A parasitic load speed control for dynamic space power systems
Parasitic load speed control for dynamic space power systems
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Parasitic load speed control for dynamic space power systems
Not Available
On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.
As deployment of power electronic coupled generation such as photovoltaic (PV) systems increases, grid operators have shown increasing interest in calling on inverter-coupled generation to help mitigate frequency contingency events by rapidly surging active power into the grid. When responding to contingency events, the faster the active power is provided, the more effective it may be for arresting the frequency event. This paper proposes a predictive PV inverter control method for very fast and accurate control of active power. This rapid active power control method will increase the effectiveness of various higher-level controls designed to mitigate grid frequency contingency events, including fast power-frequency droop, inertia emulation, and fast frequency response, without the need for energy storage. The rapid active power control method, coupled with a maximum power point estimation method, is implemented in a prototype PV inverter connected to a PV array. The prototype inverter's response to various frequency events is experimentally confirmed to be fast (beginning within 2 line cycles and completing within 4.5 line cycles of a severe test event) and accurate (below 2% steady-state error).
Design of parasitic speed controllers to regulate rotational speed and frequency of alternators in dynamic space power systems
Power system restoration is an important part of system planning. Power utilities are required to maintain black start capable generators that can energize the transmission system and provide cranking power to non-blackstart capable generators. Traditionally, hydro and diesel units are used as black start capable generators. With the increased penetration of bulk size solar farms, inverter based generation can play an important role in faster and parallel black start thus ensuring system can be brought back into service without the conventional delays that can be expected with limited black start generators. Inverter-based photovoltaic (PV) power plants have advantages that are suitable for black start. This paper proposes the modeling, control, and simulation of a grid-forming inverter-based PV-battery power plant that can be used as a black start unit. The inverter control includes both primary and secondary control loops to imitate the control of a conventional synchronous machine. The proposed approach is verified using a test system modified from the IEEE 9-bus system in the time-domain electromagnetic transient simulation tool PSCAD. The simulation results shows voltage and frequency stability during a multi-step black-start and network energization process.
The control of future power grids is migrating from a centralized to a distributed/decentralized scheme to enable a massive penetration of distributed energy resources with rising dependence on communication infrastructure. A common assumption made for most existing distributed/decentralized controllers is that local controllers would faithfully follow the designated controller dynamics based on the data received from communication channels. However, with increased probability of cyberattacks on Operational Technology infrastructure, such an assumption could be risky because proper execution of the controller dynamics is then built on trust in secure communication and computation. In this work, we leverage a cryptography technology known as zero-knowledge scalable transparent arguments of knowledge (zk-STARK) to verify the computational integrity of power grid control algorithms, with projected linear dynamics-based control schemes as the initial proof-of-concept test case. The method presented here converts the cybersecurity challenge of data integrity for grid control into a subset of computational integrity.
Not provided.
With the fast growth of renewable energy sources (RES), more and more uncertainties are involved and influencing the stable operation of power systems. Controlled islanding is the last measure to prevent power system blackouts, thus this paper aims to propose a novel model of system separation based on Online Coherency Identification and Adjustable Robust Optimization Programming (OCI-AROP) for minimizing load shedding considering the uncertainties of RES. First, Fuzzy C-Means (FCM) clustering method with F-statistics is utilized to identify the coherent generator groups with the frequency data measured by Phasor Measurement Units (PMUs). Then, the OCI-AROP model considering coherent group constraints, connectivity constraints and robustness constraints about RES are presented. Finally, the case studies on IEEE-39 bus system and WECC-179 bus system are employed to demonstrate the effectiveness of the proposed OCI-AROP model, and comparisons among the OCI-AROP model and the other models are also given to show its superiority.
A power control circuit connected between a solar array and an ion thruster receives voltage and current signals from the solar array. The control circuit multiplies the voltage and current signals together to produce a power signal which is differentiated with respect to time. The differentiator output is detected by a zero crossing detector and, after suitable shaping, the detector output is phase compared with a clock in a phase demodulator. An integrator receives no output from the phase demodulator when the operating point is at the maximum power but is driven toward the maximum power point for non-optimum operation. A ramp generator provides minor variations in the beam current reference signal produced by the integrator in order to obtain the first derivative of power.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
For electric utilities, the ability to prevent or minimize lightning damage on personnel and power systems is of great importance. Therefore, the Swedish State Power Board, has been using data since 1983 from a nationwide lightning location system (LLS) for accurately locating lightning ground strikes. Lightning data is distributed and presented on color graphic displays at regional power network control centers as well as at the national power system control center for optimal data use. The main objectives for use of LLS data are: supervising the power system for optimal and safe use of the transmission and generating capacity during periods of thunderstorms; warning service to maintenance and service crews at power line and substations to end operations hazardous when lightning; rapid positioning of emergency crews to locate network damage at areas of detected lightning; and post analysis of power outages and transmission faults in relation to lightning, using archived lightning data for determination of appropriate design and insulation levels of equipment. Staff have found LLS data useful and economically justified since the availability of power system has increased as well as level of personnel safety.
The CRADA between NETL and Derp Tech aims to evaluate potential for early adoption of novel utilityscale advanced power control systems in distributed generation systems. The goal is to enable the grid to add significant hybrid sources, including hybrid power and thermal/electric storage systems, for flexible and adaptive islanding microgrid capabilities. Controls research conducted using the Hybrid Performance Project facility (Hyper) has illustrated the potential for fuel cell turbine hybrid power systems to deal with load transients and offdesign operation. DERP Tech is involved in the design and deployment of commercial solutions for adding microgrids and DG (hybrid combinations for Utility marketplace) to the grid. The information gained from DERP’s sample cases will enable NETL to quantify its control strategies for real world scenarios and applications.