Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

DEVELOPMENT OF A 25 MWTH FLAMELESS PRESSURIZED OXY-COMBUSTION PILOT

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

20 FOSSIL-FUELED POWER PLANTS↗

Well Clear: General Aviation and Commercial Pilots' Perceptioin of Unmanned Aerial Vehicles in the National Airspace System

This research explored how different pilots perceived the concept of the Well Clear Boundary (WCB) and observed if that boundary changed when dealing with manned versus unmanned aircraft systems (UAS), and the effects of other variables. Pilots' WCB perceptions were collected objectively through simulator recordings and subjectively through questionnaires. Objectively, significant differences were found in WCB perception between two pilot types (general aviation [GA], and Airline Transport Pilots [ATPs]), and significant WCB differences were evident when comparing two intruder types (manned versus unmanned aircraft). Differences were dependent on other manipulated variables (intruder approach angle, ownship speed, and background traffic levels). Subjectively, there were differences in WCB perception across pilot types; GA pilots trusted UAS aircraft higher than the more experienced ATPs. Conclusions indicate pilots' WCB mental models are more easily perceived as time-based boundaries in front of ownship, and more easily perceived as distance-based boundaries to the rear of ownship.

unmanned aerial systems↗

Pilot Workload is Associated with Long Duty Days and Multiple Flight Legs

Pilot workload is a real concern throughout aviation, especially in short-haul operations due to short flights and multiple flight legs. Our goal was to examine the workload experienced by pilots during normal operations in a short-haul airline. Thirty pilots flew a roster consisting of a cycle of five days of mid-day start time duty hours with many flight legs (baseline block) followed by four days off, five early start time duty hours followed by three days off, five mid-day time starts with many legs followed by three days off and then five early start time followed by one day off. The pilots provided evaluations of workload by scoring the six subscales of NASA-TLX (i.e., Mental Demand, Performance, Physical Demand, Effort, Temporal Demand, and Frustration) on their duty days during each flight and once during rest days. The analyses included the raw TLX scores for each demand, the mean raw TLX, and the overall weighted TLX mean for duty days and rest days. We found that mental demand was significantly lower for each duty schedule and rest relative to baseline (early start 1st block p = 0.016, late duty p = 0.017, early start 2nd block p < 0.001, rest p < 0.001). Temporal demand was significantly lower than baseline on early duty 1st block (p = 0.02), early start 2nd block (p < 0.001), and rest (p < 0.001). Effort was significantly lower than baseline only during early start 1st block (p = 0.014) and early start 2nd block (p < 0.001). Frustration was significantly lower during early start 2nd block relative to baseline (p = 0. 039). Physical demand and performance were higher relative to baseline during rest days (p < 0.001). Mean raw TLX showed significantly lower workload for early start 1st block (p = 0.011) and early start 2nd block (p < 0.001). The overall weighted TLX showed significantly lower workload for early start 1st block (p = 0.004), early start 2nd block (p < 0.001) and rest (p < 0.001). We found that pilots experienced higher workload on longer duty days with multiple flight legs. Pilots experienced lower mental demand, temporal demand, and effort on short duty days even though when their duty started earlier in the day. During days off pilots experienced higher physical demand and higher performance.

short-haul↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

First Ever Polymer Flood Field Pilot To Enhance The Recovery Of Heavy Oils On Alaska’s North Slope - Pushing Ahead One Year Later

In June 2018 the team embarked on an ambitious project to address the slow development pace of Alaska’s 20+ billion barrels heavy oil resource via the first ever polymer flood pilot. Following the successful commencement of the pilot in August 2018, the field demonstration, supporting laboratory experiments and numerical simulation have steadily progressed. A significant amount of valuable data and lessons learned have been collected, and are reported in this paper. The ongoing pilot and the research activities is making headway toward the primary objective of validating the use of polymer flooding for extracting heavy oil in Alaska’s challenging environment. The pilot is conducted in two pre-existing pairs of horizontal injectors and producers in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field. A customized polymer blending and pumping unit injects HPAM polymer at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP. Supporting coreflood laboratory experiments have focused on quantification of polymer retention in the rock, and effect of injection water salinity, polymer, and their combinations on oil recovery. The injection and production response of the pilot flood pattern is utilized to develop a history matched reservoir simulation model for forecasting oil recovery beyond the pilot. Finally, specially designed laboratory experiments address anticipated operating concerns regarding post-polymer breakthrough such as oil-water separation efficiency and polymer induced fouling of heater tubes. Polymer has been injected continuously since startup except for two short equipment modification shutdowns, and more recently a prolonged disruption due to polymer hydration issues at the J-pad field site. Cumulatively, over 600,000 lbs. of polymer has been injected, corresponding to ~7%PV. The two producers show significant decrease in the water cut, gradually increasing oil rate, and no polymer breakthrough. Two main observations from the coreflood are a significant uncertainty in polymer retention values, and positive oil recovery response to low salinity water (2,600 mg/liter TDS). The heterogeneity in the flood pattern presents some challenges in obtaining a robust history matched simulation model. Experimental results on produced fluids treatment indicate the formation of a dense polymer deposit, at certain conditions, on heating tubes that can negatively impact the heat transfer efficiency. The scientific knowledge, including the lessons learned during unanticipated shutdowns, quality control, logistics and field data that is being acquired from this effort has referential value for other planned EOR projects. Finally, by all indications, the polymer field pilot is steadily progressing toward achieving the ultimate goal of unlocking the massive heavy oil resources on Alaska North Slope (ANS).

Dandekar, Abhijit↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Single pilot IFR operating problems determined from accidental data analysis

The accident reports examined were restricted to instrument rated pilots flying in IFR weather. A brief examination was made of accidents which occurred during all phases of flight and which were due to all causes. A detailed examination was made of those accidents which involved a single pilot which occurred during the landing phases of flight, and were due to pilot error. Problem areas found include: (1) landing phase operations especially final approach, (2) pilot weather briefings, (3) night approaches in low IFR weather, (4) below minimum approaches, (5) aircraft icing, (6) imprecise navigation, (7) descending below minimum IFR altitudes, (8) fuel mismanagement, (9) pilot overconfidence, and (10) high pilot workload especially in twins. Some suggested areas of research included: (1) low cost deicing systems, (2) standardized navigation displays, (3) low cost low-altitude warning systems, (4) improved fuel management systems, (5) improved ATC communications, (6) more effective pilot training and experience acquisition methods, and (7) better weather data dissemination techniques.

Forsyth, D. L.↗

Identification of multiloop pilot describing functions obtained from simulated approaches to an aircraft carrier

Predicted results of a simulation of the pilot's approach control strategy in the presence of pilot remnant are presented. The aircraft dynamics and the turbulence environment are representative of a trainer-type aircraft. The non-intrusive pilot identification program (NIPIP) was used to identify the pilot's control strategy required by this highly-coupled, multiloop control task. The results are presented in terms of frequency responses of the individual elements of the pilot's control strategy and indicate that NIPIP can identify the pilot's describing functions even in the presence of significant amounts of pilot remnant.

Jewell, W. F.↗

Time Domain Identification of an Optimal Control Pilot Model with Emphasis on the Objective Function

A method for the identification of the pilot's control compensation using time domain techniques is proposed. From this information we hope to infer a quadratic cost function, supported by the data, that represents a reasonable expression for the pilot's control objective in the task being performed, or an inferred piloting strategy. The objectives for this method are: (1) obtain a better understanding of the fundamental piloting techniques in complex tasks, such as landing approach; (2) the development of a metric measurable in simulations and flight test that correlate with subjective pilot opinion; and (3) to further validate pilot models and pilot vehicle analysis methods.

Schmidt, D. K.↗

Pilot model hypothesis testing

The aircraft control time history predicted by the optimal control pilot model and actual pilot tracking data obtained from NASA Langley's differential maneuvering simulator (DMS) are analyzed. The analysis is performed using a hypothesis testing scheme modified to allow for changes in the true hypothesis. A finite number of pilot models, each with different hypothesized internal model representations of the aircraft dynamics, are constructed. The hypothesis testing scheme determines the relative probability that each pilot model best matches the DMS data. By observing the changes in probabilities, it is possible to determine when the pilot changes control strategy and which hypothesized pilot model best represent's the pilot's control behavior.

Broussard, J. R.↗

The effects of pilot stress factors on handling quality assessments during US/German helicopter agility flight tests

Flight tests were conducted with two helicopters to study and evaluate the effects of helicopter characteristics and pilot and task demands on performance in nap-of-the-Earth flight. Different, low-level slalom courses were set up and were flown by three pilots with different levels of flight experience. A pilot rating questionnaire was used to obtain redundant information and to gain more insight into factors that influence pilot ratings. The flight test setups and procedures are described, and the pilot ratings are summarized and interpreted in close connection with the analyzed test data. Pilot stress is discussed. The influence of demands on the pilot, of the helicopter characteristics, and of other stress factors are outlined with particular emphasis on how these factors affect handling-qualities assessment.

Pausder, H. J.↗

The effects of pilot stress factors on handling quality assessments during US/German helicopter agility flight tests

Flight tests were conducted with two helicopters to study and evaluate the effects of helicopter characteristics and pilot and task demands on performance in nap-of-the-earth flight. Different, low-level slalom courses were set up and were flown by three pilots with different levels of flight experience. A pilot rating questionnaire was used to obtain redundant information and to gain more insight into factors that influence pilot ratings. The flight test setups and procedures are described, and the pilot ratings are summarized and interpreted in close connection with the analyzed test data. Pilot stress is discussed. The influence of demands on the pilot, of the helicopter characteristics, and of other stress factors are outlined with particular emphasis on how these factors affect handling-qualities assessment. Previously announced in STAR as N83-13114

Pausder, H.-J.↗

Data-link alternatives for the NASA pilot data systems

There are several preliminary, or pilot, efforts for developing data systems for supporting NASA science research. The Pilot Data Systems consist of the Pilot Land Data System (PLDS), the Pilot Ocean Data System (PODS), the Pilot Climate Data System (PCDS), and the Pilot Planetary Data System (PPDS). The PLDS is likely to have the greatest communication needs of the various pilots. Communications issues and requirements are examined in the context of the mature PLDS as it may exist by 1990. The PLDS is seen as a distributed processing system linking resources at a number of NASA research centers and outside universities. Large image data sets, including LANDSAT scenes, are a major data type to be moved along the PLDS communications network. The unusually large size of these data files requires examining new technologies that may allow efficient and affordable communication at rates of up to 60 megabits per second. Potentially useful developments include portable satellite ground stations, and time division multiple access for sharing high-speed satellite links. Further pooling of communications for the various data systems into a single network would reduce costs and may make economic justification of access to the required data rates possible.

Likens, W. C.↗

Pilot interface with fly by wire control systems

Aircraft designers are rapidly moving toward full fly by wire control systems for transport aircraft. Aside from pilot interface considerations such as location of the control input device and its basic design such as side stick, there appears to be a desire to change the fundamental way in which a pilot applies manual control. A typical design would have the lowest order of manual control be a control wheel steering mode in which the pilot is controlling an autopilot. This deprives the pilot of the tactile sense of angle of attack which is inherent in present aircraft by virtue of certification requirements for static longitudinal stability whereby a pilot must either force the aircraft away from its trim angle of attack or trim to a new angle of attack. Whether or not an aircraft actually has positive stability, it can be made to feel to a pilot as though it does by artificial feel. Artificial feel systems which interpret pilot input as pitch rate or G rate with automatic trim have proven useful in certain military combat maneuvers, but their transposition to other more normal types of manual control may not be justified.

Melvin, W. W.↗

Computer simulation of a single pilot flying a modern high-performance helicopter

Presented is a computer simulation of a human response pilot model able to execute operational flight maneuvers and vehicle stabilization of a modern high-performance helicopter. Low-order, single-variable, human response mechanisms, integrated to form a multivariable pilot structure, provide a comprehensive operational control over the vehicle. Evaluations of the integrated pilot were performed by direct insertion into a nonlinear, total-force simulation environment provided by NASA Lewis. Comparisons between the integrated pilot structure and single-variable pilot mechanisms are presented. Static and dynamically alterable configurations of the pilot structure are introduced to simulate pilot activities during vehicle maneuvers. These configurations, in conjunction with higher level, decision-making processes, are considered for use where guidance and navigational procedures, operational mode transfers, and resource sharing are required.

Zipf, Mark E.↗

Comparison of flying qualities derived from in-flight and ground-based simulators for a jet-transport airplane for the approach and landing pilot tasks

The primary objective was to provide information to the flight controls/flying qualities engineer that will assist him in determining the incremental flying qualities and/or pilot-performance differences that may be expected between results obtained via ground-based simulation (and, in particular, the six-degree-of-freedom Langley Visual/Motion Simulator (VMS)) and flight tests. Pilot opinion and performance parameters derived from a ground-based simulator and an in-flight simulator are compared for a jet-transport airplane having 32 different longitudinal dynamic response characteristics. The primary pilot tasks were the approach and landing tasks with emphasis on the landing-flare task. The results indicate that, in general, flying qualities results obtained from the ground-based simulator may be considered conservative-especially when the pilot task requires tight pilot control as during the landing flare. The one exception to this, according to the present study, was that the pilots were more tolerant of large time delays in the airplane response on the ground-based simulator. The results also indicated that the ground-based simulator (particularly the Langley VMS) is not adequate for assessing pilot/vehicle performance capabilities (i.e., the sink rate performance for the landing-flare task when the pilot has little depth/height perception from the outside scene presentation).

Grantham, William D.↗

Cognitive engineering in aerospace application: Pilot interaction with cockpit automation

Because of recent incidents involving glass-cockpit aircraft, there is growing concern with cockpit automation and its potential effects on pilot performance. However, little is known about the nature and causes of problems that arise in pilot-automation interaction. The results of two studies that provide converging, complementary data on pilots' difficulties with understanding and operating one of the core systems of cockpit automation, the Flight Management System (FMS) is reported. A survey asking pilots to describe specific incidents with the FMS and observations of pilots undergoing transition training to a glass cockpit aircraft served as vehicles to gather a corpus on the nature and variety of FMS-related problems. The results of both studies indicate that pilots become proficient in standard FMS operations through ground training and subsequent line experience. But even with considerable line experience, they still have difficulties tracking FMS status and behavior in certain flight contexts, and they show gaps in their understanding of the functional structure of the system. The results suggest that design-related factors such as opaque interfaces contribute to these difficulties which can affect pilots' situation awareness. The results of this research are relevant for both the design of cockpit automation and the development of training curricula specifically tailored to the needs of glass cockpits.

Sarter, Nadine R.↗

The Efficacy of Using Synthetic Vision Terrain-Textured Images to Improve Pilot Situation Awareness

The General Aviation Element of the Aviation Safety Program's Synthetic Vision Systems (SVS) Project is developing technology to eliminate low visibility induced General Aviation (GA) accidents. SVS displays present computer generated 3-dimensional imagery of the surrounding terrain on the Primary Flight Display (PFD) to greatly enhance pilot's situation awareness (SA), reducing or eliminating Controlled Flight into Terrain, as well as Low-Visibility Loss of Control accidents. SVS-conducted research is facilitating development of display concepts that provide the pilot with an unobstructed view of the outside terrain, regardless of weather conditions and time of day. A critical component of SVS displays is the appropriate presentation of terrain to the pilot. An experimental study is being conducted at NASA Langley Research Center (LaRC) to explore and quantify the relationship between the realism of the terrain presentation and resulting enhancements of pilot SA and performance. Composed of complementary simulation and flight test efforts, Terrain Portrayal for Head-Down Displays (TP-HDD) experiments will help researchers evaluate critical terrain portrayal concepts. The experimental effort is to provide data to enable design trades that optimize SVS applications, as well as develop requirements and recommendations to facilitate the certification process. In this part of the experiment a fixed based flight simulator was equipped with various types of Head Down flight displays, ranging from conventional round dials (typical of most GA aircraft) to glass cockpit style PFD's. The variations of the PFD included an assortment of texturing and Digital Elevation Model (DEM) resolution combinations. A test matrix of 10 terrain display configurations (in addition to the baseline displays) were evaluated by 27 pilots of various backgrounds and experience levels. Qualitative (questionnaires) and quantitative (pilot performance and physiological) data were collected during the experimental runs. This paper focuses on the experimental set-up and final physiological results of the TP-HDD simulation experiment. The physiological measures of skin temperature, heart rate, and muscle response, show a decreased engagement (while using the synthetic vision displays as compared to the baseline conventional display) of the sympathetic and somatic nervous system responses which, in turn, indicates a reduced level of mental workload. This decreased level of workload is expected to enable improvement in the pilot's situation and terrain awareness.

Uenking, Michael D.↗