Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Development and Testing of an Integrated Acid Mine Drainage (AMD) Treatment and Rare Earth/Critical Mineral Plant

The overall objective of this project was to design, construct, and test a pilot-scale continuous process for efficiently treating acid mine drainage (AMD) while producing rare earth element/critical mineral (REE/CM) concentrates. The process technology evaluated in this project included two distinct operations: 1. an upstream pre-concentration unit that treats raw AMD to environmentally compliant discharge standards while capturing an REE/CM preconcentrate, and 2. a downstream REE purification process that further enriches the pre-concentrate while producing mixed or partially separated rare earth oxides (REOs). The project team members successfully completed all of the proposed goals of the project and advanced the technology readiness levels (TRL) of the constituent operations to TRL 7 for the upstream concentration unit (full-scale system demonstration) and TRL 6 for the downstream purification process (pilot-scale demonstration).

01 COAL, LIGNITE, AND PEAT↗

Recovery and Refining of Rare Earth Elements from Lignite Mine Wastes

The University of North Dakota (UND), in collaboration with a comprehensive team of technical, business and host-site partners, built on prior technology development to complete a front-end engineering and design (FEED) and business planning study to recover and refine rare earth elements (REE) and critical minerals (CM) from North Dakota (ND) lignite mine wastes. The end of project goal was to have an investment quality project and a committed team ready to commercialize the proposed technologies in a future construction and operations phase.

01 COAL, LIGNITE, AND PEAT↗

Kivalina Biomass Reactor

This report summarizes work performed under DOE Award DE-EE00010149 to support the reliable operation of a community-scale biochar reactor system in Kivalina, Alaska. The project focused on improving sanitation and waste management in a remote community by assessing the installed system, identifying spare parts, defining key performance indicators (KPIs), preparing operator and maintenance manuals, and developing mobile reporting tools for operational data and KPI tracking. The team also produced training materials and recorded videos to support operator onboarding and continuity. The project demonstrated progress in system readiness, documentation, and digital reporting, while also identifying challenges common to remote deployments, including travel constraints, upstream system failures, and local resource limitations. This work provides a practical framework for improving the operation, monitoring, and future replication of biomass reactor systems in remote communities.

09 BIOMASS FUELS↗

Synthetic Catalysts for CO2 Storage: Catalytic Improvement of Solvent Capture Systems

IMPACCT Project: LLNL is designing a process to pull CO2 out of the exhaust gas of coal-fired power plants so it can be transported, stored, or utilized elsewhere. Human lungs rely on an enzyme known as carbonic anhydrase to help separate CO2 from our blood and tissue as part of the normal breathing process. LLNL is designing a synthetic catalyst with the same function as this enzyme. The catalyst can be used to quickly capture CO2 from coal exhaust, just as the natural enzyme does in our lungs. LLNL is also developing a method of encapsulating chemical solvents in permeable microspheres that will greatly increase the speed of binding of CO2. The goal of the project is an industry-ready chemical vehicle that can withstand the harsh environments found in exhaust gas and enable new, simple process designs requiring less capital investment.

ARPA-E↗

Project Methods to Enhance Wellbore Cement Integrity with Microbially-Induced Calcite Precipitation (MICP) (Final Scientific/Technical Report)

The goal of this project was to develop improved methods for sealing compromised wellbore cement in leaking oil and gas wells, thereby reducing the risk of unwanted upward fluid migration. Novel methods for improving wellbore integrity, such as microbially induced calcite precipitation (MICP), can reduce leakage potential, improve the safety of fossil fuel extraction, improve the public perception of hydraulic fracturing, and promote environmentally-prudent unconventional oil and gas development. Microbes, with the urease enzyme, can catalyze the chemical reaction of urea hydrolysis to induce the precipitation of calcium carbonate which can be used as a cementitious material to seal leakage pathways. In this project, methods to promote robust bio-composite cementitious materials were designed and tested in the laboratory. Scale-up of those methods were tested in meso-scale reactor systems and in field applications. In this report, in Section One, we describe laboratory efforts to develop injection strategies to promote precipitation in wellbore analogs and determine the strength of the bio-composite cements as compared to fine cement. In Section Two, we describe the efforts to scale up the work and study the use of materials that can be used in field application, for example exploring the use of calcium chloride ice melt or urea fertilizer as source chemicals. In Section Three, the three field trials (methods and results) performed as part of the project are described and summarized. At the end of the report is a comprehensive summary and conclusion section which highlights the key findings of the project. The work performed during this project significantly advanced the technology readiness level (TRL) of the MICP wellbore sealing strategy.

02 PETROLEUM↗

Methods to Enhance Wellbore Cement Integrity with Microbially-Induced Calcite Precipitation (MICP) (Final Scientific/ Technical Report)

The goal of this project was to develop improved methods for sealing compromised wellbore cement in leaking oil and gas wells, thereby reducing the risk of unwanted upward fluid migration. Novel methods for improving wellbore integrity, such as microbially induced calcite precipitation (MICP), can reduce leakage potential, improve the safety of fossil fuel extraction, improve the public perception of hydraulic fracturing, and promote environmentally-prudent unconventional oil and gas development. Microbes, with the urease enzyme, can catalyze the chemical reaction of urea hydrolysis to induce the precipitation of calcium carbonate which can be used as a cementitious material to seal leakage pathways. In this project, methods to promote robust bio-composite cementitious materials were designed and tested in the laboratory. Scale-up of those methods were tested in meso-scale reactor systems and in field applications. In this report, in Section One, we describe laboratory efforts to develop injection strategies to promote precipitation in wellbore analogs and determine the strength of the bio-composite cements as compared to fine cement. In Section Two, we describe the efforts to scale up the work and study the use of materials that can be used in field application, for example exploring the use of calcium chloride ice melt or urea fertilizer as source chemicals. In Section Three, the three field trials (methods and results) performed as part of the project are described and summarized. At the end of the report is a comprehensive summary and conclusion section which highlights the key findings of the project. The work performed during this project significantly advanced the technology readiness level (TRL) of the MICP wellbore sealing strategy.

03 NATURAL GAS↗

A Microreactor Program Plan for The Department of Energy

The DOE Microreactor Program was established in FY 2019 to support research and development (R&D) of technologies related to the development, demonstration, and deployment of low-power, transportable reactors to provide power and heat for decentralized generation in civilian, industrial, and defense energy sectors. The program conducts both fundamental and applied R&D to de-risk technology performance and manufacturability readiness of microreactors. R&D projects and work packages are selected to support concept-neutral technology maturation. The intent is to ensure those concepts can be licensed and deployed by commercial entities to meet specific use case requirements. At the same time, the program will also support R&D specific to certain reactor technology groups (e.g., heat pipe reactors and gas-cooled reactors) to ensure relevancy and address the technology needs of commercial developers. The program will ensure coordination of work and activities across participating laboratories and universities, establish, and manage stakeholder interactions, and support program meetings. These stakeholders include, but are not limited to, industry developers, the U.S. Nuclear Regulatory Commission, the Department of Energy, policymakers, and end users. This document provides an overview of the overall Microreactor Program, including its vision, key technical objectives, and scope of the current and proposed R&D portfolio. It covers a 5-year rolling currently from Fiscal year 2025 through Fiscal year 2030. This document will be revised at least biennially to reflect changing priorities.

99 - GENERAL AND MISCELLANEOUS↗

Development of Technology Readiness Level (TRL) Metrics and Risk Measures

This is an internal project milestone report to document the CCSI Element 7 team's progress on developing Technology Readiness Level (TRL) metrics and risk measures. In this report, we provide a brief overview of the current technology readiness assessment research, document the development of technology readiness levels (TRLs) specific to carbon capture technologies, describe the risk measures and uncertainty quantification approaches used in our research, and conclude by discussing the next steps that the CCSI Task 7 team aims to accomplish.

carbon capture simulation↗

Pilot-Scale Demonstration of a Novel, Low-Cost Oxygen Supply Process and its Integration with Oxy-Fuel Coal-Fired Boilers

In order to achieve DOE targets for carbon dioxide capture, it is crucial not only to develop process options that will generate and provide oxygen to the power cycle in a cost-effective manner compared to the conventional oxygen supply methods based on cryogenic air separation technology, but also to identify effective integration options for these new technologies into the power cycle with carbon dioxide capture. The Linde/BOC developed Ceramic Autothermal Recovery (CAR) process remains an interesting candidate to address both of these issues by the transfer of oxygen from the air to a recycled CO{sub 2} rich flue-gas stream in a cyclic process utilizing the high temperature sorption properties of perovskites. Good progress was made on this technology in this project, but significant challenges remain to be addressed before CAR oxygen production technology is ready for commercial exploitation. Phase 1 of the project was completed by the end of September 2008. The two-bed 0.7 tons/day O2 CAR process development unit (PDU) was installed adjacent to WRI's pilot scale coal combustion test facility (CTF). Start-up and operating sequences for the PDU were developed and cyclic operation of the CAR process demonstrated. Controlled low concentration methane addition allowed the beds to be heated up to operational temperature (800-900 C) and then held there during cyclic operation of the 2-bed CAR process, in this way overcoming unavoidable heat losses from the beds during steady state operation. The performance of the PDU was optimized as much as possible, but equipment limitations prevented the system from fully achieving its target performance. Design of the flue gas recirculation system to integrate CAR PDU with the CTF and the system was completed and integrated tests successfully performed at the end of the period. A detailed techno-economic analysis was made of the CAR process for supplying the oxygen in oxy-fuel combustion retrofit option using AEP's 450 MW Conesville, Ohio plant and contrasted with the cryogenic air separation option (ASU). Design of a large scale CAR unit was completed to support this techno-economic assessment. Based on the finding that the overall cost potential of the CAR technology compared to cryogenic ASU is nominal at current performance levels and that the risks related to both material and process scale up are still significant, the team recommended not to proceed to Phase 2. CAR process economics continue to look attractive if the original and still 'realistic' target oxygen capacities could be realized in practice. In order to achieve this end, a new fundamental materials development program would be needed. With the effective oxygen capacities of the current CAR materials there is, however, insufficient economic incentive to use this commercially unproven technology in oxy-fuel power plant applications in place of conventional ASUs. In addition, it is now clear that before a larger scale pilot demonstration of the CAR technology is made, a better understanding of the impact of flue-gas impurities on the CAR materials and of thermal transients in the beds is required.

01 COAL, LIGNITE, AND PEAT↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

The concepts discussed in this paper 1) focus on using technical competencies and skills in making objective determinations regarding project complexity based on objective scoring criteria and 2) then using the complexity determinations to establish the level of rigor required in initiating, planning, executing, monitoring and controlling, and closing projects to maximize process efficiency. This paper presents a project complexity analysis methodology for defining the levels of project management process rigor a project team needs to employ to maximize project delivery efficiencies without compromising quality and performance. Methods for making project complexity determinations based on project lifecycle size, duration, organizational complexity, requirements, technology readiness, risk, and visibility are discussed. The paper correlates the levels of rigor needed by project management process groups given the determined level of project complexity. Next, the paper presents a graded approach to defining extent of team formation, planning documentation rigor, stakeholder communication rigor, requirements management rigor, acquisition planning, risk management, executing, and monitoring and controlling rigor dependent on project complexity determinations. Methods for integrating and aligning the project complexity determination methods into existing project management procedures and processes are also discussed as well as methods for training personnel in the use of the method and facilitating and monitoring effectiveness of implementation within an organization in which project delivery is a mission focus.

complexity, project, determination, management, tr↗

NorthernStar Zero Energy Ready Homes

This is a repository for all NorthernSTAR Zero Energy Ready certified homes. Amaris Homes Model Home - St. Paul, MN 55110 Description: Model home completed September 2013 The DOE Zero Energy Ready Home Case Study looks to study and eventually design zero net energy homes in cold weather climates. These zero net energy homes are referred to as challenge homes. For this challenge home, Amaris Homes is working with the DOE in St. Paul, Minnesota. The household located at MN 55110 acts as the Amaris Challenge Home Test. The resources include technical drawings including siding, roofing and Windows. Christian Builders Challenge Home - House Count: 1 - Otsego, MN 55374 Need pictures from builder; This home actually narrowly missed certification under DOE Net Zero Energy Ready Homes. Need building plans and project summary from builder. DESIGN AND STRUCTURE - Amaris Homes - House Count: 7 Stillwater, MN 55082; Vadnais Heights, MN 55127; Bloomington, MN 55437; Apple Valley, MN 55124; White Bear Lake, MN 55110; Mounds View, MN 55112; Midland, MI 48642; DOE Zero Energy Ready Homes

Array↗

Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Technology Solutions for New Homes Case Study: Multifamily Zero Energy Ready Home Analysis

AvalonBay Communities, which is a large multifamily developer, was developing a three-building complex in Elmsford, New York. The buildings were planned to be certified to the ENERGY STAR® Homes Version 3 program. This plan led to AvalonBay partnering with the Advanced Residential Integrated Solutions (ARIES) collaborative, which is a U.S. Department of Energy Building America team. ARIES worked with AvalonBay to redesign the project to comply with Zero Energy Ready Home (ZERH) criteria.

aries↗

California Wave Power Technologies Open Water Demonstration - Budget Period 1 reports

The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment while continuing to exceed DOE's target ACE threshold of 3m/M$. The outcomes of Budget Period 1 will be a detailed design of the scaled demonstration unit and bench testing of the critical hardware components.

16 TIDAL AND WAVE POWER↗

Oxy-Combustion Burner and Integrated Pollutant Removal Research and Development Test Facility

A high flame temperature oxy-combustion test facility consisting of a 5 MWe equivalent test boiler facility and 20 KWe equivalent IPR® was constructed at the Hammond, Indiana manufacturing site. The test facility was operated natural gas and coal fuels and parametric studies were performed to determine the optimal performance conditions and generated the necessary technical data required to demonstrate the technologies are viable for technical and economic scale-up. Flame temperatures between 4930-6120F were achieved with high flame temperature oxy-natural gas combustion depending on whether additional recirculated flue gases are added to balance the heat transfer. For high flame temperature oxy-coal combustion, flame temperatures in excess of 4500F were achieved and demonstrated to be consistent with computational fluid dynamic modeling of the burner system. The project demonstrated feasibility and effectiveness of the Jupiter Oxygen high flame temperature oxy-combustion process with Integrated Pollutant Removal process for CCS and CCUS. With these technologies total parasitic power requirements for both oxygen production and carbon capture currently are in the range of 20% of the gross power output. The Jupiter Oxygen high flame temperature oxy-combustion process has been demonstrated at a Technology Readiness Level of 6 and is ready for commencement of a demonstration project.

36 MATERIALS SCIENCE↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗

International Linear Collider-A Technical Progress Report

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗