Panel Session 99: Commercial LLW Management: Global Perspective

This panel focused on opportunities and challenges in providing commercial nuclear waste management services in a global context. The panelists commented on their approach to establishing new businesses, overcoming communication barriers acquiring / maintaining skills and capabilities and delivering commercial nuclear waste management projects in a range of regulatory and socio-economic environments. The panel discussion was followed by a Q and A session with audience participation. Panelist with presentations: BGE Technology (Thilo von Berlepsch)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shielded Casks Transfer by Funicular from the Surface to Disposal Level in Cigeo - 20007

Andra is completing the detailed engineering phase of Cigeo - the French HLW and ILW-LL DGR. A funicular system is dedicated to the transfer of the waste disposal containers from the surface to the underground infrastructures down the nuclear access ramp. This paper explains the rationale having led to the choice of a funicular and presents the advantages of this system. Main technical components and mechanical performance of the funicular system are then detailed. Lastly, the ongoing two stages qualification testing program managed by Andra (in order to reach a level 6 on the international Technology Readiness Level scale) is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress towards the POCO of UK Highly Active Storage Tanks - 20112

In the UK Highly Active (HA) waste is stored in stainless steel Highly Active Storage Tanks (HASTs) prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made towards the reduction in the volume of HA Liquor (HAL) stored in these HASTs and several tanks currently operate at heel levels. In recent years a strategy has been developed towards the Post Operational Clean Out (POCO) of the tanks and significant progress has been made in confirming this strategy since it was last presented at WMS [1]. For a variety of reasons changes to associated operational assumptions have also been made. This paper will highlight recent progress and changes associated with the strategy, including a description of some of the challenges that have been overcome and associated technical work undertaken. It will also detail current plans to POCO the HASTs, as quickly as possible, while minimising the risk and continuing to support other ongoing reprocessing and clean-up programmes as part of the overall UK clean-up mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Salt Repository Research and Development for Spent Nuclear Fuel and High-level Nuclear Waste in the United States - 20307

This paper summarizes the current US Department of Energy Office of Nuclear Energy's (DOE-NE) work towards developing and executing a research and development program that addresses both scientific and technical issues related to long-term disposal of spent nuclear fuel (SNF) and high-level waste (HLW) in a hypothetical bedded salt based geological repository. A primary goal of the program is to create a generic Geologic Disposal Safety Assessment (GDSA) Framework that can be used to help guide decisions on siting a possible future bedded salt repository. The generic GDSA work includes analysis of the impacts of heat generation caused by decay of short-lived radionuclides. We report progress in four primary areas. First, we discuss the development and recent modifications of a research and development road-map. Second, we briefly describe an experimental approach to better understand thermal processes in salt. Third, we highlight collaborations with the international research community that leverage salt-based repository science around the world. Finally, we discuss how our findings are being used to aid in the development of a generic safety assessment for a bedded salt repository containing SNF and HLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on the Status of Deep Borehole Disposal of High-Level Radioactive Waste in Germany - 20285

The phase-out of nuclear energy in Germany will take place in 2022. A site for final disposal of high level radioactive waste (HLRW) has not yet been found, but a site selection process was restarted by Act on the Search for and Selection of a Site for a Disposal Facility for High-Level Radioactive Waste (Site Selection Act - StandAG 2017). This act was based on a recommendation by a commission which also advised to follow up the development of deep borehole disposal (DBD) as an alternative option for final disposal of HLRW. This paper summarizes briefly the status of DBD in Germany and if this option should be pursued in Germany. Although there are some merits of DBD, it can only be a real option if research and development is supported. The technical equipment for boreholes of the required size will only be developed if there is funding and a feasibility test. Furthermore, any concept of DBD and technology must be detailed further, and some requirements of the act must be reconsidered. The paper concludes that despite the possible merits of DBD, the political and financial support for R and D will only be provided for the time being if DBD is pushed by interested parties. Alternatively, if the site selection procedure is not progressing well, then the alternative option of DBD may find greater interest in the future. However, its availability will be severely limited due to the missing development of detailed concepts and its demonstration of feasibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Summary Report - FY 23)

Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2023, extending from October 1, 2022, through September 30, 2023), approximately 9.37E+04 metric tons (1.03E+05 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2023, approximately 17.1 million metric tons (18.8 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 89.1% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Under Tank Inspection of Double-Shell Tanks - 20045

The Department of Energy (DOE) Office of River Protection (DOE-ORP) is responsible for management and cleanup of the tank farms located at the Hanford Site. Nuclear waste at Hanford is stored in 149 single-shell tanks (SSTs) and 27 double-shell tanks (DSTs). The vast majority of the liquid radioactive waste is stored in the DSTs. The 27 DSTs, located in six tank farms, were constructed from 1967 to 1986 and, compared to the SSTs, provide greatly improved protection from leakage and better accessibility for inspection. The DSTs and ancillary equipment are expected to exceed their design life before their waste is removed and sent to the Waste Treatment and Immobilization Plant. The DST Integrity Project (DSTIP) must ensure that the DST system can meet the River Protection Project mission goals. This paper provides a programmatic overview of the DSTIP with a focus on development of under-tank inspection technologies. Currently, two categories of nondestructive examination (NDE) techniques for DSTs are implemented on the Hanford site: (1) surface (SNDE) and (2) volumetric (VNDE). Further discussion on current inspection techniques is provided in this paper. The technology development approach for advanced VNDE techniques will also be generally discussed as a precursor for another more detailed WM2020 paper and presentation by PNNL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Origins and Contents of the Waste Specifications: the Example of the French LLW-SL Disposal Facility - 20016

The waste specifications published by Andra for its surface disposal facilities for Low and Intermediate, Short-Lived waste (CSA) are primarily defined to ensure the safe disposal of waste, both in the short and long term, spanning from disposal operations to hundreds of years after closure, when the man-made safety barriers have long disappeared into dust. The paper presents the methodology used at Andra to derive the CSA waste specifications, also known as Waste Acceptance Criteria, their contents, and the process in place to verify compliance of the waste with the specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

White Paper on Lithium-Ion Battery Safety for use in Safety Planning at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is an underground facility designed to safely dispose of radioactive waste. The WIPP uses many heavy vehicles to transport materials and equipment underground. Most of these vehicles are powered by traditional internal combustion engines (ICE) with diesel fuel. Recently, electric vehicles (EVs) powered with batteries have been used at the WIPP. EVs have very low operational and maintenance costs, not considering battery replacements, and they have zero emissions during operation. This absence of emissions makes them ideal for underground facilities with limited ventilation. Even if a facility has robust ventilation normally, ventilation systems can break down leading to restrictions in ICE powered operations. Figure 1 shows a rendering of the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quest for Continuous Design and Safety Optimization: A Look at Cires, the French Very Low Level Waste Disposal - 20010

Cires, the French repository for very low-level waste (VLLW) managed by Andra, has a fifteen-year history of enhancing design and disposal operations, responding to producers' needs by optimizing existing facilities and providing new facilities as needed. Its flexibility allows the facility to adapt to changes in waste delivery flows, to dispose of larger waste volumes without using more space, to integrate new concepts and even envisage disposal capacity extension. The article traces the ever evolving history of technical and operational optimization of this unique disposal facility situated in Eastern France. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray Phase 2 (Tasks 9-20)

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Solutions (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗