Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Orbit Determination Covariance Analyses for the Parker Solar Probe Mission

This paper details pre-launch navigation covariance analyses for the Parker Solar Probe mission. Baseline models and error assumptions are outlined. The results demonstrate how navigation will satisfy requirements and are used to define operational plans. A few sensitivities are identified and the accompanying investigations are described. Predicted state uncertainty results show that most requirements are met with substantial margin. Moreover, navigation sensitivities may be accommodated operationally and this has been incorporated into project planning. Detailed results are presented only for select launch dates, however twenty unique trajectories (one per launch opportunity) have been assessed.

Jones, Drew Ryan↗

ISTAR: Project Status and Ground Test Engine Design

Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.

Quinn, Jason Eugene↗

Aircraft Lightning Electromagnetic Environment Measurement

This paper outlines a NASA project plan for demonstrating a prototype lightning strike measurement system that is suitable for installation onto research aircraft that already operate in thunderstorms. This work builds upon past data from the NASA F106, FAA CV-580, and Transall C-180 flight projects, SAE ARP5412, and the European ILDAS Program. The primary focus is to capture airframe current waveforms during attachment, but may also consider pre and post-attachment current, electric field, and radiated field phenomena. New sensor technologies are being developed for this system, including a fiber-optic Faraday polarization sensor that measures lightning current waveforms from DC to over several Megahertz, and has dynamic range covering hundreds-of-volts to tens-of-thousands-of-volts. A study of the electromagnetic emission spectrum of lightning (including radio wave, microwave, optical, X-Rays and Gamma-Rays), and a compilation of aircraft transfer-function data (including composite aircraft) are included, to aid in the development of other new lightning environment sensors, their placement on-board research aircraft, and triggering of the onboard instrumentation system. The instrumentation system will leverage recent advances in high-speed, high dynamic range, deep memory data acquisition equipment, and fiber-optic interconnect.

Ely, Jay J.↗

Risk Management at the Total Project Level

Flight Projects plan their work against challenging technical objectives and tight schedules, and in the new environment of Faster-Better-Cheaper, low, rigid budgets.

Risk Management Space Projects↗

Telescience Resource Kit Software Lifecycle

The challenge of a global operations capability led to the Telescience Resource Kit (TReK) project, an in-house software development project of the Mission Operations Laboratory (MOL) at NASA's Marshall Space Flight Center (MSFC). The TReK system is being developed as an inexpensive comprehensive personal computer- (PC-) based ground support system that can be used by payload users from their home sites to interact with their payloads on board the International Space Station (ISS). The TReK project is currently using a combination of the spiral lifecycle model and the incremental lifecycle model. As with any software development project, there are four activities that can be very time consuming: Software design and development, project documentation, testing, and umbrella activities, such as quality assurance and configuration management. In order to produce a quality product, it is critical that each of these activities receive the appropriate amount of attention. For TReK, the challenge was to lay out a lifecycle and project plan that provides full support for these activities, is flexible, provides a way to deal with changing risks, can accommodate unknowns, and can respond to changes in the environment quickly. This paper will provide an overview of the TReK lifecycle, a description of the project's environment, and a general overview of project activities.

Griner, Carolyn S.↗

Dynamic Modeling of Solar Dynamic Components and Systems

The purpose of this grant was to support NASA in modeling efforts to predict the transient dynamic and thermodynamic response of the space station solar dynamic power generation system. In order to meet the initial schedule requirement of providing results in time to support installation of the system as part of the initial phase of space station, early efforts were executed with alacrity and often in parallel. Initially, methods to predict the transient response of a Rankine as well as a Brayton cycle were developed. Review of preliminary design concepts led NASA to select a regenerative gas-turbine cycle using a helium-xenon mixture as the working fluid and, from that point forward, the modeling effort focused exclusively on that system. Although initial project planning called for a three year period of performance, revised NASA schedules moved system installation to later and later phases of station deployment. Eventually, NASA selected to halt development of the solar dynamic power generation system for space station and to reduce support for this project to two-thirds of the original level.

Hochstein, John I.↗

Simulating Underexpanded Jets in Martian and Lunar Environments

As part of the Game Changing Development (GCD) Program, funded by NASA’s Space Technology Mission Directorate (STMD), the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The GCD PSI Project, planned to be accomplished over a four year period, contains a Predictive Simulation Capability (PSC) Element focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~650 Pa) and Lunar (vacuum) ambient environments. In addition to the PSC Element, the PSI Project also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper describes the activities and accomplishments in the past year for the Prediction of Plume Flow in low pressure environments component of the PSI Project. While the Loci/Chem Computational fluid dynamics (CFD) application has been validated and used extensively for simulating launch environments in atmospheric conditions, use of this tool for simulating supersonic plumes at Mars-like ambient pressure requires further validation. CFD simulations of underexpanded jets have been performed using Loci/Chem for Mars-like conditions to predict several metrics for steady laminar, turbulent, and impinging plumes. The CFD results are compared with an experimental data set for low Reynolds number plumes at these conditions in order to evaluate the current capability of the Loci/Chem tool for these types of environments. The CFD validation results to date show reasonable agreement with the experimental data across all of the metrics of interest for the configurations considered. The Loci/Chem-Boltzmann CFD application is a hybrid continuum/rarefied flow solver which extends modeling capabilities to very low pressure environments such as those on the Moon. The Loci/Chem-Boltzmann solver uses a gradient-based continuum breakdown criterion to restrict solution of the computationally expensive Boltzmann equation to only a subset of the domain, while using the Navier-Stokes equations elsewhere. This CFD application is under active development, and current efforts toward establishing production ready capability for evaluating Lunar plume surface interactions are well under way. Initial simulations of an Apollo LEM indicate that several regions of the flow require solving the Boltzmann equations due to extreme rarefaction. Early simulations are promising, indicating reasonable overall computational time for a full 3D human scale lander simulation.

Thomas Shurtz↗

Qualitative Comparison of Pathfinder Three-Dimensional Transient Gas Granular Simulation Results to Imagery from a Subscale, Reduced Pressure Plume Surface Interaction Ground Test

NASA’s Game Changing Development Program, funded by NASA’s Space Technology Mission Directorate, the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The PSI Project, planned to be completed over a four year period, contains a Predictive Simulation Capability (PSC) Element focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~600 Pa) and Lunar (vacuum) ambient environments. In addition to the PSC Element, the PSI Project also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper describes the first Pathfinder three-dimensional, transient simulation of the test configuration used to acquire erosion and cratering test data as part of the Physics Focused Ground Test conducted by the PSI Project in FY2021. This first pathfinder simulation was conducted using the Loci/GGFS (Gas Granular Flow Solver), a computational fluid dynamics tool developed in part with funding provided by the PSI Project. Crater growth and ejecta flow paths from the pathfinder simulation is compared to raw high-speed imagery PFGT results of the crater growth. There is significant similarity of test and simulation to warrant expending resources on a more rigorous quantitative Validation Assessment.

J S West↗

Qualitative Comparison of Pathfinder Three-Dimensional Transient Gas Granular Simulation Results to Imagery from a Subscale, Reduced Pressure Plume Surface Interaction Ground Test

NASA’s Game Changing Development Program, funded by NASA’s Space Technology Mission Directorate, the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The PSI Project, planned to be completed over a four year period, contains a Predictive Simulation Capability (PSC) Element focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~600 Pa) and Lunar (vacuum) ambient environments. In addition to the PSC Element, the PSI Project also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper describes the first Pathfinder three-dimensional, transient simulation of the test configuration used to acquire erosion and cratering test data as part of the Physics Focused Ground Test conducted by the PSI Project in FY2021. This first pathfinder simulation was conducted using the Loci/GGFS (Gas Granular Flow Solver), a computational fluid dynamics tool developed in part with funding provided by the PSI Project. Crater growth and ejecta flow paths from the pathfinder simulation is compared to raw high-speed imagery PFGT results of the crater growth. There is significant similarity of test and simulation to warrant expending resources on a more rigorous quantitative Validation Assessment.

Jeff West↗

VTOL as it applies to resource development in the Canadian north

It is pointed out that, for many of the natural resource development projects planned in Canada between now and the end of the century, it may be necessary for the work force to commute to the site by air. Examples of successful operations, including those involving VTOL, are given. A computer program developed for determining the least expensive type of aircraft for commuting to remote projects is described. It is noted that the program can select both fixed-wing and helicopter aircraft types for a specific project, employing such variables as the size and shift schedules of the work force and the commuting distance. Capital and operating costs of existing and proposed aircraft types, as well as groundside infrastructure operations and maintenance costs, are compared for competing aircraft.

Lightfoot, R. N.↗

Structural considerations for a software life cycle dynamic simulation model

This paper presents the results of a preliminary study into the prospects for simulating the software implementation and maintenance life cycle process, with the aim of producing a computerized tool for use by management and software engineering personnel in project planning, tradeoff studies involving product, environmental, situational, and technological factors, and training. The approach taken is the modular application of a 'flow of resource' concept to the systems dynamics simulation modeling technique. The software life cycle process is represented as a number of stochastic, time-varying, interacting work tasks that each achieves one of the project milestones. Each task is characterized by the item produced, the personnel applied, and the budgetary profile.

Tausworthe, R. C.↗

Dryden Flight Research Center Critical Chain Project Management Implementation

In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

Hines, Dennis O.↗

Computing and combustion

Coming into the Combustion Branch of the Turbomachinery and Propulsion Systems Division, there was not any set project planned out for me to work on. This was understandable, considering I am only at my sophmore year in college. Also, my mentor was a division chief and it was expected that I would be passed down the line. It took about a week for me to be placed with somebody who could use me. My first project was to write a macro for TecPlot. Commonly, a person would have a 3D contour volume modeling something such as a combustion engine. This 3D volume needed to have slices extracted from it and made into 2D scientific plots with all of the appropriate axis and titles. This was very tedious to do by hand. My macro needed to automate the process. There was some education I needed before I could start, however. First, TecPlot ran on Unix and Linux, like a growing majority of scientific applications. I knew a little about Linux, but I would need to know more to use the software at hand. I took two classes at the Learning Center on Unix and am now comfortable with Linux and Unix. I already had taken Computer Science I and II, and had undergone the transformation from Computer Programmer to Procedural Epistemologist. I knew how to design efficient algorithms, I just needed to learn the macro language. After a little less than a week, I had learned the basics of the language. Like most languages, the best way to learn more of it was by using it. It was decided that it was best that I do the macro in layers, starting simple and adding features as I went. The macro started out slicing with respect to only one axis, and did not make 2D plots out of the slices. Instead, it lined them up inside the solid. Next, I allowed for more than one axis and placed each slice in a separate frame. After this, I added code that transformed each individual slice-frame into a scientific plot. I also made frames for composite volumes, which showed all of the slices in the same XYZ space. I then designed an addition companion macro that exported each frame into its own image file. I then distributed the macros to a test group, and am awaiting feedback. In the meantime, a am researching the possible applications of distributed computing on the National Combustor Code. Many of our Linux boxes were idle for most of the day. The department thinks that it would be wonderful if we could get all of these idle processors to work on a problem under the NCC code. The client software would have to be easily distributed, such as in screensaver format or as a program that only ran when the computer was not in use. This project proves to be an interesting challenge.

Thompson, Daniel↗

An assessment of PERT as a technique for schedule planning and control

The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

Sibbers, C. W.↗

The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)

As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.

Epp, Chirold D.↗

Building and Leading the Next Generation of Exploration Launch Vehicles

NASA s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicle. In 2009, the Ares Projects plan to: conduct the first flight test of Ares I, test-fire the Ares I first stage solid rocket motor; build the first integrated Ares I upper stage; continue testing hardware for the J-2X upper stage engine, and continue refining the design of the Ares V cargo launch vehicle. These efforts come with serious challenges for the project leadership team as it continues to foster a culture of ownership and accountability, operate with limited funding, and works to maintain effective internal and external communications under intense external scrutiny.

Cook, Stephen A.↗

XML technology planning database : lessons learned

A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

prototype databases↗

DSN human factors project

The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.

Chafin, R. L.↗