Search NASA⌕ Search

SEARCH · Search NASA

Results for “Production planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

AND/OR graph representation of assembly plans

A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.

Homem De Mello, Luiz S.↗

Response to MRO's end-to-end data accountability challenges

(MRO) on August 12, 2005. It carries six science instruments and three engineering payloads. Because MRO will produce an unprecedented number of science products, it will transmit a much higher data volume via high data rate than any other deep space mission to date. Keeping track of MRO products as well as relay products would be a daunting, expensive task without a well-planned data-product tracking strategy. To respond to this challenge, the MRO project developed the End-to- End Data Accountability System by utilizing existing information available from both ground and flight elements. Therefore, a capability to perform first-order problem diagnosis is essential in order for MRO to answer the questions, where is my data? and when will my data be available? This paper details the approaches taken, design and implementation of the tools, procedures and teams that track data products from the time they are predicted until they arrive in the hands of the end users.

data delivery status tracking↗

A product data network to enable faster, easier, and better planning of building envelopes

The building envelopes contributes significantly to the energy-efficiency of the building. Building performance simulation has made it possible to compare façade technologies regarding energy demand, daylighting, thermal and visual comfort in detail. Planners, such as architects and engineers, need experience to find product data with the right quality and level of detail, and to process the data to fit the calculation and the application. In the available time, planners can compare only a limited number of products, which means that better solutions could go unnoticed. This paper presents a new concept for making product data easily accessible for building façade planning. The concept consists of a network of databases for the efficient exchange and use of optical and calorimetric data of glazing units, shading devices, and combinations of both. The paper presents the research questions, an analysis of the current challenges, six design goals for the product data network and its implementation together with a discussion. Many product data sources can be connected to many planning software applications via the specified application programming interface. When planning software connects to the product data network, the planning of building envelopes can be much faster because planners do not need to spend so much time to search and process product data manually. The planning of building envelopes can also become much easier, especially for planners with limited experience. They do not need to understand all the details about which data fits which calculation if the software company implements this. The planning of building envelopes can become much more reliable when software companies validate their use of the product data network, because the current manual process is prone to errors. The planning of building envelopes can also improve because more products can be compared in the available time, allowing better solutions to be found.

Maurer, Christoph↗

Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

Knighton, Donna L.↗

PLANNING FOR VEG-05 TOMATO CROP PRODUCTION ON THE INTERNATIONAL SPACE STATION

Growing fresh, nutritious, palatable produce for crew consumption during spaceflight may provide health-promoting, bioavailable nutrients and enhance the astronaut dietary experience as we move toward longer-duration missions. Tending plants may also serve as a countermeasure for crew psychological stresses associated with spaceflight. However, requirements to support consistent growth of a variety of nutritious crops under spaceflight environmental conditions remain unclear. This study explores the potential to grow crops for consumption on the International Space Station (ISS) using the Veggie vegetable-production system. Mizuna mustard was grown during VEG-04 studies in 2019, and human and plant data from those tests continue to be analyzed. Tomato plants will be grown for the VEG-05 experiment, and preflight definition studies are underway to ascertain the best hardware and operations for growing this fruiting crop. The variety of tomato selected for this study is ‘Red Robin’, a compact cherry tomato. Plants will be grown under two different red: blue lighting treatments using the Veggie units on ISS, and the impact of spectral quality on plant growth and yield, nutrient content, organoleptic acceptability, and microbial composition of the tomatoes will be assessed. Preliminary testing with this crop helped to identify responses to different analog types of growth hardware including both plant pillows and Passive Orbital Nutrient Delivery System (PONDS) units, and current testing is focusing on flight-like versions of this hardware. Challenges with fertilizer salts leaching out into the plant wicks and burning the stems of tomato were observed in earlier tests, so amended fertilizer and wick configurations have been developed. Crew procedures including plant thinning, watering, height adjustment with respect to lighting, and pollination are being validated. VEG-05 will be the first test of tomato fruit production on ISS. Lessons learned during preparation and implementation of the VEG-04 mizuna test for watering, and a separate ISS investigation with peppers (PH-04) in the Advanced Plant Habitat (APH) in terms of fertilizer, plant wicks, and pollination, will be adapted for this experiment. This research was co-funded by the Human Research Program and Space Biology (MTL#1075) in the ILSRA 2015 NRA call.

Veggie↗

Planning for VEG-05 Tomato Crop Production on the International Space Station

Growing fresh, nutritious, palatable produce for crew consumption during spaceflight may provide health-promoting, bioavailable nutrients and enhance the astronaut dietary experience as we move toward longer-duration missions. Tending plants may also serve as a countermeasure for crew psychological stresses associated with spaceflight. However, requirements to support consistent growth of a variety of nutritious crops under spaceflight environmental conditions remain unclear. This study explores the potential to grow crops for consumption on the International Space Station (ISS) using the Veggie vegetable-production system. Mizuna mustard was grown during VEG-04 studies in 2019, and human and plant data from those tests continue to be analyzed. Tomato plants will be grown for the VEG-05 experiment, and preflight definition studies are underway to ascertain the best hardware and operations for growing this fruiting crop. The variety of tomato selected for this study is ‘Red Robin’, a compact cherry tomato. Plants will be grown under two different red: blue lighting treatments using the Veggie units on ISS, and the impact of spectral quality on plant growth and yield, nutrient content, organoleptic acceptability, and microbial composition of the tomatoes will be assessed. Preliminary testing with this crop helped to identify responses to different analog types of growth hardware including both plant pillows and Passive Orbital Nutrient Delivery System (PONDS) units, and current testing is focusing on flight-like versions of this hardware. Challenges with fertilizer salts leaching out into the plant wicks and burning the stems of tomato were observed in earlier tests, so amended fertilizer and wick configurations have been developed. Crew procedures including plant thinning, watering, height adjustment with respect to lighting, and pollination are being validated. VEG-05 will be the first test of tomato fruit production on ISS. Lessons learned during preparation and implementation of the VEG-04 mizuna test for watering, and a separate ISS investigation with peppers (PH-04) in the Advanced Plant Habitat (APH) in terms of fertilizer, plant wicks, and pollination, will be adapted for this experiment. This research was co-funded by the Human Research Program and Space Biology (MTL#1075) in the ILSRA 2015 NRA call. Note: Presentation is a video formatted mp4 with a run time of 3 mins. 24 secs.

Veggie↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

Hypermedia and visual technology

Applications of a codified professional practice that uses visual representations of the thoughts and ideas of a working group are reported in order to improve productivity, problem solving, and innovation. This visual technology process was developed under the auspices of General Foods as part of a multi-year study. The study resulted in the validation of this professional service as a way to use art and design to facilitate productivity and innovation and to define new opportunities. It was also used by NASA for planning Lunar/Mars exploration and by other companies for general business and advanced strategic planning, developing new product concepts, and litigation support. General Foods has continued to use the service for packaging innovation studies.

Walker, Lloyd↗

Challenges of Moving IPG into Production

Over the past 5-6 years, NASA has been developing the Information Power Grid and has a persistent testbed currently based on GT2.4.2. This presentation will begin with an overview of IPG status and services, discuss key milestones in IPG development, and present early as well as expected applications. The presentation will discuss some of the issues encountered in developing a grid including the tension between providing centralized and distributed computing. These issues also affect how the grid is moved into full production. Finally, the presentation will provide current plans for moving IPG into full production, including gaining broad user input, developing acceptance criteria from the production operations group, planning upgrades, and training users.

Schulbach, Cathy↗

Description of data base management systems activities

One of the major responsibilities of the JPL Computing and Information Services Office is to develop and maintain a JPL plan for providing computing services to the JPL management and administrative community that will lead to improved productivity. The CISO plan to accomplish this objective has been titled 'Management and Administrative Support Systems' (MASS). The MASS plan is based on the continued use of JPL's IBM 3032 Computer system for administrative computing and for the MASS functions. The current candidate administrative Data Base Management Systems required to support the MASS include ADABASE, Cullinane IDMS and TOTAL. Previous uses of administrative Data Base Systems have been applied to specific local functions rather than in a centralized manner with elements common to the many user groups. Limited capacity data base systems have been installed in microprocessor based office automation systems in a few Project and Management Offices using Ashton-Tate dBASE II. These experiences plus some other localized in house DBMS uses have provided an excellent background for developing user and system requirements for a single DBMS to support the MASS program.

Source record↗

Space Crop Production and Exploration Food Systems

A virtual presentation to the University of North Dakota (UND) Space Studies Colloquium providing both an historical overview as well as NASA's current and future plans for crop production in support of exploration.

Crops↗

IPAD: Integrated Programs for Aerospace-Vehicle Design

The conference was organized to promote wider awareness of the IPAD program and its coming impact on American industry. The program focuses on technology issues that are critical to computer aided design manufacturing. Included is a description of a representative aerospace design process and its interface with manufacturing, the design of a future IPAD integrated computer aided design system, results to date in developing IPAD products and associated technology, and industry experiences and plans to exploit these products.

Source record↗

Potential commercial uses of EOS remote sensing products

The instrument complement of the Earth Observing System (EOS) satellite system will generate data sets with potential interest to a variety of users who are now just beginning to develop geographic information systems tailored to their special applications and/or jurisdictions. Other users may be looking for a unique product that enhances competitive position. The generally distributed products from EOS will require additional value added processing to derive the unique products desired by specific users. Entrepreneurs have an opportunity to create these proprietary level 4 products from the EOS data sets. Specific instruments or collections of instruments could provide information for crop futures trading, mineral exploration, television and printed medium news products, regional and local government land management and planning, digital map directories, products for third world users, ocean fishing fleet probability of harvest forecasts, and other areas not even imagined at this time. The projected level 3 product are examined that will be available at launch from EOS instruments and commercial uses of the data after value added processing is estimated.

Thompson, Leslie L.↗

Hubble Space Telescope - First Servicing Mission

Space Shuttle mission STS-61 was the first of several planned servicing missions for HST, intended to periodically replace failed components and upgrade scientific instruments with improved versions to keep the telescope viable and productive throughout its planned 15-year lifetime. This First Servicing Mission was also intended to correct several design flaws that were detected shortly after the launch of HST. There were three overall mission objectives for the STS-61 repair mission: 1) To Restore the Planned Scientific Capabilities: One complexity of the First Servicing Mission was the necessity for adding optical elements in the light path to correct the spherical aberration. These corrective optics were required to provide the quantitative science capability to enable key scientific programs to be carried out as originally planned. The addition of the COSTAR and the installation of WFPC2 both contributed to recovering these capabilities. 2) To Restore the Reliability of Vehicle Systems: Failed or degraded components had depleted some of the original subsystem redundancy, which had to be restored to allow continued science operations until the next servicing mission in 1997. Anomalous components that required servicing included the solar arrays, gyroscope sensing units, gyroscope electronics, magnetometers, solar array drive electronics, and electrical fuses. 3) To Validate the On-Orbit Servicing Concept for HST: Validation of the concept of on-orbit servicing as the way to achieve HST's full 15-year life was required to provide a foundation for future servicing missions.

Source record↗

Using the SPoRT POES/GOES Hybrid Product in OCONUS Forecasting

The SPoRT (Short-term Prediction and Research Transition) Program at the NASA/Marshall Space Flight Center has been providing unique NASA and NOAA data and techniques to partner Weather Forecast Offices (WFOs) for ten years. Data are provided in the Decision Support System used by WFO forecasters: AWIPS. For the last couple of years, SPoRT has been producing the POES/GOES Hybrid. This suite of products combines the strength ofl5- minute animations of GOES imagery - providing temporal continuity, with the higher resolution, relatively random availability, of polar orbiting (POES) imagery data. The product was first introduced with only MODIS data from NASA's Terra and Aqua satellites, but recently the VIIRS instrument onboard the Suomi-NPP satellite was added, providing better high-resolution coverage. These products represent SPoRT's efforts to prepare for higher resolution, higher frequency GOES-R imagery - as well as helping to move VIIRS (JPSS) data into the mainstream of weather forecasting. SPoRT generates 5 products for this dataset: Visible, Longwave Infrared (11 micrometers), Shortwave IR (3.7 micrometers), Water Vapor (6.7 micrometers), and Fog (Difference of 11 micrometer and 3.7 micrometer channels). The Water Vapor hybrid product has a Red-Blue-Green image from MODIS inlaid, since it provides even more qualitative information than water vapor alone. Animated examples of the products will be shown in this presentation. While the resolution at nadir of GOES imagery is nominally Han (4km for IR channels), the inlaid polar orbiter imagery has a resolution of 250m (lkm for IR channels). This has tremendous application in the continental US. However, in high latitudes, since the usefulness of GOES degrades poleward rapidly, the contrast of GOES and POES data is stark. The consistent temporal nature of GOES, even though at a reduced resolution at high latitudes, provides basic situational awareness, but the introduction of polar data is very helpful in seeing the big picture with clarity - even if only briefly. This presentation will offer real situations where these products helped forecasters make better informed decisions quickly. Plans to augment the product further with the addition of data from several A VHRR instruments will be described.

Smith, Matt↗

One Earth Energy CO 2 Capture Facility FEED Study and Class 4 Cost Estimate

The One Earth Energy (OEE) plant in Gibson City, Illinois produces ethanol through a corn fermentation process. For this project, the maximum possible ethanol production rate for this facility is 160 million gallons per year (MMgal/yr) based on discussions with plant personnel regarding recent annual production rates and any foreseeable plans or possibilities to increase ethanol production at this facility. Yeast ferments the corn mash to produce ethanol and produces carbon dioxide (CO 2 ) as a by-product at the same time. The CO 2 bubbles out of the mash and flows through a packed bed water scrubber to remove volatile organic compounds before the gas vents to atmosphere. CO 2 will be captured after it has passed through the existing scrubber.

09 BIOMASS FUELS↗

A Fresnel collector process heat experiment at Capitol Concrete Products

An experiment is planned, conducted and evaluated to determine the feasibility of using a Power Kinetics' Fresnel concentrator to provide process heat in an industrial environment. The plant provides process steam at 50 to 60 psig to two autoclaves for curing masonry blocks. When steam is not required, the plant preheats hot water for later use. A second system is installed at the Jet Propulsion Laboratory parabolic dish test site for hardware validation and experiment control. Experiment design allows for the extrapolation of results to varying demands for steam and hot water, and includes a consideration of some socio-technical factors such as the impact on production scheduling of diurnal variations in energy availability.

Hauger, J. S.↗