At least 145 records · Page 8

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

Analysis of Loss-of-Offsite-Power Events: Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2020, while the most recent 15-year data (i.e., from 2006–2020) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather related. Highly significant decreasing trends in the LOOP occurrence rates were identified for All-LOOPs during critical operation (p-value = 0.001) and switchyard-centered LOOPs during critical operation (p-value = 0.002) for the most recent 10-year period (2011–2020). Adverse trends in LOOP durations continue for switchyard-centered LOOPs (p-value = 0.005), All-LOOPs (p-value = 0.019), as well as All-LOOPs during shutdown operation (p-value = 0.003). Statistical tests show the LOOP counts are not uniformly distributed across the 12 months, and variation among the months exists for plant-centered LOOPs (p-value = 0.028), grid-related LOOPs (p-value = 0.021), All-LOOPs (p-value = 0.003), and All-LOOPs during critical operation (p-value = 0.008). The engineering analysis of LOOP data showed for the period of 2006–2020, the equipment failure events were dominated by failures of circuits and relay; human errors have been less frequent and occurred primarily in maintenance; and weather events were dominated by tornadoes and lightning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: 2021 Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2021, while the most recent 15-year data (i.e., from 2007–2021) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather-related. These categories (and the All-LOOPs group which contains all LOOPs without regarding of the four categories) could be further grouped by whether a LOOP event occurred during critical operation, during shutdown operation, or during all operations. The following decreasing trends in the LOOP occurrence rates were identified for the most recent 10-year period (2012–2021): All-LOOPs during critical operation, switchyard-centered LOOPs during critical operation, and grid-related LOOPs during critical operation. Adverse trends in LOOP durations continue for switchyard-centered LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during shutdown operation for the 1997–2021 period. Statistical tests show the LOOP counts for the period of 2007–2021 are not uniformly distributed across the 12 months, and variation among the months exists for grid-related LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during critical operation. The engineering analysis of LOOP data showed for the period of 2007–2021, the equipment failure events were dominated by failures of relay and other; human errors have been less frequent and occurred primarily in maintenance and switching; and weather were dominated by tornadoes then by lightning and hurricane. Weather was the cause for 45% of LOOPs for the last fifteen years (2007– 2021) but only for 20% of LOOPs for the previous 20 years (1987–2006) .

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applied Risk Analysis for Guiding Homeland Security Policy

Risk analysis methods may be qualitative, semi-quantitative, or quantitative; adopt probabilistic and statistical theories; and implement concepts from core disciplines including operations research, reliability engineering, systems engineering, and applied mathematics. These methods continue to develop and evolve and have successfully been applied to address various homeland security mission challenges in recent years. The objective of this book is to: 1) highlight the role of risk analysis for informing homeland security policy decisions, and 2) describe case studies from academia, government, and industry that apply risk analysis methods for addressing challenges within each of the DHS missions.

national security, risk assessment, risk managemen↗

Information and problem report usage in system saftey engineering division

Five basic problems or question areas are examined. They are as follows: (1) Evaluate adequacy of current problem/performance data base; (2) Evaluate methods of performing trend analysis; (3) Methods and sources of data for probabilistic risk assessment; and (4) How is risk assessment documentation upgraded and/or updated. The fifth problem was to provide recommendations for each of the above four areas.

Morrissey, Stephen J.↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

Probabilistic structural analysis: Introductory remarks

The development of probabilistic structural analysis methodology consists of the following program elements: (1) composite load spectra models, (2) computational probabilistic structural analysis methods, and (3) probabilistic constitutive relationships. The development of the probabilistic structural analysis methodology is a joint program of NASA Lewis in-house and sponsored research. The objective of this session is to illustrate recent progress on the application of this methodology to determine the reliability of structural components for rocket propulsion systems. The session contains descriptions of and progress reports on the following specific activities: (1) The NESSUS computer code, (2) approximate methods, (3) advanced methods, (4) composite load spectra applications, (5) probabilistic fracture mechanisms, and (6) probability of failure and risk analysis. Collectively, the progress to date demonstrates that the structural durability of hot engine structural components can be effectively evaluated in a formal probabilistic/reliability framework.

Chamis, Christos C.↗

An Approach to Dynamic Human Reliability Analysis Using the EMRALD Dynamic Risk Assessment Tool

There is a need for research into dynamic human reliability analysis (HRA) (i.e., simulation- or computation-based HRA), as many researchers have emphasized the importance of applying dynamic approaches to probabilistic safety assessments (PSAs). This study proposes the Procedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA), a dynamic HRA approach based on the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). This study suggests how this software can be used to model human actions and evaluate error probabilities. The applicability of this approach is also be investigated in light of an extended loss of AC power (ELAP) scenario. This paper then discusses the major insights derived by comparing this dynamic HRA approach against the static one.

99 GENERAL AND MISCELLANEOUS↗

Analysis of historic fires to determine most frequent challenging events

The fire probabilistic risk assessment framework for nuclear power plants relies on experimental data to determine expected fire behavior or to validate models to predict fire conditions in the plant. To support reducing the uncertainty in this experimental data, a research effort was conducted to identify the most frequent and challenging fire scenarios using historic fire data from nuclear power plants in the United States. To support this effort, an electronic version of the publicly available Updated Fire Event Database developed by Electric Power Research Institute was produced resulting in data on 2111 fire events, 540 events were labelled as being challenging fires with 74.2% of these challenging fire events being due to eleven selected fire types. In conclusion, of these fire types, electrical and electronic equipment, transient combustibles, and liquid fires were the most frequent of the challenging fires. The fire scenario specifics were characterized for each of the eleven selected types and then related to existing fire experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Approach to Dynamic Human Reliability Analysis using EMRALD Dynamic Risk Assessment Tool

Research for dynamic human reliability analysis (HRA) (a.k.a., simulation-based or computation-based HRA) has been required, as many researchers have emphasized the importance of dynamic approaches to probabilistic safety assessment (PSA). This study proposes the PRocedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA) method, which is an approach to dynamic HRA using the Event Modeling Risk Assessment using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). In this study, how to model human actions using the software and evaluate the error probabilities is suggested. The applicability of this approach will be also investigated through an extended loss of AC power (ELAP) scenario. Then, major insights from this dynamic HRA approach against the static one will be discussed in the paper.

99 GENERAL AND MISCELLANEOUS↗

LOFTID Aeroshell Thermal Response Uncertainty Analysis Utilizing the End-to-End Monte Carlo Approach

A probabilistic thermal margin process has been performed to design the flexible thermal protection system (FTPS) and select entry trajectory constraints given an acceptable risk level for the Low-Earth Orbit Flight Test of and Inflatable Decelerator (LOFTID) project. Uncertainties exist in atmospheric entry aeroheating environments and the predicted thermal response of thermal protection system (TPS) material. Entry vehicle TPS is often over-sized to mitigate uncertainty by combining conservative bounding scenarios together. The probabilistic thermal margin process allows engineers to make informed aeroshell design, flight design, and FTPS performance risk trades while preventing excessive FTPS margin from being applied. This paper describes the uncertainty analysis methodology used to carry out a probabilistic thermal margin process used for LOFTID’s aeroshell and explains how the calculated probability of exceeding flight allowable temperatures is used to design the FTPS and establish nominal flight design constraints. This probabilistic thermal margin process had never been applied to entry, decent, and landing design for a flown entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven Andrew Tobin↗

Aviation Safety Risk Modeling: Lessons Learned From Multiple Knowledge Elicitation Sessions

Aviation safety risk modeling has elements of both art and science. In a complex domain, such as the National Airspace System (NAS), it is essential that knowledge elicitation (KE) sessions with domain experts be performed to facilitate the making of plausible inferences about the possible impacts of future technologies and procedures. This study discusses lessons learned throughout the multiple KE sessions held with domain experts to construct probabilistic safety risk models for a Loss of Control Accident Framework (LOCAF), FLightdeck Automation Problems (FLAP), and Runway Incursion (RI) mishap scenarios. The intent of these safety risk models is to support a portfolio analysis of NASA's Aviation Safety Program (AvSP). These models use the flexible, probabilistic approach of Bayesian Belief Networks (BBNs) and influence diagrams to model the complex interactions of aviation system risk factors. Each KE session had a different set of experts with diverse expertise, such as pilot, air traffic controller, certification, and/or human factors knowledge that was elicited to construct a composite, systems-level risk model. There were numerous "lessons learned" from these KE sessions that deal with behavioral aggregation, conditional probability modeling, object-oriented construction, interpretation of the safety risk results, and model verification/validation that are presented in this paper.

Luxhoj, J. T.↗