Search NASA⌕ Search

SEARCH · Search NASA

Results for “RAP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Representative Agricultural Pathways and Scenarios for Regional Integrated Assessment of Climate Change Impacts, Vulnerability, and Adaptation: Chapter - 5

The global change research community has recognized that new pathway and scenario concepts are needed to implement impact and vulnerability assessment where precise prediction is not possible, and also that these scenarios need to be logically consistent across local, regional, and global scales. For global climate models, representative concentration pathways (RCPs) have been developed that provide a range of time-series of atmospheric greenhouse-gas concentrations into the future. For impact and vulnerability assessment, new socio-economic pathway and scenario concepts have also been developed, with leadership from the Integrated Assessment Modeling Consortium (IAMC).This chapter presents concepts and methods for development of regional representative agricultural pathways (RAOs) and scenarios that can be used for agricultural model intercomparison, improvement, and impact assessment in a manner consistent with the new global pathways and scenarios. The development of agriculture-specific pathways and scenarios is motivated by the need for a protocol-based approach to climate impact, vulnerability, and adaptation assessment. Until now, the various global and regional models used for agricultural-impact assessment have been implemented with individualized scenarios using various data and model structures, often without transparent documentation, public availability, and consistency across disciplines. These practices have reduced the credibility of assessments, and also hampered the advancement of the science through model intercomparison, improvement, and synthesis of model results across studies. The recognition of the need for better coordination among the agricultural modeling community, including the development of standard reference scenarios with adequate agriculture-specific detail led to the creation of the Agricultural Model Intercomparison and Improvement Project (AgMIP) in 2010. The development of RAPs is one of the cross-cutting themes in AgMIP's work plan, and has been the subject of ongoing work by AgMIP since its creation.

agriculture↗

Assimilation of NUCAPS Retrieved Profiles in GSI for Unique Forecasting Applications

Hyperspectral IR profiles can be assimilated in GSI as a separate observation other than radiosondes with only changes to tables in the fix directory. Assimilation of profiles does produce changes to analysis fields and evidenced by: Innovations larger than +/-2.0 K are present and represent where individual profiles impact the final temperature analysis.The updated temperature analysis is colder behind the cold front and warmer in the warm sector. The updated moisture analysis is modified more in the low levels and tends to be drier than the original model background Analysis of model output shows: Differences relative to 13-km RAP analyses are smaller when profiles are assimilated with NUCAPS errors. CAPE is under-forecasted when assimilating NUCAPS profiles, which could be problematic for severe weather forecasting Refining the assimilation technique to incorporate an error covariance matrix and creating a separate GSI module to assimilate satellite profiles may improve results.

data assimilation↗

Perspectives on Climate Effects on Agriculture: The International Efforts of AgMIP in Sub-Saharan Africa

Agriculture in Sub-Saharan Africa (SSA) is experiencing climate change-related effects that call for integrated regional assessments, yet capacity for these assessments has been low. The Agricultural Model Intercomparison and Improvement Project (AgMIP) is advancing research on integrated regional assessments of climate change that include climate, crop, and economic modeling and analysis. Through AgMIP, regional integrated assessments are increasingly gaining momentum in SSA, and multi-institutional regional research teams (RRTs) centered in East, West, and Southern· Africa are generating new information on climate change impacts and adaptation in selected agricultural systems. The research in Africa is organized into four RRTs and a coordination team. Each of the RRTs in SSA is composed of scientists from the Consultative Group of International Agricultural Research (CGIAR) institutions, National Agriculture Research institutes (NARs), and universities consisting of experts in crop and economic modeling, climate, and information technology. Stakeholder involvement to inform specific agricultural systems to be evaluated, key outputs, and the representative agricultural pathways (RAPs), is undertaken at two levels: regional and national, in order to contribute to decision making at these levels. Capacity building for integrated assessment (lA) is a key component that is undertaken continuously through interaction with experts in regional and SSA-wide workshops, and through joint creation of tools. Many students and research affiliates have been identified and entrained as part of capacity building in IA. Bi-monthly updates on scholarly publications in climate change in Africa also serve as a vehicle for knowledge-sharing. With 60 scientists already trained and actively engaged in IA and over 80 getting monthly briefs on the latest information on climate change, a climate-informed community of experts is gradually taking shape in SSA. (See Part 2, Appendices 3-5 in this volume for AgMIP Regional Workshop reports.)

Kihara, Job↗

Wind Information Uplink to Aircraft Performing Interval Management Operations

Interval Management (IM) is an ADS-B-enabled suite of applications that use ground and flight deck capabilities and procedures designed to support the relative spacing of aircraft (Barmore et al., 2004, Murdoch et al. 2009, Barmore 2009, Swieringa et al. 2011; Weitz et al. 2012). Relative spacing refers to managing the position of one aircraft to a time or distance relative to another aircraft, as opposed to a static reference point such as a point over the ground or clock time. This results in improved inter-aircraft spacing precision and is expected to allow aircraft to be spaced closer to the applicable separation standard than current operations. Consequently, if the reduced spacing is used in scheduling, IM can reduce the time interval between the first and last aircraft in an overall arrival flow, resulting in increased throughput. Because IM relies on speed changes to achieve precise spacing, it can reduce costly, low-altitude, vectoring, which increases both efficiency and throughput in capacity-constrained airspace without negatively impacting controller workload and task complexity. This is expected to increase overall system efficiency. The Flight Deck Interval Management (FIM) equipment provides speeds to the flight crew that will deliver them to the achieve-by point at the controller-specified time, i.e., assigned spacing goal, after the target aircraft crosses the achieve-by point (Figure 1.1). Since the IM and target aircraft may not be on the same arrival procedure, the FIM equipment predicts the estimated times of arrival (ETA) for both the IM and target aircraft to the achieve-by point. This involves generating an approximate four-dimensional trajectory for each aircraft. The accuracy of the wind data used to generate those trajectories is critical to the success of the IM operation. There are two main forms of uncertainty in the wind information used by the FIM equipment. The first is the accuracy of the forecast modeling done by the weather provider. This is generally a global environmental prediction obtained from a weather model such as the Rapid Refresh (RAP) from the National Centers for Environmental Prediction (NCEP). The weather forecast data will have errors relative to the actual, or truth, winds that the aircraft will encounter. The second source of uncertainty is that only a small subset of the forecast data can be uplinked to the aircraft for use by the FIM equipment. This results in loss of additional information. The Federal Aviation Administration (FAA) and RTCA are currently developing standards for the communication of wind and atmospheric data to the aircraft for use in NextGen operations. This study examines the impact of various wind forecast sampling methods on IM performance metrics to inform the standards development.

Ahmad, Nashat N.↗

Satellite Maps and Relevant Compositional Properties of PM2.5 in Difficult Winter Situations and Comparisons to DISCOVER-AQ Airborne Sampling

Mediterranean-climate regions like California's San Joaquin Valley are subject to severe wintertime particulate pollution affecting public health. We present maps of episodes and particulate diagnostics to aid diagnosis and amelioration. For abatement at sources, we require an understanding of sources and transport. Remote sensing should be of aid, but radiance-to-particle relationships are far different from methods which have been of use in the Eastern USA, Northern and Central Europe. Here are the problems: (a) Thin if very polluted mixed layers (MLs) yield optical depths, AOD, near the detection level, (b) bright and quite variegated surfaces (c) Unusual particle composition (e.g., predominance of NH4NO3 and fireplace buning aerosol), which complicate the relationship of AOD to PM2.5. Specialized analysis of MODIS-Aqua data to obtain AOD using the multi-angle (MAIAC) technique employed by Lyapustin and Wang. Meteorological analyses like NOAA's Rapid Analysis Product (RAP, or newer products like HRRR), which are formulated to remain close to observations (e.g. of water), provide useful ML information corroborated by DISCOVER-AQ in-situ and lidar observations. The many PM2.5 measurements allow a calibration of these products and thus maps of aerosol on many successive aerosol buildups. These calibrations also allow insight into compositional information relevant to MODIS retrievals, the product of aerosol density and specific scattering. We have found that the rich in-situ, lidar, and sun-photometer data sets of NASA'S DISCOVER-AQ data set (2013) of great aid. We will highlight the most interesting of many intercomparisons possible with this rich data set. We conclude with a description of new work to extend these insights to similar regions, e.g. the Imperial Valley of California, the Po Valley and maritime Southern Europe, and the litoral regions of Israel.

aerosols↗

Evaluation of Temporal Spacing Errors Associated with Interval Management Algorithms

This paper seeks to characterize the temporal spacing errors resulting from the use of Interval Management (IM) algorithms. The focus of the current paper is IM concepts and algorithms that realize a specified temporal spacing between a Target aircraft and an Ownship aircraft at the runway threshold. The paper presents an IM algorithm consisting of the following four modules: (i) Target-Landing-Time Estimation Module, (ii) Ownship-Landing-Time Estimation Module, (iii) Ownship Speed Command Computation Module, and (iv) Ownship Thrust Command Computation Module. The overall guidance module is evaluated on a simulation that models aircraft point-mass dynamics, bank-angle auto-pilot dynamics, pitch-axis auto-pilot dynamics, and engine lag dynamics. The simulation environment also consists of actual atmospheric forecasts and realistic spatio-temporally correlated wind uncertainty models. Results obtained from single case simulation as well as Monte-Carlo simulations are presented in the paper. The modeled scenario consisted of an A320 Target equipped with “Lateral Navigation”/“Vertical Navigation” (LNAV/VNAV) capabilities followed by an A320 Ownship equipped with the IM algorithm. Both aircraft fly the BIGSUR route to SFO airport using a RAP-13 1-hr wind forecast. 500 Monte-Carlo simulations were conducted with realistic wind uncertainty models. The IM algorithm for this case is seen to have a 90% probability landing time error range of 5.9 seconds, compared to the no-IM solution, which has a 90% probability landing time error range of 33.4 seconds.

Bai, Xiaoli↗

Coordinating AgMIP Data and Models Across Global and Regional Scales for 1.5°C and 2.0°C Assessments

The Agricultural Model Intercomparison and Improvement Project (AgMIP) has developed novel methods for Coordinated Global and Regional Assessments (CGRA) of agriculture and food security in a changing world. The present study aims to perform a proof of concept of the CGRA to demonstrate advantages and challenges of the proposed framework. This effort responds to the request by the UN Framework Convention on Climate Change (UNFCCC) for the implications of limiting global temperature increases to 1.5°C and 2.0°C above pre-industrial conditions. The protocols for the 1.5°C/2.0°C assessment establish explicit and testable linkages across disciplines and scales, connecting outputs and inputs from the Shared Socio-economic Pathways (SSPs), Representative Agricultural Pathways (RAPs), Half a degree Additional warming, Prognosis and Projected Impacts (HAPPI) and Coupled Model Intercomparison Project Phase 5 (CMIP5) ensemble scenarios, global gridded crop models, global agricultural economics models, site-based crop models and within-country regional economics models. The CGRA consistently links disciplines, models and scales in order to track the complex chain of climate impacts and identify key vulnerabilities, feedbacks and uncertainties in managing future risk. CGRA proof-of-concept results show that, at the global scale, there are mixed areas of positive and negative simulated wheat and maize yield changes, with declines in some bread basket regions, at both 1.5°C and 2.0°C. Declines are especially evident in simulations that do not take into account direct CO2 effects on crops. These projected global yield changes mostly resulted in increases in prices and areas of wheat and maize in two global economics models. Regional simulations for 1.5°C and 2.0°C using site-based crop models had mixed results depending on the region and the crop. In conjunction with price changes from the global economics models, productivity declines in the Punjab, Pakistan, resulted in an increase in vulnerable households and the poverty rate. This article is part of the theme issue ‘The Paris Agreement: understanding the physical and social challenges for a warming world of 1.5°C above pre-industrial levels’.

interdisciplinary↗

NASA's Habitation Development Status: Current Concepts and ISRU Opportunities

Introduction: The National Aeronautics and Space Administration (NASA) is embarking on a bold journey to return humankind to the Moon and onward to Mars with innovative commercial, international, and academic partnerships [1]. Under the Artemis series of missions, NASA seeks to establish sustained human exploration of deep space through an objectives-based approach [2]. This approach drives the identification of needed system functionality and the current and future capabilities which will eventually allow humanity to sustainably live beyond Earth. Providing evolvable and scalable habitation is a cornerstone function that calls for the collection and integration of current, developmental, and future technologies that can meet near-term exploration needs while growing into long-term sustained presence. NASA is advancing in-space habitation through its Next Space Technologies for Exploration Partnerships (NextSTEP) model while designing lunar, Mars transit, and Mars surface habitat government reference concepts for Artemis missions. These efforts have unveiled possible near-term opportunities for the in-space resource utilization community if human habitation is considered a future customer of space resources. NextSTEP Habitation Development: NASA is closely working with commercial partners under its NextSTEP Appendix A model to advance habitation systems in the arena of inflatable and composite habitation structures. Such efforts promise efficiencies in volumetric packaging and overall spacecraft mass respectively. Recent testing by commercial partners have helped to quantify possible failure mechanisms for inflatable structures while advancing their technology towards eventual flight certification. The advancement of such Class II habitation structures, in which the habitat is only fully deployed once in-space or on a planetary surface [3], is critical to providing increased habitable volume for long-duration missions with no additional mass penalties. The progression of such technology is infused into NASA’s government reference concepts for notional deep space habitation concepts. Current Government Reference Concepts: To best inform the formulation of future collaborative solicitations, NASA employs the practice of internally developing reference concepts for future exploration elements. These concepts aid in identifying the functions and capabilities needed to complete NASA missions as well as feasible solutions within the timeframe needed. Government reference concepts for a lunar Surface Habitat, Mars Transit Habitat, and Mars Sur-face Habitat are continuously being developed and updated to better guide the Agency’s overall exploration architecture. Lunar Surface Habitat. As NASA returns to the Moon, it is evaluating possible lunar surface habitation concepts. The Surface Habitat (SH) reference concept entails a hybrid metallic-inflatable structure capable of initially housing two crew for surface stays of up to 30 days in duration [4]. While initial missions may span ~7 days in duration, consideration is being given to expanding SH’s capability to support a crew of four for up to 60 days over its 15-year design life [5]. Functionally, the SH serves as a ‘hub’ for all Artemis crewed surface operations, providing internal volume for maintenance, medical, logistics, science utilization, and extravehicular activity (EVA) support in addition to core habitation functionality such as environmental control and life support (ECLS) and power generation and distribution among many others. Additionally, NASA has entered a study agreement with the Italian Space Agency (Agenzia Spaziale Italiana – ASI) to investigation a possible Multi-Purpose Habitat (MPH) as an additional or augmenting habit-able element for the lunar surface [6]. Mars Transit Habitat. NASA’s current architectural concept for initial human missions to Mars entails the utilization of a transit habitat (TH) to transport a four-person crew to and from Mars orbit, departing from and returning to a lunar near-rectilinear halo orbit (NRHO), over the course of a ~1,200-day mission [5]. While holding a similar 15-year design lifetime, TH will also support a series of analog mission activities in NRHO to gradually test the systems and interaction with lunar surface elements, some of which may be adapted for Mars surface exploration. Holding similar functional capabilities as SH, TH is sized to support much longer durations in space and greater logistical independence. Mars Surface Habitat. NASA is still exploring the concept of operations for initial crewed missions to Mars. As such, the Mars Surface Habitat (MSH) concept is still in its infancy as options for mobile, pressurized habitation and stationary habitats are being explored. It is expected MSH will leverage heavily from the lunar SH and possible lunar pressurized rover, however the very different Martian environment will likely necessitate modifications. ISRU Opportunities: Despite the advancements under NASA’s NextSTEP habitation work and continually optimized reference concepts, NASA is facing near-term mass and power challenges that may create opportunities to the ISRU community by providing yet another possible customer for space resources. While NASA desires to use regenerative ECLS systems (ECLSS) for all habitation concepts, their operation comes with initial mass penalties and maintenance overheads when compared to simpler open-loop architectures. Because of this, NASA is currently pro-posing an open-loop, consumables-based architecture for its surface habitats to achieve initial launch and delivery lander mass targets while scarring for the in-corporation of regenerative ECLSS to meet longer mission durations and sustained presence. With such an architecture, oxygen and potable water are needed consumables, which initial ISRU systems may be able to provide in a pilot capacity. Although the TH is expecting to utilize regenerative ECLSS, advancements in lunar surface-based ISRU and possible re-supply of spacecraft in lunar or Mars orbit could significantly reduce the logistical need for ECLSS related spares on TH and possibly allow a similar open-loop and consumables-based architecture. Table 1 Notional ECLSS consumables per mission use for SH and TH [5]. SH (28-day) Open Loop: Water (kg) 288 | Oxygen (kg) 30 TH (1110-day) Closed-Loop: Water (kg) 182 | Oxygen (kg) 123 In addition to ECLSS mass concerns, the SH is facing challenges with energy storage to support operations over periods of darkness exceeding 100 hours. Both battery and fuel cell-based power architectures are being traded, opening options for external power generation and energy storage. One possibility is ISRU-produced H2 and O2 feeding external primary fuel cell systems which could supplement habitation power generation while reducing initial mass and volume until much more powerful fission power systems might be deployed. Conclusion: Significant advancements are being made in evolvable habitation concepts that span from near-term technologies, such as inflatable structures under NextSTEP, to potentially revolutionary capabilities like the lunar surface construction as funded through the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project [7]. As NASA investigates both heritage capabilities and rap-idly advancing, disruptive technologies, there are likely many near-term opportunities for initial ISRU capabilities to significantly aid human habitation and increase self-sufficiency beyond Earth.

habitation↗

NASA's Habitation Development Status: Current Concepts and ISRU Opportunities

Introduction: The National Aeronautics and Space Administration (NASA) is embarking on a bold journey to return humankind to the Moon and onward to Mars with innovative commercial, international, and academic partnerships. Under the Artemis series of missions, NASA seeks to establish sustained human exploration of deep space through an objectives-based approach. This approach drives the identification of needed system functionality and the current and future capabilities which will eventually allow humanity to sustainably live beyond Earth. Providing evolvable and scalable habitation is a cornerstone function that calls for the collection and integration of current, developmental, and future technologies that can meet near-term exploration needs while growing into long-term sustained presence. NASA is advancing in-space habitation through its Next Space Technologies for Exploration Partnerships (NextSTEP) model while designing lunar, Mars transit, and Mars surface habitat government reference concepts for Artemis missions. These efforts have unveiled possible near-term opportunities for the in-space resource utilization community if human habitation is considered a future customer of space resources. NextSTEP Habitation Development: NASA is closely working with commercial partners under its NextSTEP Appendix A model to advance habitation systems in the arena of inflatable and composite habitation structures. Such efforts promise efficiencies in volumetric packaging and overall spacecraft mass respectively. Recent testing by commercial partners have helped to quantify possible failure mechanisms for inflatable structures while advancing their technology towards eventual flight certification. The advancement of such Class II habitation structures, in which the habitat is only fully deployed once in-space or on a planetary surface, is critical to providing increased habitable volume for long-duration missions with no additional mass penalties. The progression of such technology is infused into NASA’s government reference concepts for notional deep space habitation concepts. Current Government Reference Concepts: To best inform the formulation of future collaborative solicitations, NASA employs the practice of internally developing reference concepts for future exploration elements. These concepts aid in identifying the functions and capabilities needed to complete NASA missions as well as feasible solutions within the timeframe needed. Government reference concepts for a lunar Surface Habitat, Mars Transit Habitat, and Mars Sur-face Habitat are continuously being developed and updated to better guide the Agency’s overall exploration architecture. Lunar Surface Habitat. As NASA returns to the Moon, it is evaluating possible lunar surface habitation concepts. The Surface Habitat (SH) reference concept entails a hybrid metallic-inflatable structure capable of initially housing two crew for surface stays of up to 30 days in duration. While initial missions may span ~7 days in duration, consideration is being given to expanding SH’s capability to support a crew of four for up to 60 days over its 15-year design life. Functionally, the SH serves as a ‘hub’ for all Artemis crewed surface operations, providing internal volume for maintenance, medical, logistics, science utilization, and extravehicular activity (EVA) support in addition to core habitation functionality such as environmental control and life support (ECLS) and power generation and distribution among many others. Additionally, NASA has entered a study agreement with the Italian Space Agency (Agenzia Spaziale Italiana – ASI) to investigation a possible Multi-Purpose Habitat (MPH) as an additional or augmenting habit-able element for the lunar surface. Mars Transit Habitat. NASA’s current architectural concept for initial human missions to Mars entails the utilization of a transit habitat (TH) to transport a four-person crew to and from Mars orbit, departing from and returning to a lunar near-rectilinear halo orbit (NRHO), over the course of a ~1,200-day mission. While holding a similar 15-year design lifetime, TH will also support a series of analog mission activities in NRHO to gradually test the systems and interaction with lunar surface elements, some of which may be adapted for Mars surface exploration. Holding similar functional capabilities as SH, TH is sized to support much longer durations in space and greater logistical independence. Mars Surface Habitat. NASA is still exploring the concept of operations for initial crewed missions to Mars. As such, the Mars Surface Habitat (MSH) concept is still in its infancy as options for mobile, pressurized habitation and stationary habitats are being explored. It is expected MSH will leverage heavily from the lunar SH and possible lunar pressurized rover, however the very different Martian environment will likely necessitate modifications. ISRU Opportunities: Despite the advancements under NASA’s NextSTEP habitation work and continually optimized reference concepts, NASA is facing near-term mass and power challenges that may create opportunities to the ISRU community by providing yet another possible customer for space resources. While NASA desires to use regenerative ECLS systems (ECLSS) for all habitation concepts, their operation comes with initial mass penalties and maintenance overheads when compared to simpler open-loop architectures. Because of this, NASA is currently pro-posing an open-loop, consumables-based architecture for its surface habitats to achieve initial launch and delivery lander mass targets while scarring for the in-corporation of regenerative ECLSS to meet longer mission durations and sustained presence. With such an architecture, oxygen and potable water are needed consumables, which initial ISRU systems may be able to provide in a pilot capacity. Although the TH is expecting to utilize regenerative ECLSS, advancements in lunar surface-based ISRU and possible re-supply of spacecraft in lunar or Mars orbit could significantly reduce the logistical need for ECLSS related spares on TH and possibly allow a similar open-loop and consumables-based architecture. In addition to ECLSS mass concerns, the SH is facing challenges with energy storage to support operations over periods of darkness exceeding 100 hours. Both battery and fuel cell-based power architectures are being traded, opening options for external power generation and energy storage. One possibility is ISRU-produced H2 and O2 feeding external primary fuel cell systems which could supplement habitation power generation while reducing initial mass and volume until much more powerful fission power systems might be deployed. Conclusion: Significant advancements are being made in evolvable habitation concepts that span from near-term technologies, such as inflatable structures under NextSTEP, to potentially revolutionary capabilities like the lunar surface construction as funded through the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project. As NASA investigates both heritage capabilities and rap-idly advancing, disruptive technologies, there are likely many near-term opportunities for initial ISRU capabilities to significantly aid human habitation and increase self-sufficiency beyond Earth.

habitation↗

LINACS FOR FUTURE MUON FACILITIES

Future Muon Colliders (MC) and Neutrino Factories (NF) based on muon storage rings will require innovative linacs to: produce the muons, cool them, compress longi-tudinally and ‘shape’ them into a beam and finally to rap-idly accelerate them to multi-GeV (NF) and TeV (MC) energies. Each of these four linac applications has new requirements and opportunities that follow from the na-ture of the muon in that it has a short lifetime (τ = 2.2 μsec) in its own rest frame, it is produced in a tertiary process into a large emittance, and its electron, photon, and neutrino decay products can be more than an annoy-ance. As an example, for optimum performance, the linac repetition rates should scale inversely with the laboratory lifetime of the muon in its storage ring, something as high as 1 kHz for a 40 GeV Neutrino Factory or as low as 20 Hz for a 5 TeV Muon Collider. A superconducting 8 GeV Linac capable of CW operation is being studied as a ver-satile option for muon production [1] for colliders, facto-ries, and muon beams for diverse purposes. A linac filled with high pressure hydrogen gas and imbedded in strong magnetic fields has been proposed to rapidly cool muon beams [2]. Recirculating Linear Accelerators (RLA) are possible because muons do not generate significant syn-chrotron radiation even at extremely high energy and in strong magnetic fields. We will describe the present status of linacs for muon applications; in particular the longitu-dinal bunch compression in a single pass linac and multi-pass acceleration in the RLA, especially the optics and technical requirements for RLA designs, using supercon-ducting RF cavities capable of simultaneous acceleration of both μ+ and μ- species, with pulsed linac quadrupoles to allow the maximum number of passes. The design will include the optics for the multi-pass linac and droplet-shaped return arcs.

43 PARTICLE ACCELERATORS↗

NARAC Modeling During the Response to the Fukushima Dai-ichi Nuclear Power Plant Emergency

This paper summarizes the activities of the National Atmospheric Release Advisory Center (NARAC) during the Fukushima Dai-ichi nuclear power plant crisis. NARAC provided a wide range of products and analyses as part of its support including: (1) Daily Japanese weather forecasts and hypothetical release (generic source term) dispersion predictions to provide situational awareness and inform planning for U.S. measurement data collection and field operations; (2) Estimates of potential dose in Japan for hypothetical scenarios developed by the Nuclear Regulatory Commission (NRC) to inform federal government considerations of possible actions that might be needed to protect U.S. citizens in Japan; (3) Estimates of possible plume arrival times and dose for U.S. locations; and (4) Plume model refinement and source estimation based on meteorological analyses and available field data. The Department of Energy/National Nuclear Security Administration (DOE/NNSA) deployed personnel to Japan and stood up 'home team' assets across the DOE complex to aid in assessing the consequences of the releases from the Fukushima Dai-ichi Nuclear Power Plant. The DOE Nuclear Incident Team (NIT) coordinated response activities, while DOE personnel provided predictive modeling, air and ground monitoring, sample collection, laboratory analysis, and data assessment and interpretation. DOE deployed the Aerial Measuring System (AMS), Radiological Assistance Program (RAP) personnel, and the Consequence Management Response Team (CMRT) to Japan. DOE/NNSA home team assets included the Consequence Management Home Team (CMHT); National Atmospheric Release Advisory Center (NARAC); Radiation Emergency Assistance Center/Training Site (REAC/TS); and Radiological Triage. NARAC was activated by the DOE/NNSA on March 11, shortly after the Tohoku earthquake and tsunami occurred. The center remained on active operations through late May when DOE ended its deployment to Japan. Over 32 NARAC staff members, supplemented by other LLNL scientists, invested over 5000 person-hours of time and generated over 300 analyses and predictions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Port Radium Canada's Original Radium/Uranium Mine, The Complete Story of Canada's Historic Radium/Uranium Mine, 1932 to 2012 - 13159

This paper provides the life story of Canada's original radium/uranium mine. In addition to the history of operations, it discusses the unique and successful approach used to identify the key issues and concerns associated with the former radium, uranium and silver mining property and the activities undertaken to define the remedial actions and subsequent remedial plan. The Port Radium Mine site, situated approximately 275 km north of Yellowknife on the east shore of Great Bear Lake, Northwest Territories, was discovered in 1930 and underground mining began in 1932. The mine operated almost continuously from 1932 to 1982, initially for recovery of radium, then uranium and finally, for recovery of silver. Tailings production totaled an estimated 900,000 tons and 800,000 tons from uranium and silver processing operations respectively. In the early days of mining, Port Radium miners were exposed to radon and associated decay product levels (in Working Level Months of exposure - WLM) hundreds of times greater than modern standards. The experience of the Port Radium miners provides important contribution to understanding the risks from radon. While the uranium mine was originally decommissioned in the early 1960's, to the standards of the day, the community of Deline (formerly Fort Franklin) had concerns about residual contamination at the mine site and the potential effects arising from use of traditional lands. The Deline people were also concerned about the possible risks to Deline Dene arising from their work as ore carriers. In the late 1990's, the community of Deline brought these concerns to national attention and consequently, the Government of Canada and the community of Deline agreed to move forward in a collaborative manner to address these concerns. The approach agreed to was to establish the Canada-Deline Uranium Table (CDUT) to provide a joint process by which the people of Deline could have their concerns expressed and addressed. A great deal of work was done through the CDUT, including efforts to assess site environment and safety issues in the context of modern reclamation standards. In addition to the environmental and remediation studies, an assessment of historic exposures of Deline ore carriers to radiation and a follow-up epidemiological feasibility study were performed. SENES Consultants Limited (SENES) carried out the dose reconstruction for the Port Radium miners in the 1990's, was the environmental consultant to the CDUT from 2000 to 2005, developed the Remedial Action Plan (RAP), engineering plans and specifications for decommissioning the Port Radium mine and vicinity sites in 2005/6, supervised the remedial works in 2007 and carried out the long term post closure monitoring from 2008 to 2012. Our firsthand experience from working cooperatively with the CDUT provides insights into effective decommissioning of historic contaminated sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Zeolite Nonwoven for the Adsorption of Radioactive Cesium - 13288

The zeolite nonwoven fabric produced by TDS (Totally Dry System) process has some advantages such as the control of zeolite content, flexibility, strength and water-resistant property depending on the purpose. Hence the zeolite nonwoven fabric is expected for the application in various fields of the decontamination of Cs-contaminated water. In this study, Cs adsorption properties of zeolite nonwoven fabrics were examined by batch experiments, and the radiation stability, thermal stability and chemical durability were evaluated. As for batch adsorption properties, relatively large uptake rate of Cs{sup +} was obtained; the uptake equilibrium attained within 20 min and the uptake (%) was above 95%. The differences in zeolite content had no effects on the Cs{sup +} uptake (%). The uptake (%) of Cs{sup +} in seawater was slightly lowered compared to that in the presence of HNO{sub 3}. The uptake (%) of Cs{sup +} in seawater was estimated to be above 90% after 2 h-shaking, indicating the considerable enhancement of uptake rate compared to the conventional granular zeolites. The uptake (%) of Cs{sup +} for the zeolite high content type was estimated to be above 99% by using {sup 137}Cs tracer. As for the comparison of sealing treatment, the uptake (%) for the zeolite sheet treated with edge sealing was larger than that with rapping treatment. The uptake (%) for the zeolite sheet (zeolite high content type) was estimated to be about 95%, which is independent of sealing treatment and NaOH concentration. As for the stability, the surface morphology and the structure of zeolite sheet were not altered by the treatment with acid and alkaline solutions under the experimental conditions. The zeolite sheets were also stable after {sup 60}Co-γ ray irradiation up to 7.01x10{sup 6} R. On the other hand, color change for both fiber and zeolite and the shrinkage of the fiber were observed after heat treatment at 150 deg. C for 2 h. Thus the considerable enhancement of adsorption properties was observed by using zeolite nonwoven fabrics compared to the conventional granular zeolites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Indoor Radon Measurements from Residential Buildings with Basements in a Community with Potential LLRW Contamination - 19566

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities-Port Hope and Clarington. The PHAI (see reference for internet address) is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. Canadian Nuclear Laboratories (CNL) is implementing the PHAI on behalf of Atomic Energy of Canada Limited, a Federal Crown Corporation. An initial characterization and remediation program in the urban area of Port Hope was conducted from 1976 to 1981. The waste is the result of radium and uranium processing in Port Hope by the former Federal Crown Corporation Eldorado Nuclear Limited between 1933 and 1988. One contaminant of concern in the LLRW is radium-226 (Ra-226) which may lead to elevated indoor levels of radon-222 (Rn-222) indoors. As part of CNL's implementation of the PHAI, Arcadis is conducting the Port Hope Project Property Radiological Survey of approximately 4,800 small-scale sites to identify 1) properties that have not been affected by historic operations and 2) properties that have residual historic low-level radioactive waste impacts requiring remediation either for soils or for interior contamination or both. Over the last six years, a component of the Small Scale Sites (SSS) characterization surveys have measured radon concentrations in essentially all buildings in Port Hope using alpha-track detectors. All properties had subsurface characterization including analytical characterization and lithology following the radon measurement reporting to measure if soil concentrations exceeded the PHAI Cleanup Criteria (PHAI CC) for Ra-226 of 0.29 Bq/g. Buildings with radon gas exceeding a trigger level of 200 becquerels per cubic meter (Bq/m{sup 3}) or those with ventilation systems required investigation of soil concentrations around the perimeter of the building. Ra-226 concentrations above the background level of 0.05 Bq/g due to LLRW sources were forwarded to create remedial action plans (RAPs) to remove the contamination near the building. The SSS surveys provide a substantive data set on the approximately 3,000 properties measured to date with interior Rn-222 gas measurements and descriptions of the physical characteristics of the buildings, the lithology of soils near the buildings and the measurements of Ra-226 concentration in the soils on the property. Consideration of the potential for contribution from non-LLRW Ra-226 from natural sources or coal ash was required on some properties. This paper describes the data and exploratory analysis of the relationship(s) between LLRW and non-LLRW factors that affect the variation in indoor radon concentrations. Historical information on the urban area, the measured Ra-226 concentration and the age of the building were correlated with radon concentrations. A large variety of native soils are found in the complex terrain and the type of native soil was correlated with the radon concentrations. A statistical analysis to address the impact of co-related explanatory variables to model indoor radon concentrations is planned when the SSS activities are complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗