameras to compare arrival times and presence of vertebrate scavengers among treatments. There was no difference in proportion of carcasses scavenged or scavenger arrival time across treatments. No species arrived at roads quicker than other treatments. Turkey vultures (Cathartes aura) and coyotes (Canis latrans) scavenged equally across treatments, whereas gray foxes (Urocyon cinereoargenteus) scavenged along roads and power lines, but not in forests. We suggest that scavenger use of carrion near roads at this location during winter relates to factors other than carrion availability. Because some scavengers readily consumed carrion on roads, this resource has the potential to influence the ecology of these species.

54 ENVIRONMENTAL SCIENCES↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical-Impedance-Based Ice-Thickness Gauges

Langley Research Center has developed electrical-impedance-based ice-thickness gauges and is seeking partners and collaborators to commercialize them. When used as parts of active monitoring and diagnostic systems, these gauges make it possible to begin deicing or to take other protective measures before ice accretes to dangerous levels. These gauges are inexpensive, small, and simple to produce. They can be adapted to use on a variety of stationary and moving structures that are subject to accumulation of ice. Examples of such structures include aircraft, cars, trucks, ships, buildings, towers, power lines (see figure), power-generating equipment, water pipes, freezer compartments, and cooling coils. A gauge of this type includes a temperature sensor and two or more pairs of electrically insulated conductors embedded in a surface on which ice could accumulate. The electrical impedances of the pairs of conductors vary with the thickness of any ice that may be present. Somewhat more specifically, when the pairs of conductors are spaced appropriately, the ratio between their impedances is indicative of the thickness of the ice. Therefore, the gauge includes embedded electronic circuits that measure the electrical impedances, plus circuits that process the combination of temperature and impedance measurements to determine whether ice is present and, if so, how thick it is. Of course, in the processing of the impedance measurements, the temperature measurements help the circuitry to distinguish between liquid water and ice. The basic design of a gauge of this type can be adapted to local conditions. For example, if there is a need to monitor ice over a wide range of thickness, then the gauge can include more than two sets of conductors having various spacings.

Weinstein, Leonard↗

Local and utility-wide cost allocations for a more equitable wildfire-resilient distribution grid

Climate-induced extreme weather conditions make electricity infrastructure more vulnerable. They increase the risk of power-line-ignited wildfires which can, in turn, jeopardize electric power delivery. Here, leveraging machine learning, we show that lower-income communities in California not only have lower fractions of power distribution lines undergrounded, but overhead lines and poles in their neighbourhoods are also more vulnerable to wildfires. Should they bear the cost of undergrounding fire-prone lines themselves, they would have to pay a disproportionately higher cost per household. We propose a cost allocation scheme with an income threshold below which the cost is borne by utility-wide ratepayers and above which the cost is borne locally. This scheme can not only minimize the average of undergrounding costs per household as a share of income, but also homogenize such cost–income ratios across communities. Furthermore, our research demonstrates the opportunity to appropriately integrate existing policies to make electricity infrastructure affordable, equitable and reliable amidst climate change.

24 POWER TRANSMISSION AND DISTRIBUTION↗

De-Energized Line Testing Interface (DELTI) Report

To guarantee the safety of power system operations, it is crucial to understand a de-energized power line’s status before restoring power. It is hypothesized that the Grid Resonance Probe (GRP) and De-Energized Line Testing Interface (DELTI) can be utilized to identify a faulted distribution line. Therefore, the project team is targeting development of a methodology to identify faulted distribution lines by using the DELTI system. In this R&D task, two field tests on Plum Island have been conducted, including DELTI tests with multiple configurations and fault scenarios. This report provides the analysis results of distribution line fault identification from the two field tests. In the remainder of this report, Section 1 is the introduction of the DELTI system, Section 2 provides the analyses of the two field tests in June and October of 2021, respectively, Section 3 discusses the existing line fault detection devices on market and how they compare to DELTI and Section 4 includes the lessons learned and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SiC Multi-Chip Power Modules as Power-System Building Blocks

The term "SiC MCPMs" (wherein "MCPM" signifies "multi-chip power module") denotes electronic power-supply modules containing multiple silicon carbide power devices and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking. Moreover, the higher-temperature capabilities of SiC MCPMs could enable operation in environments hotter than Si-based power systems can withstand. The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules. In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications: typical functions could include regulating voltages, storing energy, and driving motors. Because identical SiC MCPM building blocks could be utilized in a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. Several prototype DC-to-DC power-converter modules containing SiC power-switching devices were designed and built to demonstrate the feasibility of the SiC MCPM concept. In anticipation of a future need for operation at high temperature, the circuitry in the modules includes high-temperature inductors and capacitors. These modules were designed to be stacked to construct a system of four modules electrically connected in series and/or parallel. The packaging of the modules is designed to satisfy requirements for series and parallel interconnection among modules, high power density, high thermal efficiency, small size, and light weight. Each module includes four output power connectors two for serial and two for parallel output power connections among the modules. Each module also includes two signal connectors, electrically isolated from the power connectors, that afford four zones for signal interconnections among the SOI controllers. Finally, each module includes two input power connectors, through which it receives power from an in-line power bus. This design feature is included in anticipation of a custom-designed power bus incorporating sockets compatible with snap-on type connectors to enable rapid replacement of failed modules.

Lostetter, Alexander↗

Arc burst pattern analysis fault detection system

A method and apparatus are provided for detecting an arcing fault on a power line carrying a load current. Parameters indicative of power flow and possible fault events on the line, such as voltage and load current, are monitored and analyzed for an arc burst pattern exhibited by arcing faults in a power system. These arcing faults are detected by identifying bursts of each half-cycle of the fundamental current. Bursts occurring at or near a voltage peak indicate arcing on that phase. Once a faulted phase line is identified, a comparison of the current and voltage reveals whether the fault is located in a downstream direction of power flow toward customers, or upstream toward a generation station. If the fault is located downstream, the line is de-energized, and if located upstream, the line may remain energized to prevent unnecessary power outages.

Russell, B. Don↗

A study on improvement of discharge characteristic by using a transformer in a capacitively coupled plasma

In a plasma discharge system, the power loss at powered line, matching network, and other transmission line can affect the discharge characteristics such as the power transfer efficiency, voltage and current at powered electrode, and plasma density. In this paper, we propose a method to reduce power loss by using a step down transformer mounted between the matching network and the powered electrode in a capacitively coupled argon plasma. This step down transformer decreases the power loss by reducing the current flowing through the matching network and transmission line. As a result, the power transfer efficiency was increased about 5%–10% by using a step down transformer. However, the plasma density was dramatically increased compared to no transformer. This can be understood by the increase in ohmic heating and the decrease in dc-self bias. By simply mounting a transformer, improvement of discharge efficiency can be achieved in capacitively coupled plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Damping inter-area oscillation using reinforcement learning controlled TCSC

Appropriate damping control of the inter-area oscillation would ensure the grid stability and maintain the tie-line power transfer capability. In this paper, we proposed a novel reinforcement learning (RL) based power oscillation damping (POD) controller that uses Thyristor Controlled Series Compensators (TCSC) to damp inter-area oscillations. By leveraging the unbiased gradient direction estimation of the natural evolution strategy (NES), we successfully regulated the power flows on the tie-lines and damped inter-area oscillations through dynamically modulating the inserted reactance of the TCSC. The proposed RL-based POD controller has been tested on both two-area four-machine system and North American Minni-WECC system. Extensive studies have demonstrated the excellent performance of the proposed RL-based TCSC POD controller in damping inter-area oscillations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Security constrained optimal power shutoff for wildfire risk mitigation

Abstract Electric grid faults are increasingly the source of ignition for major wildfires. To reduce the likelihood of such ignitions in high risk situations, utilities use preemptive de‐energization of power lines, commonly referred to as Public Safety Power Shutoffs (PSPS). Besides raising challenging trade‐offs between power outages and wildfire safety, PSPS removes redundancy from the network at a time when component faults are likely to happen. This may leave the network particularly vulnerable to unexpected line faults that may occur while the PSPS is in place. Previous works have not explicitly considered the impacts of these outages. To address this gap, the Security Constrained Optimal Power Shutoff problem is proposed which uses post‐contingency security constraints to model the impact of unexpected line faults when planning a PSPS. This model enables, for the first time, the exploration of a wide range of trade‐offs between both wildfire risk and pre‐ and post‐contingency load shedding when designing PSPS plans, providing useful insights for utilities and policy makers considering different approaches to PSPS. The efficacy of the model is demonstrated using the EPRI 39‐bus system as a case study. The results highlight the potential risks of not considering security constraints when planning PSPS and show that incorporating security constraints into the PSPS design process improves the resilience of current PSPS plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mechanical Solutions Scan Report

Power lines, poles, and towers are the backbone of the United States (U.S.) electric-power grid. These transmission and distribution networks route electricity from generator to loads. The characteristics of these routes are rapidly changing -- trending towards decentralized renewable generation, electric heating, vehicle charging, and large data-center loads. Coupled with aging infrastructure and the increased frequency of extreme weather events, there is concern about the future reliability and transmission capacity of conductors and adjacent components. This scan report seeks to provide an overview of mechanical solutions to challenges caused by extreme weather events associated with components of transmission and distribution infrastructure, including conductor heat sag, ice accumulation, wind, and wildfire. Many options could increase transmission capacity or reliability, and these are at various stages of technological readiness. Some have only been lab tested, while some have been widely deployed in the U.S. or overseas for decades. The solution categories and providers featured in this report are intended to be comprehensive at the time of publication and to serve as a reference for decision-makers concerned about transmission and distribution reliability. There are two other categories of large, complex solutions, which are not covered in this report: replacing existing conductors with advanced conductors and implementing digital grid enhancing technologies. A separate scan report titled “Advanced Conductor Scan Report,” which discusses advanced carbon-core conductors, was published by the Idaho National Laboratory (INL) in 2023. Information on digital technologies, such as dynamic line ratings, power-flow controllers, and other power electronics and communications-based devices, can be found on the Grid- Enhancing Technologies landing page. Mechanical grid-enhancing technologies, or solutions covered in this report, often do not require full equipment replacement and do not rely on digital components. Mechanical technologies are overlooked because they may be older, simpler, or seemingly “more obvious” than digital or carbon-core technologies. However, it is wise to consider mechanical solutions in a thorough evaluation of grid enhancing technology solutions.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Determination of High-Frequency Current Distribution Using EMTP-Based Transmission Line Models with Resulting Radiated Electromagnetic Fields

Application of BPL technologies to existing overhead high-voltage power lines would benefit greatly from improved simulation tools capable of predicting performance - such as the electromagnetic fields radiated from such lines. Existing EMTP-based frequency-dependent line models are attractive since their parameters are derived from physical design dimensions which are easily obtained. However, to calculate the radiated electromagnetic fields, detailed current distributions need to be determined. This paper presents a method of using EMTP line models to determine the current distribution on the lines, as well as a technique for using these current distributions to determine the radiated electromagnetic fields.

24 POWER TRANSMISSION AND DISTRIBUTION↗