Search NASASearch

SEARCH · Search NASA

Results for “PROBABILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Non-Parametric Collision Probability for Low-Velocity Encounters

An implicit, but not necessarily obvious, assumption in all of the current techniques for assessing satellite collision probability is that the relative position uncertainty is perfectly correlated in time. If there is any mis-modeling of the dynamics in the propagation of the relative position error covariance matrix, time-wise de-correlation of the uncertainty will increase the probability of collision over a given time interval. The paper gives some examples that illustrate this point. This paper argues that, for the present, Monte Carlo analysis is the best available tool for handling low-velocity encounters, and suggests some techniques for addressing the issues just described. One proposal is for the use of a non-parametric technique that is widely used in actuarial and medical studies. The other suggestion is that accurate process noise models be used in the Monte Carlo trials to which the non-parametric estimate is applied. A further contribution of this paper is a description of how the time-wise decorrelation of uncertainty increases the probability of collision.

Carpenter, J. Russell

Extravehicular Mobility Unit Penetration Probability from Micrometeoroids and Orbital Debris: Revised Analytical Model and Potential Space Suit Improvements

The NASA Extravehicular Mobility Unit (EMU) micrometeoroid and orbital debris protection ability has recently been assessed against an updated, higher threat space environment model. The new environment was analyzed in conjunction with a revised EMU solid model using a NASA computer code. Results showed that the EMU exceeds the required mathematical Probability of having No Penetrations (PNP) of any suit pressure bladder over the remaining life of the program (2,700 projected hours of 2 person spacewalks). The success probability was calculated to be 0.94, versus a requirement of >0.91, for the current spacesuit s outer protective garment. In parallel to the probability assessment, potential improvements to the current spacesuit s outer protective garment were built and impact tested. A NASA light gas gun was used to launch projectiles at test items, at speeds of approximately 7 km per second. Test results showed that substantial garment improvements could be made, with mild material enhancements and moderate assembly development. The spacesuit s PNP would improve marginally with the tested enhancements, if they were available for immediate incorporation. This paper discusses the results of the model assessment process and test program. These findings add confidence to the continued use of the existing NASA EMU during International Space Station (ISS) assembly and Shuttle Operations. They provide a viable avenue for improved hypervelocity impact protection for the EMU, or for future space suits.

Chase, Thomas D.

Implementation of a Collision Probability Prediction Technique for Constellation Maneuver Planning

On March 22, 2006, the Space Technology 5 (ST5) constellation spacecraft were successfully delivered to orbit by a Pegasus XI, launch vehicle. An unexpected relative motion experienced by the constellation after orbit insertion brought about a problem. Soon after launch the observed relative position of the inert rocket body was between the leading and the middle spacecraft within the constellation. The successful planning and execution of an orbit maneuver that would create a fly-by of the rocket body was required to establish the.formation. This maneuver would create a close approach that needed to conform to predefined collision probability requirements. On April 21, 2006, the ST5 "155" spacecraft performed a large orbit maneuver and successfully passed the inert Pegasus 3rd Stage Rocket Body on April 30, 2006 15:20 UTC at a distance of 2.55 km with a Probability of Collision of less than 1.0E-06. This paper will outline the technique that was implemented to establish the safe planning and execution of the fly-by maneuver. The method makes use of Gaussian distribution models of state covariance to determine underlying probabilities of collision that arise under low velocity encounters. Specific numerical examples used for this analysis are discussed in detail. The mechanics of this technique are explained to foster deeper understanding of the concepts presented and to improve existing processes for use in future constellation maneuver planning.

Concha, Marco a.

Directed Design of Experiments (DOE) for Determining Probability of Detection (POD) Capability of NDE Systems (DOEPOD)

This viewgraph presentation reviews some of the issues that people who specialize in Non destructive evaluation (NDE) have with determining the statistics of the probability of detection. There is discussion of the use of the binominal distribution, and the probability of hit. The presentation then reviews the concepts of Directed Design of Experiments for Validating Probability of Detection of Inspection Systems (DOEPOD). Several cases are reviewed, and discussed. The concept of false calls is also reviewed.

Generazio, Ed

Ares I-X First Flight Loss of Vehicle Probability Analysis

As part of the Constellation (Cx) Program development effort, several test flights were planned to prove concepts and operational capabilities of the new vehicles being developed. The first test, involving the Eastern Test Range, is the Ares I-X launched in 2009. As part of this test, the risk to the general public was addressed to ensure it is within Air Force requirements. This paper describes the methodology used to develop first flight estimates of overall loss of vehicle (LOV) failure probability, specifically for the Ares I-X. The method described in this report starts with the Air Force s generic failure probability estimate for first flight and adjusts the value based on the complexity of the vehicle as compared to the complexity of a generic vehicle. The results estimate a 1 in 9 probability of failure. The paper also describes traditional PRA methods used in this assessment, which were then combined with the updated first flight risk methodology to generate inputs required by the malfunction turn analysis to support estimate of casualty (Ec) calculations as part of the Final Flight Data Package (FFDP) delivered to the Eastern Range for Final Flight Plan Approval.

Bigler, Mark A.

Estimating the Probability of Electrical Short Circuits from Tin Whiskers

To comply with lead-free legislation, many manufacturers have converted from tin-lead to pure tin finishes of electronic components. However, pure tin finishes have a greater propensity to grow tin whiskers than tin-lead finishes. Since tin whiskers present an electrical short circuit hazard in electronic components, simulations have been developed to quantify the risk of said short circuits occurring. Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that had an unknown probability associated with it. Note however that due to contact resistance electrical shorts may not occur at lower voltage levels. In our first article we developed an empirical probability model for tin whisker shorting. In this paper, we develop a more comprehensive empirical model using a refined experiment with a larger sample size, in which we studied the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From the resulting data we estimated the probability distribution of an electrical short, as a function of voltage. In addition, the unexpected polycrystalline structure seen in the focused ion beam (FIB) cross section in the first experiment was confirmed in this experiment using transmission electron microscopy (TEM). The FIB was also used to cross section two card guides to facilitate the measurement of the grain size of each card guide's tin plating to determine its finish .

Courey, Karim J.

On the Probability of Occurrence of Extreme Space Weather Events

By virtue of their rarity, extreme space weather events, such as the Carrington event of 1859, are difficult to study, their rates of occurrence are difficult to estimate, and prediction of a specific future event is virtually impossible. Additionally, events may be extreme relative to one parameter but normal relative to others. In this study, we analyze several measures of the severity of space weather events (flare intensity, coronal mass ejection speeds, Dst, and greater than 30 MeV proton fluences as inferred from nitrate records) to estimate the probability of occurrence of extreme events. By showing that the frequency of occurrence scales as an inverse power of the severity of the event, and assuming that this relationship holds at higher magnitudes, we are able to estimate the probability that an event larger than some criteria will occur within a certain interval of time in the future. For example, the probability of another Carrington event (based on Dst less than - 850 nT) occurring within the next decade is approximately 12%. We also identify and address several limitations with this approach. In particular, we assume time stationarity, and thus, the effects of long-term space climate change are not considered. While this technique cannot be used to predict specific events, it may ultimately be useful for probabilistic forecasting.

Riley, Pete

Determining the Probability of Violating Upper-Level Wind Constraints for the Launch of Minuteman III Ballistic Missiles at Vandenberg Air Force Base

The 30th Operational Support Squadron Weather Flight (30 OSSWF) provides comprehensive weather services to the space program at Vandenberg Air Force Base (VAFB) in California. One of their responsibilities is to monitor upper-level winds to ensure safe launch operations of the Minuteman Ill ballistic missile. The 30 OSSWF tasked the Applied Meteorology Unit (AMU) to analyze VAFB sounding data with the goal of determining the probability of violating (PoV) their upper-level thresholds for wind speed and shear constraints specific to this launch vehicle, and to develop a tool that will calculate the PoV of each constraint on the day of launch. In order to calculate the probability of exceeding each constraint, the AMU collected and analyzed historical data from VAFB. The historical sounding data were retrieved from the National Oceanic and Atmospheric Administration Earth System Research Laboratory archive for the years 1994-2011 and then stratified into four sub-seasons: January-March, April-June, July-September, and October-December. The AMU determined the theoretical distributions that best fit the maximum wind speed and maximum wind shear datasets and applied this information when calculating the averages and standard deviations needed for the historical and real-time PoV calculations. In addition, the AMU included forecast sounding data from the Rapid Refresh model. This information provides further insight for the launch weather officers (LWOs) when determining if a wind constraint violation will occur over the next few hours on the day of launch. The AMU developed an interactive graphical user interface (GUI) in Microsoft Excel using Visual Basic for Applications. The GUI displays the critical sounding data easily and quickly for LWOs on day of launch. This tool will replace the existing one used by the 30 OSSWF, assist the LWOs in determining the probability of exceeding specific wind threshold values, and help to improve the overall upper winds forecast for the launch customer. This presentation will describe how the AMU calculated the historical and real-time PoV values for the specific upper-level wind launch constraints and outline the development of the interactive GUI display.

Shafer, Jaclyn A.

Wald Sequential Probability Ratio Test for Analysis of Orbital Conjunction Data

We propose a Wald Sequential Probability Ratio Test for analysis of commonly available predictions associated with spacecraft conjunctions. Such predictions generally consist of a relative state and relative state error covariance at the time of closest approach, under the assumption that prediction errors are Gaussian. We show that under these circumstances, the likelihood ratio of the Wald test reduces to an especially simple form, involving the current best estimate of collision probability, and a similar estimate of collision probability that is based on prior assumptions about the likelihood of collision.

Carpenter, J. Russell

Flow Regime Based Climatologies of Lightning Probabilities for Spaceports and Airports

The objective of this work was to provide forecasters with a tool to indicate the warm season climatological probability of one or more lightning strikes within a circle at a site within a specified time interval. This paper described the AMU work conducted in developing flow regime based climatologies of lightning probabilities for the SLF and seven airports in the NWS MLB CWA in east-central Florida. The paper also described the GUI developed by the AMU that is used to display the data for the operational forecasters. There were challenges working with gridded lightning data as well as the code that accompanied the gridded data. The AMU modified the provided code to be able to produce the climatologies of lightning probabilities based on eight flow regimes for 5-, 10-, 20-, and 30-n mi circles centered on eight sites in 1-, 3-, and 6-hour increments.

Bauman, William H., III

Estimating the Probability of Electrical Short Circuits from Tin Whiskers

To comply with lead-free legislation, many manufacturers have converted from tin-lead to pure tin finishes of electronic components. However, pure tin finishes have a greater propensity to grow tin whiskers than tin-lead finishes. Since tin whiskers present an electrical short circuit hazard in electronic components, simulations have been developed to quantify the risk of said short circuits occurring. Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that had an unknown probability associated with it. Note however that due to contact resistance electrical shorts may not occur at lower voltage levels. In our first article we developed an empirical probability model for tin whisker shorting. In this paper, we develop a more comprehensive empirical model using a refined experiment with a larger sample size, in which we studied the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From the resulting data we estimated the probability distribution of an electrical short, as a function of voltage.

Courey, Karim J.

Developing an Empirical Model for Estimating the Probability of Electrical Short Circuits from Tin Whiskers

To comply with lead-free legislation, many manufacturers have converted from tin-lead to pure tin finishes of electronic components. However, pure tin finishes have a greater propensity to grow tin whiskers than tin-lead finishes. Since tin whiskers present an electrical short circuit hazard in electronic components, simulations have been developed to quantify the risk of said short circuits occurring. Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that had an unknown probability associated with it. Note however that due to contact resistance electrical shorts may not occur at lower voltage levels. In our first article we developed an empirical probability model for tin whisker shorting. In this paper, we develop a more comprehensive empirical model using a refined experiment with a larger sample size, in which we studied the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From the resulting data we estimated the probability distribution of an electrical short, as a function of voltage. In addition, the unexpected polycrystalline structure seen in the focused ion beam (FIB) cross section in the first experiment was confirmed in this experiment using transmission electron microscopy (TEM). The FIB was also used to cross section two card guides to facilitate the measurement of the grain size of each card guide's tin plating to determine its finish.

Courey, Karim J.

Unit-Sphere Anisotropic Multiaxial Stochastic-Strength Model Probability Density Distribution for the Orientation of Critical Flaws

Models that predict the failure probability of monolithic glass and ceramic components under multiaxial loading have been developed by authors such as Batdorf, Evans, and Matsuo. These "unit-sphere" failure models assume that the strength-controlling flaws are randomly oriented, noninteracting planar microcracks of specified geometry but of variable size. This report develops a formulation to describe the probability density distribution of the orientation of critical strength-controlling flaws that results from an applied load. This distribution is a function of the multiaxial stress state, the shear sensitivity of the flaws, the Weibull modulus, and the strength anisotropy. Examples are provided showing the predicted response on the unit sphere for various stress states for isotropic and transversely isotropic (anisotropic) materials--including the most probable orientation of critical flaws for offset uniaxial loads with strength anisotropy. The author anticipates that this information could be used to determine anisotropic stiffness degradation or anisotropic damage evolution for individual brittle (or quasi-brittle) composite material constituents within finite element or micromechanics-based software

Nemeth, Noel

Probability of Loss of Crew Achievability Studies for NASA's Exploration Systems Development

Over the last few years, NASA has been evaluating various vehicle designs for multiple proposed design reference missions (DRM) beyond low Earth orbit in support of its Exploration Systems Development (ESD) programs. This paper addresses several of the proposed missions and the analysis techniques used to assess the key risk metric, probability of loss of crew (LOC). Probability of LOC is a metric used to assess the safety risk as well as a design requirement. These risk assessments typically cover the concept phase of a DRM, i.e. when little more than a general idea of the mission is known and are used to help establish "best estimates" for proposed program and agency level risk requirements. These assessments or studies were categorized as LOC achievability studies to help inform NASA management as to what "ball park" estimates of probability of LOC could be achieved for each DRM and were eventually used to establish the corresponding LOC requirements. Given that details of the vehicles and mission are not well known at this time, the ground rules, assumptions, and consistency across the programs become the important basis of the assessments as well as for the decision makers to understand.

Boyer, Roger L.

Probability of Loss of Crew Achievability Studies for NASA's Exploration Systems Development

Over the last few years, NASA has been evaluating various vehicle designs for multiple proposed design reference missions (DRM) beyond low Earth orbit in support of its Exploration Systems Development (ESD) programs. This paper addresses several of the proposed missions and the analysis techniques used to assess the key risk metric, probability of loss of crew (LOC). Probability of LOC is a metric used to assess the safety risk as well as a design requirement. These risk assessments typically cover the concept phase of a DRM, i.e. when little more than a general idea of the mission is known and are used to help establish "best estimates" for proposed program and agency level risk requirements. These assessments or studies were categorized as LOC achievability studies to help inform NASA management as to what "ball park" estimates of probability of LOC could be achieved for each DRM and were eventually used to establish the corresponding LOC requirements. Given that details of the vehicles and mission are not well known at this time, the ground rules, assumptions, and consistency across the programs become the important basis of the assessments as well as for the decision makers to understand.

Boyer, Roger L.

An Upper Bound on Orbital Debris Collision Probability When Only One Object has Position Uncertainty Information

Upper bounds on high speed satellite collision probability, P (sub c), have been investigated. Previous methods assume an individual position error covariance matrix is available for each object. The two matrices being combined into a single, relative position error covariance matrix. Components of the combined error covariance are then varied to obtain a maximum P (sub c). If error covariance information for only one of the two objects was available, either some default shape has been used or nothing could be done. An alternative is presented that uses the known covariance information along with a critical value of the missing covariance to obtain an approximate but useful P (sub c) upper bound. There are various avenues along which an upper bound on the high speed satellite collision probability has been pursued. Typically, for the collision plane representation of the high speed collision probability problem, the predicted miss position in the collision plane is assumed fixed. Then the shape (aspect ratio of ellipse), the size (scaling of standard deviations) or the orientation (rotation of ellipse principal axes) of the combined position error ellipse is varied to obtain a maximum P (sub c). Regardless as to the exact details of the approach, previously presented methods all assume that an individual position error covariance matrix is available for each object and the two are combined into a single, relative position error covariance matrix. This combined position error covariance matrix is then modified according to the chosen scheme to arrive at a maximum P (sub c). But what if error covariance information for one of the two objects is not available? When error covariance information for one of the objects is not available the analyst has commonly defaulted to the situation in which only the relative miss position and velocity are known without any corresponding state error covariance information. The various usual methods of finding a maximum P (sub c) do no good because the analyst defaults to no knowledge of the combined, relative position error covariance matrix. It is reasonable to think, given an assumption of no covariance information, an analyst might still attempt to determine the error covariance matrix that results in an upper bound on the P (sub c). Without some guidance on limits to the shape, size and orientation of the unknown covariance matrix, the limiting case is a degenerate ellipse lying along the relative miss vector in the collision plane. Unless the miss position is exceptionally large or the at-risk object is exceptionally small, this method results in a maximum P (sub c) too large to be of practical use. For example, assuming that the miss distance is equal to the current ISS alert volume along-track (+ or -) distance of 25 kilometers and that the at-risk area has a 70 meter radius. The maximum (degenerate ellipse) P (sub c) is about 0.00136. At 40 kilometers, the maximum P (sub c) would be 0.00085 which is still almost an order of magnitude larger than the ISS maneuver threshold of 0.0001. In fact, a miss distance of almost 340 kilometers is necessary to reduce the maximum P (sub c) associated with this degenerate ellipse to the ISS maneuver threshold value. Such a result is frequently of no practical value to the analyst. Some improvement may be made with respect to this problem by realizing that while the position error covariance matrix of one of the objects (usually the debris object) may not be known the position error covariance matrix of the other object (usually the asset) is almost always available. Making use of the position error covariance information for the one object provides an improvement in finding a maximum P (sub c) which, in some cases, may offer real utility. The equations to be used are presented and their use discussed.

Frisbee, Joseph H., Jr.

Probability of Loss of Crew Achievability Studies for NASA's Exploration Systems Development

Over the last few years, NASA has been evaluating various vehicle designs for multiple proposed design reference missions (DRM) beyond low Earth orbit in support of its Exploration Systems Development (ESD) programs. This paper addresses several of the proposed missions and the analysis techniques used to assess the key risk metric, probability of loss of crew (LOC). Probability of LOC is a metric used to assess the safety risk as well as a design requirement. These risk assessments typically cover the concept phase of a DRM, i.e. when little more than a general idea of the mission is known and are used to help establish "best estimates" for proposed program and agency level risk requirements. These assessments or studies were categorized as LOC achievability studies to help inform NASA management as to what "ball park" estimates of probability of LOC could be achieved for each DRM and were eventually used to establish the corresponding LOC requirements. Given that details of the vehicles and mission are not well known at this time, the ground rules, assumptions, and consistency across the programs become the important basis of the assessments as well as for the decision makers to understand.

Boyer, Roger L.

Probability of Loss of Crew Achievability Studies for NASA's Exploration Systems Development

Over the last few years, NASA has been evaluating various vehicle designs for multiple proposed design reference missions (DRM) beyond low Earth orbit in support of its Exploration Systems Development (ESD) programs. This paper addresses several of the proposed missions and the analysis techniques used to assess the key risk metric, probability of loss of crew (LOC). Probability of LOC is a metric used to assess the safety risk as well as a design requirement. These assessments or studies were categorized as LOC achievability studies to help inform NASA management as to what "ball park" estimates of probability of LOC could be achieved for each DRM and were eventually used to establish the corresponding LOC requirements. Given that details of the vehicles and mission are not well known at this time, the ground rules, assumptions, and consistency across the programs become the important basis of the assessments as well as for the decision makers to understand.

Boyer, Roger L.