Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROOM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Energy Efficiency in Small Server Rooms: Field Surveys and Findings

Fifty-seven percent of US servers are housed in server closets, server rooms, and localized data centers, in what are commonly referred to as small server rooms, which comprise 99percent of all server spaces in the US. While many mid-tier and enterprise-class data centers are owned by large corporations that consider energy efficiency a goal to minimize business operating costs, small server rooms typically are not similarly motivated. They are characterized by decentralized ownership and management and come in many configurations, which creates a unique set of efficiency challenges. To develop energy efficiency strategies for these spaces, we surveyed 30 small server rooms across eight institutions, and selected four of them for detailed assessments. The four rooms had Power Usage Effectiveness (PUE) values ranging from 1.5 to 2.1. Energy saving opportunities ranged from no- to low-cost measures such as raising cooling set points and better airflow management, to more involved but cost-effective measures including server consolidation and virtualization, and dedicated cooling with economizers. We found that inefficiencies mainly resulted from organizational rather than technical issues. Because of the inherent space and resource limitations, the most effective measure is to operate servers through energy-efficient cloud-based services or well-managed larger data centers, rather than server rooms. Backup power requirement, and IT and cooling efficiency should be evaluated to minimize energy waste in the server space. Utility programs are instrumental in raising awareness and spreading technical knowledge on server operation, and the implementation of energy efficiency measures in small server rooms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design themes for future hybrid nuclear power plant control rooms - 383

As nuclear power plants (NPP) control rooms are updated and new technologies added, a new hybrid control room is set to emerge and with it new safety implications for design. This paper highlights two technologies determined to be highly relevant for control room modernization: overview displays and computer-based procedures. Control room operators were observed in the simulator, while conducting abnormal and emergency scenarios. Additionally, operators were observed and interviewed in the control room during normal operations. Design themes for both of the technologies are discussed. Results revealed ten main design themes for overview displays, including observations of the system used currently in order to provide overview information. The results revealed three main design themes for computer-based procedures that were more directed at an envisioned world, since these technologies are not deployed currently. This evaluation elicited considerations for requirements for future control room system designs and recommendations for hybrid NPP control rooms. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Helmholtz resonance behavior of single and multiple rooms

The results of exploratory measurements of the noise fields inside rooms which are excited to resonance either acoustically or mechanically are presented. The data illustrate the nature and extent of the sound pressure level enhancements in single rooms and also how multiple rooms may resonate by means of either acoustic or mechanical coupling. Sound pressure level enhancements of about 5 dB were measured during resonance of rooms having flexible walls. For such conditions the sound pressure levels in the room were essentially uniform and in phase. Variability of up to 20 dB was measured in a room hallway complex having significant acoustic interactions. Resonant frequency prediction methods which work well at model scale, give only fair results for rooms.

Hubbard, H. H.↗

The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

Shy, Karla S.↗

True Cost of Amateur Clean rooms

This viewgraph document reviews the cost factors for clean rooms that are not professionally built, monitored or maintained. These amateur clean rooms are built because scientist and engineers desire to create a clean room to build a part of an experiment that requires a clean room, and the program manager is looking to save money. However, in the long run these clean rooms may not save money, as the cost of maintenance may be higher due to the cost of transporting the crews, and if the materials were of lesser quality, the cost of modifications may diminish any savings, and the product may not be of the same quality. Several examples are shown of the clean rooms that show some of the problems that can arise from amateur clean rooms.

Ramsey, W. Lawrence↗

Lessons Learned from Performing a Human Factors Engineering Validation of an Upgraded Digital Control System in a Nuclear Power Plant Control Room

The United States' fleet of nuclear power plants (NPPs) have exceeded their original 40-year licenses and many are seeking license renewals to continue operations into the future. To support continued operation the Department of Energy's (DOE) Light Water Reactor Sustainability Program (LWRS) provides support for utilities to maintain and upgrade their power production capabilities. Control room modernization is one focus area, which aims to modernization the analog control rooms with digital controls and human-system interfaces (HSIs). The Turbine Control System (TCS) is a non-safety related system undergoing modernization efforts at multiple plants and utilities. Considerable human factors research efforts, comprised of expert reviews and operator in the loop studies were performed to develop human factors compliant and usable TCS. This report documents the final phase of the human factors engineering program used to design and validate the new digital TCS. According to the NUREG-0711 review guide, one of the last steps of human factors engineering program prior to implementation is human factors validation. This report details the method, results and conclusions from the human factors validation study of a collaborating utilities TCS slated to be implemented in one of their plants. One control room team consisting of two control room supervisors and two reactor operators participated in the validation. All team members had participated in the BNP TCS training program foregoing the TCS validation. Performance measures included task performance, situation awareness and workload, expert observation of any negative influences of human-system interface features on control room team performance, and interviews with the participating operators. Performance criteria were based on the performance scores and the topics identified by interviews and expert observations. The results showed that the crew using the new TCS clearly could achieve their overall objectives in the test scenarios with sufficient situation awareness. The new TCS compared to the old system provided clear improvements of the control room work regarding shell and chest warming and regarding valve and other system testing. However, a number of Human Engineering Discrepancies (HEDs) were identified. HEDs were prioritized (level 1, 2 or 3) according to potential safety, plant availability, operability or personnel performance consequences. Since no priority 1 HEDs were identified there is no HFE reason not to continue implementation of the TCS. The TCS upgrade is acceptable if the Priority 2 HEDs are resolved and dispositioned in a satisfactory way. Priority 3 HEDs should be noted and considered for future modifications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A reinvestigation into Munson’s model for room closure in bedded rock salt

Accurate predictions of room closure are important for hazardous waste repositories in rock salt formations, such as the Waste Isolation Pilot Plant (WIPP). When Munson and co-workers simulated several room closure experiments conducted at the WIPP during the 1980’s and 1990’s, their simulated closure curves closely agreed with the closure measurements. A careful review of their work, however, raised concerns and prompted the reinvestigation in this paper. Here, to begin the reinvestigation, Munson’s legacy Room D closure simulation was reasonably recreated in a current-day finite element code. Next, special care was taken to obtain numerically converged results, re-introduce the anhydrite strata intermittently ignored by Munson, and calibrate the Munson–Dawson (M–D) constitutive model for salt as much as possible from laboratory test measurements. When this new model was used to simulate Room D’s closure, it under-predicted the horizontal and vertical closure rates by 2.34x and 3.10x, respectively, at 5.7 years after room excavation. As a result, the M–D model was extended to capture the newly established creep behavior at low equivalent stresses (<8 MPa) and replace the Tresca with the Hosford equivalent stress. Simulations using the new M–D model over-predicted the horizontal closure rate by 1.15x and under-predicted the vertical closure rate by 1.08x at 5.7 years, averaged over three room closure experiments. Although further improvements could be made, the new model has a stronger scientific foundation than Munson’s legacy model and appears ready for careful engineering use.

58 GEOSCIENCES↗

Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.

99 GENERAL AND MISCELLANEOUS↗

Using a Research Simulator for Validating Control Room Modernization Concepts

The Light Water Reactor Sustainability Program is a research, development, and deployment program sponsored by the United States Department of Energy. The program is operated in close collaboration with industry research and development programs to provide the technical foundations for licensing and managing the long-term, safe, and economical operation of nuclear power plants that are currently in operation. Advanced instrumentation and control (I&C) technologies are needed to support the continued safe and reliable production of power from nuclear energy systems during sustained periods of operation up to and beyond their expected licensed lifetime. This requires that new capabilities to achieve process control be developed and eventually implemented in existing nuclear control rooms. It also requires that approaches be developed and proven to achieve sustainability of I&C systems throughout the period of extended operation. Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe life extension of current reactors. One of the main areas of focus is control room modernization. Current analog control rooms are growing obsolete, and it is difficult for utilities to maintain them. Using its reconfigurable control room simulator adapted from a training simulator, INL serves as a neutral test bed for implementing new control room system technologies and assisting in control room modernization efforts across.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human factors and modeling methods in the development of control room modernization concepts - 315

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can even have a bigger impact on operations than, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed human factors design and evaluation methods to be used in the development of an end-state control room concept and to manage the various phases of the upgrade life cycle. This included interactive sessions with operators in INL's Human System Simulation Laboratory, and three-dimensional modeling to visualize control board changes. To make the various upgrade phases as concrete and as visible as possible, the end-state concept includes a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach results in an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Migration to a fully-integrated control room - 349

The nuclear industry is faced with a pressing need to reduce operating costs in order to remain competitive with other forms of electric generation. While current industry initiatives are focused on incremental gains by streamlining work processes and reducing worker burdens, very few, if any, involve significant reductions in the base workload of a nuclear plant. Migration to a fully-integrated control room affords just such an opportunity. This report describes an NPP digital instrumentation and control (I and C) system design, along with its corresponding human systems interface (HSI) design, which achieves high plant availability, while selectively applying digital equipment redundancy and integrating traditional I and C system partitions, to minimize the digital equipment needed, and thereby minimize initial installation costs and ongoing operations and maintenance (O and M) costs. An additional key component of digital equipment minimization is optimization of the digital interface to conventional plant sensors and controlled plant devices (e.g., pumps, valves), which requires no disturbance to plant cables and results in eliminating thousands of electro-mechanical relay control components. The design is rooted in the highly integrated digital technology applied to the most recent advanced light water reactors under United States (U.S.) Nuclear Regulatory Commission (NRC) design certification review and approval. While this design employs technology from new plants, that technology has been adapted to the modernization of current operating NPPs. Hence, the highly integrated digital I and C and HSI design is referred to as the compact control room digital modernization (CDM). Along with minimal digital equipment, the corresponding HSI design employs compact operator workstations with visual display units (VDU) and soft controls for both the main control room (MCR) and remote shutdown room (RSR), to immediately improve human performance and ultimately facilitate operating staff reduction. Some advanced light water reactors have demonstrated this staff reduction through full scope simulator testing of normal and abnormal plant conditions, with U.S. licensed operating crews from currently-operating U.S. plants. Digital equipment minimization, compact operator workstations, and optimized plant component interfaces that require no disturbance to field cables, also facilitate implementation of the CDM over multiple phases, most of which can be conducted during normal refueling shutdown windows. This phased implementation method includes a novel transition of the I and C, MCR and RSR with an operations centered focus. This paper presents the CDM design, along with qualitative cost/benefit comparisons to currently operating plants with conventional analog I and C and HSI technology; this generation of I and C/HSI is referred to as a conventional control room (CCR). A CCR also includes NPPs that have been upgraded with digital systems, but retain the current partitions between plant I and C systems (i.e., no I and C integration) and retain the current plant system to control board configuration of current NPP control rooms. Even though these comparisons are qualitative, a compelling case is presented for the CDM. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS

This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and risk associated with human performance in next generation control rooms.

99 GENERAL AND MISCELLANEOUS↗

Performance evaluation of ZnO–CuO hetero junction solid state room temperature ethanol sensor

Graphical abstract: Sensor response (resistance) curves of time were changed from 150 ppm to 250 ppm alcohol concentration of ZnO–CuO 1:1. The response and recovery times were measured to be 62 and 83 s, respectively. The sensing material ZnO–CuO is a high potential alcohol sensor which provides a simple, rapid and highly sensitive alcohol gas sensor operating at room temperature. Highlights: ► The main advantages of the ethanol sensor are as followings. ► Novel materials ZnO–CuO ethanol sensor. ► The optimized ZnO–CuO hetero contact system. ► A good sensor response and room working temperature (save energy). -- Abstract: A semiconductor ethanol sensor was developed using ZnO–CuO and its performance was evaluated at room temperature. Hetero-junction sensor was made of ZnO–CuO nanoparticles for sensing alcohol at room temperature. Nanoparticles were prepared by hydrothermal method and optimized with different weight ratios. Sensor characteristics were linear for the concentration range of 150–250 ppm. Composite materials of ZnO–CuO were characterized using X-ray diffraction (XRD), temperature-programmed reduction (TPR) and high-resolution transmission electron microscopy (HR-TEM). ZnO–CuO (1:1) material showed maximum sensor response (S = R{sub air}/R{sub alcohol}) of 3.32 ± 0.1 toward 200 ppm of alcohol vapor at room temperature. The response and recovery times were measured to be 62 and 83 s, respectively. The linearity R{sup 2} of the sensor response was 0.9026. The sensing materials ZnO–CuO (1:1) provide a simple, rapid and highly sensitive alcohol gas sensor operating at room temperature.

36 MATERIALS SCIENCE↗

Room-temperature calorimeter for x-ray free-electron lasers

We have developed a room-temperature calorimeter for absolute radiant power measurements of x-ray free-electron lasers. This room-temperature calorimeter is an electrical substitution device based on the equivalence of electrical and radiant heating. Consequently, the measured radiant powers are traceable to electrical standards, i.e., the International System Units (SI). We demonstrated the performance of the room-temperature calorimeter by electrical power measurements (offline tests). In the offline tests, the room-temperature calorimeter was proven to be able to measure external powers up to at least 6.9 mW, which exceeds the upper limit (∼4 mW) of a cryogenic radiometer (the primary standard detector in Japan). In addition, measurement uncertainties of the room-temperature calorimeter were evaluated to be less than 1.0%, which is adequate for the radiant power measurements of x-ray free-electron lasers. An indirect comparison with the cryogenic radiometer was performed using a synchrotron radiation source to confirm the validity of the absolute radiant powers measured with the room-temperature calorimeter. The absolute radiant powers measured by the calorimeter agreed with those measured by the cryogenic radiometer within 0.6%, which is less than the relative standard uncertainty of the comparison (1.0%)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Benefits of Leapfrogging to Superefficiency and Low Global Warming Potential Refrigerants in Room Air Conditioning

Hydrofluorocarbons (HFCs) emitted from uses such as refrigerants and thermal insulating foam, are now the fastest growing greenhouse gases (GHGs), with global warming potentials (GWP) thousands of times higher than carbon dioxide (CO2). Because of the short lifetime of these molecules in the atmosphere, mitigating the amount of these short-lived climate pollutants (SLCPs) provides a faster path to climate change mitigation than control of CO2 alone. This has led to proposals from Africa, Europe, India, Island States, and North America to amend the Montreal Protocol on Substances that Deplete the Ozone Layer (Montreal Protocol) to phase-down high-GWP HFCs. Simultaneously, energy efficiency market transformation programs such as standards, labeling and incentive programs are endeavoring to improve the energy efficiency for refrigeration and air conditioning equipment to provide life cycle cost, energy, GHG, and peak load savings. In this paper we provide an estimate of the magnitude of such GHG and peak electric load savings potential, for room air conditioning, if the refrigerant transition and energy efficiency improvement policies are implemented either separately or in parallel. We find that implementing HFC refrigerant transition and energy efficiency improvement policies in parallel for room air conditioning, roughly doubles the benefit of either policy implemented separately. We estimate that shifting the 2030 world stock of room air conditioners from the low efficiency technology using high-GWP refrigerants to higher efficiency technology and low-GWP refrigerants in parallel would save between 340-790 gigawatts (GW) of peak load globally, which is roughly equivalent to avoiding 680-1550 peak power plants of 500MW each. This would save 0.85 GT/year annually in China equivalent to over 8 Three Gorges dams and over 0.32 GT/year annually in India equivalent to roughly twice India’s 100GW solar mission target. While there is some uncertainty associated with emissions and growth projections, moving to efficient room air conditioning (~30% more efficient than current technology) in parallel with low-GWP refrigerants in room air conditioning could avoid up to ~25 billion tonnes of CO2 in 2030, ~33 billion in 2040, and ~40 billion in 2050, i.e. cumulative savings up to 98 billion tonnes of CO2 by 2050. Therefore, superefficient room ACs using low-GWP refrigerants merit serious consideration to maximize peak load reduction and GHG savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Energy Efficiency Improvements in Room Air Conditioners in India: Potential, Costs-Benefits, and Policies

Rising incomes, increasing urbanization, and large cooling demand prompted by India’s hot, humid climate are driving increasing uptake of room air conditioners (ACs). Air conditioning already accounts for 40-60% of summer peak load in large Indian cities such as Delhi and is on track to contribute 140 gigawatts (GW) (~30%) to peak demand in 2030. India’s standards and labeling policies improved the market average efficiency of room ACs by about 35% between 2006 and 2016 (3% per year) even as inflation-adjusted room AC prices continued to decline. In this report, we assess the technical feasibility and costs and benefits of accelerating the efficiency improvement in room ACs in India and discuss policy enhancements needed to achieve this goal. We also describe examples of rapid AC efficiency improvement from Japan and Korea. Driven by appropriate policies and programs, AC efficiency in these countries improved by more than 8% per year, resulting in near-doubling of energy efficiency over seven to ten years while inflationadjusted AC prices declined. We also find that the most efficient room AC sold on the Indian market is almost twice as efficient as the average AC sold on the market in 2015-16. As a result, we conclude that the technology needed to accelerate room AC efficiency in India is available.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Waffle Homes: Utilizing Aerial Imagery of Unfinished Buildings to Determine Average Room Size

A primary function of the Population Density Tables Project (PDT) at Oak Ridge National Laboratory is to produce residential population densities per 1000 sq. ft. for each country and their associated first-level administrative units. This is accomplished by utilizing the average size of different types of dwelling areas (urban, rural, single-family, multi-family, etc.) and the average household size provided by a country’s Census or statistical bureau records. This data is available for the majority of Europe, North America, and large swathes of Asia, but is less easily found in Africa and South America. In these regions, Censuses generally report dwelling area by number of rooms, which poses the challenging question of how we can translate number of rooms to dwelling size when no dwelling size areas are available with which to compare. Using sub-meter resolution satellite imagery of Accra, Ghana, this challenge can be tackled using imagery of roofless buildings currently under construction that show the interior floor plan of the dwelling. A sample of buildings from the different neighborhoods of Accra can be digitized to provide an estimate and range of average room sizes of dwellings. This average room size can then be translated to a total dwelling area using the "number of rooms occupied by a household" variable from the Ghanaian Census. This intermediate step between average dwelling size and number of rooms occupied, fills the missing link that prevents PDT from continually producing new population densities for countries where dwelling size is unavailable through any official means.

Woody, Carson↗