Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRA Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

A Simulation-Based Dynamic Approach for External Flooding Analysis in Nuclear Power Plants

All nuclear power plants must consider and evaluate external flooding risks such as local intense precipitation, dam failure, and coastal flooding due to storm surge or tsunami. While these events could challenge off-site power and other plant structure integrity, threaten plant safety systems and components, and limit plant access, they are more than often qualitatively regarded as risk insignificant and screened out from detailed evaluation and quantification. The recent lessons learned from the Fukushima seismic/tsunami initiated nuclear accident (2011), the Fort Calhoun (2011), Vermont Yankee (2013), Arkansas Nuclear One (2013), and St. Luice (2014) flooding events showed otherwise. However, developing an external flood model with traditional event tree/fault tree approach as in a static probabilistic risk assessment (PRA) model could be difficult to accurately represent plant system and component behavior and reliability of manual actions during an ever-progressing flood event. The plant response to external flood may be highly spatial- and time- dependent and subject to the hydrological and hydraulic characteristics of the flood event. Such unique challenges prompt the investigation of using the simulation-based dynamic analysis approaches for external flood risk assessment. Simulation methods can better illustrate the performance of structures, systems, and components during an external flooding event. A general framework to perform a simulation-based dynamic flooding analysis is presented in this paper with the sub-tasks of flood hazard analysis, flood fragility analysis, plant response modeling, safety margin analysis or PRA quantification. A new type of State PRA modeling technique is introduced to incorporate time-related interactions such as those from 3D simulations into a traditional PRA model.

99 GENERAL AND MISCELLANEOUS↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimization Method to Branch and Bound Large SBO State Spaces Under Dynamic Probabilistic Risk Assessment via use of LENDIT Scales and S2R2 Sets

Traditional Probabilistic Risk Assessment (PRA) methods have been developed and are quite effective in evaluating risk associated with complex systems, but lack the capability to evaluate complex dynamic systems. These time and energy scales associated with the transient may vary as a function of transition time to a different physical state. Dynamic PRA (DPRA) methods provide a more rigorous analysis of complex dynamic systems, while complete, results in issues associated with combinatorial explosion. In order to address the combinatorial complexity arising from the number of possible state configurations and discretization of transition times, a characteristic scaling metric (LENDIT – length, energy, number, distribution, information and time) is proposed as a means to describe systems uniformly and thus provide means to describe relational constraints expected in the dynamics of a complex (coupled) systems. Thus when LENDIT is used to characterize four sets – ‘state, system, resource and response’ (S2R2) – describing reactor operations (normal and off-normal), LENDIT and S2R2 in combination have the potential to ‘branch and bound’ the state space investigated by DPRA. In this paper we introduce the concept of LENDIT scales and S2R2 sets applied to a branch-and-bound algorithm and apply the methods to a station black out transient (SBO).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Branch-and-Bound algorithm applied to uncertainty quantification of a Boiling Water Reactor Station Blackout

Evaluation of the impacts of uncertainty and sensitivity in modeling presents a significant set of challenges in particular to high fidelity modeling. Computational costs and validation of models creates a need for cost effective decision making with regards to experiment design. Experiments designed to validate computation models can be used to reduce uncertainty in the physical model. In some cases, large uncertainty in a particular aspect of the model may or may not have a large impact on the final results. For example, modeling of a relief valve may result in large uncertainty, however, the actual effects on final peak clad temperature in a reactor transient may be small and the large uncertainty with respect to valve modeling may be considered acceptable. Additionally, the ability to determine the adequacy of a model and the validation supporting it should be considered within a risk informed framework. Low fidelity modeling with large uncertainty may be considered adequate if the uncertainty is considered acceptable with respect to risk. In other words, models that are used to evaluate the probability of failure should be evaluated more rigorously with the intent of increasing safety margin. Probabilistic risk assessment (PRA) techniques have traditionally been used to identify accident conditions and transients. Traditional classical event tree methods utilize analysts’ knowledge and experience to identify the important timing of events in coordination with thermal-hydraulic modeling. These methods lack the capability to evaluate complex dynamic systems. In these systems, time and energy scales associated with transient events may vary as a function of transition times and energies to arrive at a different physical state. Dynamic PRA (DPRA) methods provide a more rigorous analysis of complex dynamic systems. Unfortunately DPRA methods introduce issues associated with combinatorial explosion of states. This study presents a methodology to address combinatorial explosion using a Branch-and-Bound algorithm applied to Dynamic Event Trees (DET), which utilize LENDIT (L – Length, E – Energy, N – Number, D – Distribution, I – Information, and T – Time) as well as a set theory to describe system, state, resource, and response (S2R2) sets to create bounding functions for the DET. The optimization of the DET in identifying high probability failure branches is extended to create a Phenomenological Identification and Ranking Table (PIRT) methodology to evaluate modeling parameters important to safety of those failure branches that have a high probability of failure. The PIRT can then be used as a tool to identify and evaluate the need for experimental validation of models that have the potential to reduce risk. Finally, in order to demonstrate this methodology, a Boiling Water Reactor (BWR) Station Blackout (SBO) case study is presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Supply and Resource Management to Progressively Enable EIMO

BACKGROUND: Current medical operations in Low Earth Orbit (LEO) allow for real-time audio-video communication with a flight surgeon at mission control, resupply, and medical evacuation to earth on the order of hours. As mission profiles change from LEO to the Moon, Mars, and beyond, medical risk as a contribution to overall mission risk is anticipated to rise substantially. Concurrently, due to the distance, the medical systems on board vehicles proposed for these mission types are expected to have reduced mass and volume allocation. Together, astronaut crews will be at a higher risk of major medical events, be required to perform a broader set of tasks, and have substantially reduced resources and support to do so. Earth Independent Medical Operations (EIMO) aims to identify and fill the gaps present in this progressively changing paradigm. OVERVIEW: Medical supplies, resources, and skills are central to spaceflight medical systems. Vehicles used for non-LEO missions are anticipated to be smaller and thus the medical system will also need to have reduced mass, volume, and power. Medical resources are another form of consumable and may need resupply or pre-deployment to meet crew needs. One particular concern is the degradation of medications which become less efficacious and potentially toxic with time, particularly given environmental conditions such as temperature, humidity, oxygen, and radiation which have not yet been fully studied. Supply and resource management in LEO is dependent on resupply, however the supply chain of transporting equipment does not yet have a clear infrastructure for missions beyond LEO. DISCUSSION: EIMO is intended to systemically identify and fill these gaps with forward-looking solutions. In mission monitoring of resources with technology like RFID, improving medical resource longevity, targeted resupply and careful pre-mission planning will be central to facilitate crew health and performance. One approach to optimizing resources is the Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool, which uses probabilistic risk assessment (PRA) to quantitatively predict medical risk and identify resources and skills that mitigate this risk. This evidence based, quantitative analysis prediction tool and several other approaches to meeting the challenge of supply and resource management are discussed.

Arian Anderson↗

Design for Reliability and Safety Approach for the New NASA Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new launch vehicles, the ARES I and ARES V. Specifically, the paper addresses the use of an integrated probabilistic functional analysis to support the design analysis cycle and a probabilistic risk assessment (PRA) to support the preliminary design and beyond.

Safie, Fayssal M.↗

Dynamic event tree analysis with the SAS4A/SASSYS-1 safety analysis code

The consequences of a transient in an advanced sodium-cooled fast reactor are difficult to capture with the traditional approach to probabilistic risk assessment (PRA). Numerous safety-relevant systems are passive and may have operational states that cannot be represented by binary success or failure. In addition, the specific order and timing of events may be crucial which necessitates the use of dynamic PRA tools such as ADAPT. The modifications to the SAS4A/SASSYS-1 sodium-cooled fast reactor safety analysis code for linking it to ADAPT to perform a dynamic PRA are described. A test case is used to demonstrate the linking process and to illustrate the type of insights that may be gained with this process. Finally, newly-developed dynamic importance measures are used to assess the significance of reactor parameters/constituents on calculated consequences of initiating events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

New Methods and Tools to Perform Safety Analysis within RISMC

The Risk Informed Safety Margins Characterization (RISMC) Pathway uses a systematic approach developed to characterize and quantify safety margins of nuclear power plant structures, systems and components. What differentiates the RISMC approach from traditional probabilistic risk assessment (PRA) is the concept of safety margin. In PRA, a safety metric such as core damage frequency (CDF) is generally estimated using static fault-tree and event-tree models. However, it is not possible to estimate how close we are to physical safety limits (say peak clad temperature) for most accident sequences described in the PRA. In the RISMC approach, what we want to understand is not just the frequency of an event like core damage, but how close we are (or not) to this event and how we might increase our safety margin through margin management strategies in a Dynamic PRA (DPRA) fashion. This paper gives an overview of methods that are currently under development at the Idaho National Laboratory (INL) with the scope of advance the current state of the art of dynamic PRA.

97 MATHEMATICS AND COMPUTING↗

Data Analysis Approaches for the Risk-Informed Safety Margins Characterization Toolkit

In the past decades, several numerical simulation codes have been employed to simulate accident dynamics (e.g., RELAP5-3D, RELAP-7, MELCOR, MAAP). In order to evaluate the impact of uncertainties into accident dynamics, several stochastic methodologies have been coupled with these codes. These stochastic methods range from classical Monte-Carlo and Latin Hypercube sampling to stochastic polynomial methods. Similar approaches have been introduced into the risk and safety community where stochastic methods (such as RAVEN, ADAPT, MCDET, ADS) have been coupled with safety analysis codes in order to evaluate the safety impact of timing and sequencing of events. These approaches are usually called Dynamic PRA or simulation-based PRA methods. These uncertainties and safety methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). The scope of this paper is to present a broad overview of methods and algorithms that can be used to analyze and extract information from large data sets containing time dependent data. In this context, “extracting information” means constructing input-output correlations, finding commonalities, and identifying outliers. Some of the algorithms presented here have been developed or are under development within the RAVEN statistical framework.

97 MATHEMATICS AND COMPUTING↗

Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment

In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards such as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Root Cause Analysis of the Data Refinement Process – Medical Conditions Capability Resource Tables

The medical system for spaceflight thus far has been designed to support missions in low earth orbit (LEO). Crew capabilities are limited and heavily dependent on the team of medical support staff at Mission Control Center (MCC) to guide diagnosis and management. However, missions to the Moon and Mars will suffer from several constraints that will make this ground support focused approach to care ineffective. In order to update and modify medical system design, NASA has relied on Probabilistic Risk Assessment (PRA) modeling to mitigate medical risk through trade space analysis. Specifically, capability resource tables (CRT’s) were developed to create a dataset of resources required to manage a list of accepted medical conditions significant in exploration spaceflight. With 120 conditions, this dataset contained hundreds of capabilities and thousands of resources with tens of thousands of cells of data. Initially these tables were built in excel for high throughput during development, but ultimately had to be transferred, managed, and modified into the Evidence Library database for modeling purposes. The process of collating and reviewing the Evidence Library revealed numerous errors in the dataset that had to be corrected through iterative changes. Several error types emerged during this process and can be broken into specific classifications defined as “input”, “transcription”, “structural”, “branching”, and “information”. In reviewing these error types through the root cause analysis (RCA) approach, we were able to identify the contributors to these errors which included single data review points, changing product end goals, limited software selection, time constraints and several others. By reviewing and evaluating the underlying causes we can provide possible system improvements that can be implemented for current and future data management in PRA model inputs.

A. Anderson↗

Development of Advanced Numerical Tools for the Nonlinear Seismic Analysis of Nuclear Systems

In the framework of Probabilistic Risk Assessment (PRA) of nuclear facilities, a rigorous dynamic characterization of all structural and non-structural components is of paramount concern. The common features of nuclear facilities lies in the combination of three characteristics: 1. low aspect ratio; 2. large mass; and 3. significant embedment in soil. These characteristics make the interaction between the structural system and the surrounding soil a key aspect to consider for seismic risk evaluations. The methodologies and numerical tools currently in use for simulating the seismic response of a nuclear facility with significant Soil Structure Interaction (SSI) date back to the 1970's and rely on a number of simplifying idealizations, mainly related to the characterization of the incident seismic waveforms, the assumption of linear-elastic behavior of the superstructures, and idealization of equivalent linear behavior of the supporting soils. Given this background and taking advantage of the substantial progress in computational mechanics in the last decades, the ongoing research aims at developing advanced numerical tools for the nonlinear, time history simulation of nuclear facilities. This translates into the availability of a robust nonlinear time-domain simulation tool that can accurately model the nonlinearities of coupled soil-structure systems, and whose development includes robust verification and validation. The work described herein is supported by the U.S. Department of Energy (DOE) and focuses on delivering the next-generation, high performance simulation tool in support of DOE needs and mission. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Modeling the Risk of Fire/Explosion Due to Oxidizer/Fuel Leaks in the Ares I Interstage

A significant flight hazard associated with liquid propellants, such as those used in the upper stage of NASA's new Ares I launch vehicle, is the possibility of leakage of hazardous fluids resulting in a catastrophic fire/explosion. The enclosed and vented interstage of the Ares I contains numerous oxidizer and fuel supply lines as well as ignition sources. The potential for fire/explosion due to leaks during ascent depends on the relative concentrations of hazardous and inert fluids within the interstage along with other variables such as pressure, temperature, leak rates, and fluid outgasing rates. This analysis improves on previous NASA Probabilistic Risk Assessment (PRA) estimates of the probability of deflagration, in which many of the variables pertinent to the problem were not explicitly modeled as a function of time. This paper presents the modeling methodology developed to analyze these risks.

Ring, Robert W.↗

U.S. Nuclear Operating Experience Program for Probabilistic Risk Assessment Parameter Estimations

This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.

99 GENERAL AND MISCELLANEOUS↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

U.S. NRC CONFIRMATORY LEVEL 1 PRA SUCCESS CRITERIA ACTIVITIES

The U.S. Nuclear Regulatory Commission’s standardized plant analysis risk (SPAR) models are used to support a number of risk-informed initiatives. The fidelity and realism of these models are ensured through a number of processes including cross-comparison with industry models, review and use by a wide range of technical experts, and confirmatory analysis. This paper will describe a key activity in the latter arena. Specifically, this paper will describe MELCOR analyses performed to augment the technical basis for confirming or modifying specific success criteria of interest. The analyses that will be summarized provide the basis for confirming or changing success criteria in a specific 3-loop pressurized-water reactor and a Mark-I boiling-water reactor. Initiators that have been analyzed include loss-of-coolant accidents, loss of main feedwater, spontaneous steam generator tube rupture, inadvertent opening of a relief valve at power, and station blackout. For each initiator, specific aspects of the accident evolution are investigated via a targeted set of calculations (3 to 22 distinct accident analyses per initiator). Further evaluation is ongoing to extend the analyses’ conclusions to similar plants (where appropriate), with consideration of design and modeling differences on a scenario-by-scenario basis. This paper will also describe future plans.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗