At least 145 records · Page 8

Lower Three Runs Remediation Safety Preparation Strategy - 13318

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Requirements for Cataloging Hanford Geophysical Datasets

Environmental management activities at the Hanford Site produce extensive data about site conditions, contaminants, cleanup, and more. Managing and archiving that data requires a high degree of collaboration among site contractors and a high level of awareness by project managers and staff. Part of that effort is developing a Hanford Environmental Information and Data Index (HEIDI) to organize the data and maximize its value by making it findable and available for reuse. The objective is to catalog the disparate data sets collected to address the evolving needs of planning, executing, and documenting cleanup over several decades up to the present day, including links to active data sources when available. A properly implemented data catalog makes finding environmental datasets related to an area or theme a routine, reliable process, without requiring the searcher to have special knowledge that a data set exists and where it may be stored. In this project, a working group, including the U.S. Department of Energy, the Hanford Site contractors, and Pacific Northwest National Laboratory staff, identified needs and requirements for handling complex site data. Geophysical data was chosen as a test case because it can be large and complex and often involves multiple processing steps to extract the information incorporated into deliverables. The ability to document those steps was one of the requirements identified for the catalog. In addition to developing requirements, other activities included selecting a metadata schema and initial testing with the objective of determining whether the workflow and capabilities of selected data catalog software platforms were sufficient to implement and impose the identified requirements. This initial testing involved running the default catalog instance using the software platform of interest and altering the configuration to achieve each requirement, if possible. Where configuration alone was insufficient, the possibility of modifying the software by changing the code was examined, but not implemented. A follow-on task is planned to reprogram the code as necessary to implement requirements in a prototype catalog.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Fermilab Laboratory Directed Research & Development Program Plan

Fermilab is executing Laboratory Directed Research and Development (LDRD) as outlined by order DOE O 413.2B in order to enhance and realize the mission of the laboratory in a manner that also supports the laboratory’s strategic objectives and the mission of the Department of Energy. LDRD funds enable scientific creativity, allow for exploration of “high risk, high payoff” research, and allow for the demonstration of new ideas, technical concepts, and devices. LDRD also has an objective of maintaining and enhancing the scientific and technical vitality of Fermilab. LDRD is able to fund employee-initiated proposals that address the current strategic objectives and better position Fermilab for future mission needs. The request for such funds is made in consideration of the investment needs, affordability, and directives from DOE and Congress. Review procedures of the proposals will insure that those proposals which most address the strategic goals of the DOE and the Laboratory or which best position Fermilab for the future will be recommended to the Laboratory Director who has responsibility for approval. The execution of each approved project will be the responsibility of the Principal Investigator, PI, who will follow existing Laboratory guidelines to ensure compliance with safety, environmental, and quality assurance practices. A Laboratory Director-appointed LDRD Coordinator will work with Committees, Laboratory Management, other Fermilab Staff, and the PI’s to oversee the implementation of policies and procedures of LDRD and provide the management and execution of this Annual Program Plan. FY16 represents third fiscal year in which LDRD has existed at Fermilab. The number of preliminary proposals (117) submitted in response to the LDRD Call for Proposals indicates very strong interest of the program within the Fermilab community. The first two Calls have resulted in thirteen active LDRD projects – and it is expected that between five and seven new projects will be approved in response to the FY16 Call for Proposals. The implementation of the program compared with FY15 is mostly unchanged except that the program is on the expected normal fiscal year calendar cycle with new projects starting at the beginning of the fiscal year. Because of this, there is some expanded discussion that the Laboratory Director may decide to initiate mid-year Late Start or Strategic- Hire LDRD projects.

99 GENERAL AND MISCELLANEOUS↗

Performance Year 1 Technical Report - OPEN COG Grid: Extendable Coherent Models-Datasets for Cognitive Power Grids

The OPEN COG Grid project is a collaborative effort between LLNL, NREL, and Texas A&M University (TAMU) to develop synthetic power system datasets that (i) contain all technical information that would be available in a real system, allowing to conduct studies ranging from dynamic simulation to long term planning studies; ii) are accessible to researchers from the broader data sciences community, as oppossed to power system experts only; and (iii) This report summarizes the work conducted during the first 15 months of execution of the project. These activities encompassed: 1. Conduct a survey of existing open data sets and open source power systems simulators, their supported use cases, and accessibility (Chapter 1). 2. Define a new extensible specification for power system data, covering all parameters necessary for most computational use cases (Chapter 2). 3. Collecting real technical system data to complete missing parameters in existing open source datasets (Chapter 3). 4. Develop models that capture the behavior of emergent actors in power grids, neglected by existing datasets; aggregated residential demand response (Chapter 4) and demand response of cryptocurrency miners (Chapter 5). 5. Collect detailed spatial information on distributed energy resources, particular, solar photovoltaic facilities (Chapter 6). The following chapters provide detailed descriptions of these tasks, the assumptions taken, and their findings. In conducting these tasks, the project team produced: two (ac&#x2;cepted) conference papers; one journal paper under submission; one draft journal paper pending submission; released one repository with the developed power system data specifi&#x2;cation, with documentation and examples; and one extended dataset for the Texas power grid under review for release. The team hopes these contributions will enhance access to power system data and remove barriers to the development of new computational techniques for power systems, particularly, those inspired by cognitive sciences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Outyear Budgeting Tool

OBTool performs the following: • Consistent method and tool to develop/estimate fiscal year (FY) 2010 and outyear budget/estimates • Maintain configuration control on resource rates and changes to outyear budget estimates, while allowing for accessibility, accountability, and tracking shared access between program managers, facility managers (FMs), project managers (PMs), cost account managers (CAMs), and project controls engineers (PCEs) • Consistency in budget estimating methodology, including scope, requirements, basis of estimates, resources, activities, escalation, and presentation of documentation in tasks and execution plans and reports • Ability to sync (i.e. export) and import data into Primavera and Cobra to the lifecycle baseline file

Carlos Castillo, Jerel Nelson↗

2017 Grid Modernization Peer Review Report; Foundational Projects and Technical Area Portfolio Review

In April 2017, the U.S. Department of Energy’s (DOE’s) Grid Modernization Initiative (GMI) conducted its first external peer review of the projects awarded to the Grid Modernization Laboratory Consortium (GMLC) to execute a diverse portfolio of technologies to modernize the nation’s grid. The six technology areas reviewed during the 2017 Project Peer Review were: Design and Planning Tools; Devices and Integrated Systems; Institutional Support, Security and Resilience; Sensing and Measurement; and System Operations, Power Flow, and Control. Results of the 2017 Peer Review have been, and will be, used to help inform programmatic decision making, modify or discontinue existing projects, guide future funding opportunities, and support other budget and strategic planning objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2017 Year End Nuclear Science User Facilities (NSUF) Post-Irradiation Examination Summary Report

The Nuclear Science User Facilities (NSUF) are part of a growing number of Department of Energy (DOE) user facilities in the U.S., and is the only national designated nuclear energy user facility. Through a peer-reviewed proposal process, NSUF provides external research teams cost-free access to reactor, post-irradiation examination (PIE) and beamline capabilities at INL and a diverse mix of affiliated partner institutions at universities, national laboratories and industry facilities located across the country. In Fiscal Year 2017 (FY17), the NSUF sponsored planning, management and execution of PIE activities at Idaho National Laboratory (INL), the Center for Advanced Energy Studies (CAES), and other NSUF partner facilities. The individual projects associated with these PIE activities are a result from DOE awards under the following mechanisms: Consolidated Innovative Nuclear Research (CINR) awards that include full sample irradiation and PIE, PIE only (using samples from the NSUF Fuel and Materials Library) awards, or Rapid Turn-Around Experiments (RTE). An accounting of FY17 activities for each project is provided in this report.

36 MATERIALS SCIENCE↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting the Impact of Climate Change on U.S. Power Grids and Its Wider Implications on National Security

We discuss our technosocial analytics research and devel-opment on predicting and assessing the impact of climate change on U.S. power-grids and the wider implications for national security. The ongoing efforts extend cutting-edge modeling theories derived from climate, energy, social sciences, and national security domains to form a unified system coupled with an interactive visual interface for technosocial analysis. The goal of the system is to create viable future scenarios that address both technical and social factors involved in the model domains. These scenarios enable policy makers to formulate a coherent, unified strategy towards building a safe and secure society. The paper gives an executive summary of our efforts in the past fiscal year and provides a glimpse of our work planned for the second year of the three-year project being conducted at the Pacific Northwest National Laboratory.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Idaho National Laboratory Ten-Year Site Plan Project Description Document: Descriptions of the capital projects delineated in the Idaho National Laboratory 2013 - 2022 Ten-Year Site Plan as of June 2011

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL operational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Manufacturing of Cathode Materials for Lithium-ion Batteries

Original objectives (per the Statement of Project Objectives) centered on developing and translating a continuous pilot process for cathode materials production while targeting (i) a 29% manufacturing cost reduction, (ii) an 82% energy consumption reduction for cathode production, and (iii) a doubling of manufacturing productivity. Planned validation included characterization at appropriate analytical facilities and electrochemical performance evaluation progressing from half-cells to pouch-cell formats, with a pathway to kilogram-scale production of finished cathode materials for representative testing. Scope evolution: During execution, the project team identified that the surfactant-enabled chemistry offered high selectivity for lithium precipitation from brine sources. A formal scope revision shifted the final project year from cathode manufacturing development to direct lithium extraction/lithium recovery, while maintaining the overarching intent of cost reduction and process simplification relevant to the battery supply chain.

25 ENERGY STORAGE↗

U.S. China Carbon Capture and Storage Development Project at West Virginia University

The original overall objective of this activity was to undertake resource evaluation and planning for CCS projects and to describe and quantify the geologic, environmental, and economic challenges to successful development of large-scale CCS in China’s coal sector. Several project execution barriers were encountered in the course of this project, most notably a project stop/delay due to funds availability/costing restrictions from the US State Department to the US Department of Energy at the end of CY2012, which halted project execution from January 2, 2013 to April 1, 2013. At the resolution of this project delay, it was communicated to the project team that the overall project period would also be reduced, from a completion date of February 28, 2014 to December 31, 2013. The net impact of all these changes was a reduction in the project period from 24 months (3/1/2012-2/28/2014) to 22 months (3/1/2012-12/31/2013), with a 3 month stop from 1/1/2013-3/31/2013. The project team endeavored to overcome these project time impacts, focusing heavily on technoeconomic modeling that would be deliverable under Task 3 (Ordos Basin Feasibility Study), and choosing to abandon the full investigation into the Demonstration Site (Task 4) due to the reduced project time. The ultimate focus of this project changed to work with the Chinese on a carbon atlas/geologic characterization, and on mechanisms for CO2 storage options from high-quality streams within China.

20 FOSSIL-FUELED POWER PLANTS↗

Project Plan: Salt in Situ Heater Test.

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Investigations of Viability of Cold Spray and FSW as a Spent Nuclear Fuel Dry Storage Canister Mitigation Tool

The purpose of this work is to investigate the use of cold spray and friction stir welding or processing (FSW/P) for repair and mitigation of chloride-induced stress corrosion cracking (CISCC) in dry cask storage system (DCSS) canisters to ensure integrity far beyond their original license period. This report provides a viability analysis of cold spray and friction stir welding for repair and fabrication of DCSS canisters. This report presents experimental work and a research strategy to optimize and evaluate cold spray and FSW/P for CISCC resistance. The literature reports that the following three conditions must exist for CISCC to occur: tensile stress, corrosive environment, and susceptible material. These conditions must be understood and accounted for while evaluating CISCC susceptibility. Furthermore, non-obvious factors, such as surface conditions and geometric confinement, can dramatically increase the intensity of one or more of the three listed conditions for CISCC. Arc welding should be considered for either temporary or permanent repair when combined with a mitigation technology. It is known that alloys used in the existing inventory of spent nuclear fuel storage canisters become sensitized in areas around fusion welds. Technologies, such as cold spray or FSW, can mitigate the sensitization caused by fusion welds. FSW/P and cold spray, potential alternatives for fabrication and repair, are solid-phase processes. No melting occurs and the energy input can be controlled such that no harm is done to the base metal during these processes. FSW/P should be considered for use in new fabrication of canisters and repair of existing canisters. Low heat input and grain refinement result in material with improved mechanical properties and comparable generalized corrosion performance relative to base metal. FSW/P offers the potential of through-thickness CISCC resistance. Cold spray should be considered for production, mitigation, and repair of canisters. Cold spray has demonstrated the ability to deposit stainless steel, Inconel alloys, and other alloys on stainless steel 304L such that galvanic potential is matched and resistance to pitting is improved. The technical basis for cold spray mitigation and repair within the overpack using remote robotic equipment is established. A non-obvious application to the research community is the sealing of crevices. All reported instances of CISCC in the fielded nuclear applications were associated with crevice corrosion. This can be avoided by cold spraying to seal crevices. The bulk of the work planned for FY 2020 will be generating coupons for CISCC testing by collaborative projects at Pacific Northwest National Laboratory and Sandia National Laboratories. First an exploratory study will be executed that will include screening studies and process optimization. This task will identify the effect of process parameters on microstructure and CISCC resistance. Optimized parameters will be used to produce a smaller number of coupons for full testing and evaluation. Test methods for evaluating CISCC resistance must meet the following criteria: (1) normalized surface geometry and exposed process microstructure, (2) account for residual stresses, (3) be in a controlled and appropriate test environment, and (4) be numerically quantifiable and repeatable. Failure to meet these criteria could lead to results that cannot be used for comparative analysis of processes and materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

17 WIND ENERGY↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

A Long-Term Strategic Plan for Hanford Sediment Physical Property and Vadose Zone Hydraulic Parameter Databases

Physical property data and unsaturated hydraulic parameters are critical input for analytic and numerical models used to predict transport and fate of contaminants in variably saturated porous media and to assess and execute remediation alternatives. The Remediation Decision Support (RDS) project, managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) and the CH2M Hill Plateau Remediation Company (CHPRC), has been compiling physical and hydraulic property data and parameters to support risk analyses and waste management decisions at Hanford. Efforts have been initiated to transfer sediment physical property data and vadose zone hydraulic parameters to CHPRC for inclusion in HEIS-Geo, a new instance of the Hanford Environmental Information System database that is being developed for borehole geologic data. This report describes these efforts and a strategic plan for continued updating and improvement of these datasets.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗