Search NASASearch

SEARCH · Search NASA

Results for “Program Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Global Biology Research Program: Program plan

Biological processes which play a dominant role in these cycles which transform and transfer much of this material throughout the biosphere are examined. A greater understanding of planetary biological processes as revealed by the interaction of the biota and the environment. The rationale, scope, research strategy, and research priorities of the global biology is presented.

Source record

The NASA Space Station program plans

The design of a permanently manned space station is discussed. The role of the space shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

Freitag, R. F.

The NASA Space Station program plans

The design of a permanently manned Space Station is discussed. The role of the Space Shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

Freitag, R. F.

Highlights of NASA's Special ETO Program Planning Workshop on rocket-based combined-cycle propulsion system technologies

A NASA workshop on rocket-based combined-cycle propulsion technologies is described emphasizing the development of a starting point for earth-to-orbit (ETO) rocket technologies. The tutorial is designed with attention given to the combined development of aeronautical airbreathing propulsion and space rocket propulsion. The format, agenda, and group deliberations for the tutorial are described, and group deliberations include: (1) mission and space transportation infrastructure; (2) vehicle-integrated propulsion systems; (3) development operations, facilities, and human resource needs; and (4) spaceflight fleet applications and operations. Although incomplete the workshop elevates the subject of combined-cycle hypersonic propulsion and develops a common set of priniciples regarding the development of these technologies.

Escher, W. J. D.

Project Columbiad: Mission to the Moon. Book 2, volume 3: Stage configuration designs; volume 4: Program plan

The Earth Orbital Rendezvous (EOR) configuration for the piloted mission is composed of three propulsive elements in addition to the Crew Module (CM): Primary Trans-Lunar Injection (PTLI), Lunar Braking Module (LBM), and Earth Return Module (ERM). The precursor mission is also composed of three propulsive elements in addition to its surface payloads: PTLI, LBM and the Payload Landing Module (PLM). Refer to Volume 1, Section 5.1 and 5.2 for a break-up of the different stages into the four launches. A quick summary is as follows: PTLI is on Launch 1 and 3 while the LBM, PLM, and surface payloads are on Launch 2 and another LBM, ERM, and CM on Launch 4. The precursor mission is designed to be as modular as possible with the piloted mission for developmental cost considerations. The following topics are discussed: launch vehicle description; primary trans-lunar injection stage; lunar braking module; earth return module; crew module; payload landing module; and surface payload description.

Source record

Space physics strategy: Implementation study. Volume 2: Program plan

In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.

Source record

Autonomous guidance, navigation and control bridging program plan

A four-center NASA team has undertaken to develop and demonstrate mature technologies applicable to autonomous guidance, navigation, and control (GNC) systems for application to the National Space Transportation System in full cognizance of its operational, safety, and performance requirements, as well as its cost constraints. Attention is to be given to GNC launch/landing weather assessment, ascent guidance, ascent load relief, and system failure during ascent. Preliminary results indicate that a ground-computed atmospheric steering profile can achieve near-optimum performance as well as high cost effectiveness.

Mcswain, G. G.

Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) Spares Program Plan

This plan specifies the spare components to be provided for the EOS/AMSU-A instrument and the general spares philosophy for their procurement. It also address key components not recommended for spares, as well as the schedule and method for obtaining the spares. The selected spares list was generated based on component criticality, reliability, repairability, and availability. An alternative spares list is also proposed based on more stringent fiscal constraints.

Chapman, Weldon

A strawman SLR program plan for the 1990s

A series of programmatic and technical goals for the satellite laser ranging (SLR) network are presented. They are: (1) standardize the performance of the global SLR network; (2) improve the geographic distribution of stations; (3) reduce costs of field operations and data processing; (4) expand the 24 hour temporal coverage to better serve the growing constellation of satellites; (5) improve absolute range accuracy to 2 mm at key stations; (6) improve satellite force, radiative propagation, and station motion models and investigate alternative geodetic analysis techniques; (7) support technical intercomparison and the Terrestrial Reference Frame through global collocations; (8) investigate potential synergisms between GPS and SLR.

Degnan, John J.

The Mars Surveyor Program: Planned Orbiter and Lander for 2001

Replanning could affect the 2001 mission. The orbiter will arrive at Mars on Oct. 20, 2001, carrying the Gamma Ray Spectrometer (GRS) and the Thermal Emission Imaging System (THEMIS). The Lander is scheduled to land on Mars on January 22, 2002.

Saunders, R. S.

FY 2001 and Beyond Program Plan

The scope of the project summarized in this viewgraph presentation is to develop and demonstrate third generation airframe technologies that provide significant reductions in cost of space transportation systems while dramatically improving the safety and higher operability of those systems. The Earth-to-orbit goal is to conduct research and technology development and demonstrations which will enable US industry to increase safety by four orders of magnitude (loss of vehicle/crew probability less than 1 in 1,000,000 missions) and reduce costs by two orders of magnitude within 25 years.

Bowles, Dave