Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Satellite services system program plan

The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

Hoffman, Stephen J.↗

Advanced spacecraft fire safety: Proposed projects and program plan

A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

Youngblood, Wallace W.↗

Advanced Platform Systems Technology study. Volume 4: Technology advancement program plan

An overview study of the major technology definition tasks and subtasks along with their interfaces and interrelationships is presented. Although not specifically indicated in the diagram, iterations were required at many steps to finalize the results. The development of the integrated technology advancement plan was initiated by using the results of the previous two tasks, i.e., the trade studies and the preliminary cost and schedule estimates for the selected technologies. Descriptions for the development of each viable technology advancement was drawn from the trade studies. Additionally, a logic flow diagram depicting the steps in developing each technology element was developed along with descriptions for each of the major elements. Next, major elements of the logic flow diagrams were time phased, and that allowed the definition of a technology development schedule that was consistent with the space station program schedule when possible. Schedules show the major milestone including tests required as described in the logic flow diagrams.

Source record↗

Assessing Flooding Vulnerability to Assist High Water Intervention and Urban Planning Programs in the Charles River Watershed with NASA DEVELOP

The Charles River watershed intersects 35 municipalities within the Boston Metropolitan Area and has a total population of 1.2 million, making it one of the most densely populated watersheds in New England. In recent years, the watershed has observed higher rates of flood inundation, mainly due to increased development, extreme precipitation events, and increased surface runoff. As the frequency of flooding events increases and a changing climate poses an ongoing threat to local communities, governments and organizations in Massachusetts are in need of accurate flood risk assessments. NASA DEVELOP partnered with the Charles River Watershed Association, the Town of Natick’s Office of Sustainability, and the Massachusetts Audubon Society to assess flood vulnerability and susceptibility in the watershed. The team used Landsat 5 Thematic Mapper, Landsat 8 Operational Land Imager, Sentinel-1 C-Band Synthetic Aperture Radar, and Sentinel-2 MultiSpectral Instrument to assess the feasibility of identifying the extent of past flood events using remote sensing. After identifying images that overlapped with reported flood events, the team concluded that it was not feasible to use Earth observation data to detect localized flooding in the time available for this study. Instead, the Federal Emergency Management Agency (FEMA) 100-year floodplain was used as a proxy for areas where flooding may occur. The team used statistical regression analysis and validation and supervised classification to develop a flood susceptibility map, incorporating several flood conditioning factors. The susceptibility maps were calibrated to various thresholds, including two that highlight hypothetical flooding under more liberal and more conservative planning scenarios. These were overlaid with demographic and socioeconomic data to create flood vulnerability maps. The team’s flood susceptibility maps showed an improvement in capturing known flood events over the FEMA 100-year and 500-year floodplain maps. These results will be improved with the addition of stormwater drainage mapping and precipitation data. Results can be used to fill in the gaps to help the stakeholders understand their communities’ vulnerability and susceptibility to flooding and improve their preparedness plans.

Trista Brophy↗

Light Water Reactor Sustainability Program: Materials Research Pathway: FY 23 Technical Program Plan

Components in operating commercial nuclear power plants must withstand very harsh environments that include extended time at neutron and gamma irradiation, stress, and temperature, as well as possible exposure to corrosive media. The many modes of materials degradation are complex and often include synergies between multiple environmental variables and conditions that vary depending on locations and materials. Understanding and managing materials degradation is a requirement for the continued safe and reliable operation of nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Voyager design study. volume vi- program plans

Voyager spacecraft design - landing module sterilization effects and requirements, long term space soak effects, high reliability requirements, and entry and operation on Mars

STERILIZATION↗