Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November/December 2020 for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

PFAS Treatment Pilot Study using Granular Activated Carbon at Kennedy Space Center, Florida

Per- and polyfluoroalkyl substances (PFAS) have been found in investigative derived waste (IDW) generated from groundwater sampling and remediation activities conducted at Kennedy Space Center (KSC), Florida. PFAS are exceptionally strong compounds because of carbon-fluorine bonds resulting in resistance to degradation, low chemical reactivity, compound stability, and persistence in the environment. The regulatory status of PFAS is very dynamic. PFAS is not considered a hazardous waste and has no federal or state (Florida) cleanup requirements at this time. Due to the current and unknown future of the regulatory and treatment landscape, non-hazardous IDW, based upon site volatile organic compounds (VOCs) regulated under Title 40 of Federal Regulations part 261, containing PFAS is not being processed for off-site waste disposal under KSC’s Resource Conservation and Recovery Act permit as a proactive precaution. Long-term storage of aqueous IDW in the meantime was determined to be inadequate due to the potential for spills and/or leaks. A very limited number treatment methods are available at this time. To date, granular activated carbon (GAC) and ion exchange technologies have been found to be some of the most consistent treatment options for removing PFAS from aqueous media. Therefore, a pilot study using GAC was developed at KSC to determine the feasibility of treating non-hazardous IDW containing PFAS to reduce the total volume of PFAS waste and minimize the risk of leaks or spills while storing the waste until complete PFAS-destructive treatment options are more readily available. NASA wanted the pilot test to be able to demonstrate the ability to completely remove 18 PFAS compounds and the site VOCs to below the state of Florida groundwater cleanup target levels (GCTLs).

Michael J Deliz↗

Adaptative Site Management for a 115 Acre Chlorinated Solvent Plume with Two Separate Source Areas at Kennedy Space Center, Florida

Background/Objectives. During Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) activities, Geosyntec delineated a chlorinated volatile organic compound (CVOC) plume at the National Aeronautics and Space Administration’s (NASA’s) Vehicle Assembly Building (VAB) area located at KSC, Florida. The RFI activities identified an approximate 115-acre dissolved plume (primarily vinyl chloride) and a trichloroethene (TCE) source area in an active aerospace complex that is surrounded by sensitive wetland/waterbodies. Due to the size of the impacted area, the Corrective Measure Design included a multi-component strategy: (i) address the source area via bioremediation; (ii) protect sensitive wetlands from impacted groundwater discharge via biosparging; and (iii) Long Term Monitoring (LTM) of the remaining dissolved plume. After the Corrective Measures implementation (CMI), NASA and Geosyntec worked with Florida Department of Environmental Protection (FDEP) to implement an adaptive site management for the complex, 115-acre site outside of the traditional RCRA process. The adaptive site management approach relied on performing supplemental assessments and implementing Interim Measures (IMs) to further assess and implement remedies over time while working within site and budget constraints, with an overall goal of achieving enough mass reduction to transition the entire site to LTM and eventually achieve site closure. Approach/Activities. After the biosparge barrier was operational and bioremediation within the source area (referred to as Hot Spot 1) achieved the Corrective Action Objective (CAO), supplemental assessment of the area between Hot Spot 1 and the biosparge barrier was performed. The conceptual site model was updated using the supplemental assessment results and an air sparge system IM was designed to treat an approximate 1.2 acre area (referred to as Hot Spot 2). After installation of the air sparge system, supplemental assessment within the remainder of the 115-acre dissolved plume was performed and a second TCE source area was identified. The TCE source area and associated areas with elevated CVOC concentrations (referred to as Hot Spot 3) were delineated and a bioremediation IM was implemented. Also, the downgradient impacts from Hot Spot 3 were adjacent to a sensitive waterbody, and negotiations with the FDEP allowed the area to be monitored using LTM. Results/Lessons Learned. The performance of supplemental assessment activities and implementation of remedial alternatives as IMs allowed NASA to successfully address groundwater impacts over time, while working within the FDEP regulatory framework. The implementation of the CMI and multiple IMs has achieved the following goals: (i) the biosparge barrier has mitigated the potential discharge of impacted groundwater to an adjacent wetland; (ii) enhanced bioremediation within Hot Spot 1 achieved the CAO within 2 years and transitioned the area into LTM; (iii) operation of an air sparge system within Hot Spot 2 removed TCE as a constituent of concern and contributed to a reduction (approximately 43%) in the impacted groundwater area outside the air sparge treatment area (plume collapse); and (iv) bioremediation within Hot Spot 3 removed approximately 80% of the CVOC mass and contributed to a reduction (approximately 47%) in the impacted groundwater area outside the bioremediation IM treatment area. Overall, the adaptive approach is protecting the sensitive water bodies surrounding the complex site and reducing the area of impacted groundwater, which is moving the entire site towards LTM.

Rebecca C Daprato↗

Firex Water Tank, SWMU 069, Confirmatory Sampling Report

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). Firex Water Tank (FWT), or the “site,” is designated as SWMU 069 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) field activities carried out during Fall 2021, at FWT, SWMU 069, KSC, Florida. Three locations of concern (LOCs) were identified by screening historical sample results to current State of Florida soil cleanup target levels (SCTL). A total of 18 soil samples were collected to investigate the historical exceedance locations. Samples at LOC 1 and 2 were analyzed for arsenic and the results for all were below the SCTL. Samples at LOC 3 were analyzed for polynuclear aromatic hydrocarbons and it was determined that certain locations have results that remain above the SCTL. The current land use controls will remain in place at FWT to mitigate potential risks.

Firex↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

Contractors Road Heavy Equipment Area (SWMU 055) 2021 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from January through December 2021. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with site-wide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; and - Semi-annual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act Corrective Action program. This report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under contract number 80KSC019F0096. The annual groundwater sampling results demonstrated that the footprint where chlorinated volatile organic compounds (VOC) are present above their State of Florida groundwater cleanup target levels (GCTLs) is not expanding overall. One non-chlorinated VOC (1,4-dioxane) is found above its GCTL at isolated points within the chlorinated VOC plume. The DPT groundwater investigation is being used to delineate the horizontal and vertical boundaries where chlorinated VOCs are present at levels above natural attenuation default concentrations. That data supports an evaluation of potential additional remedial actions. The potential for VI into the CRHE Area Office (K6-1996H) is evaluated by collected sub-slab vapor samples from four locations twice a year (once in the wet season and once in the dry season). The results for 2021 were all below the Environmental Protection Agency's vapor intrusion screening levels (VISLs) for both commercial and residential settings. The path forward for the site is to continue annual monitoring for chlorinated VOCs and 1,4-dioxane until additional remedies are implemented or the site is transitioned to long-term monitoring.

Contractors Road Heavy Equipment↗

Hydrocarbon Burn Facility, SWMU 007 PER- and Polyfluoroalkyl Substances (PFAS) Assessment report Addendum Kennedy Space Center, Florida

This document discusses the Per-and Polyfluoroalkyl Substances (PFAS) assessment activities performed from December 2020 through November 2021 at the Hydrocarbon Burn Facility (HBF) located at Kennedy Space Center (KSC), Florida. The HBF site has been designated Solid Waste Management Unit (SWMU) 007 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS Assessment Report Addendum (ARA) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011-80KSC019F0077.

Jennifer M. Buel↗

Firex Water Tank, SWMU 069, Confirmatory Sampling Report: Revision 2

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). Firex Water Tank (FWT), or the “site,” is designated as SWMU 069 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) field activities carried out during Fall 2021, at FWT, SWMU 069, KSC, Florida. Three locations of concern (LOCs) were identified by screening historical sample results to current State of Florida soil cleanup target levels (SCTL). A total of 18 soil samples were collected to investigate the historical exceedance locations. Samples at LOC 1 and 2 were analyzed for arsenic and the results for all were below the SCTL. Samples at LOC 3 were analyzed for polynuclear aromatic hydrocarbons and it was determined that certain locations have results that remain above the SCTL. The current land use controls will remain in place at FWT to mitigate potential risks.

Firex↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Fire Station #3 Area, Solid Waste Management Unit (SWMU) 106 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per-and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) presents the activities and results associated with PFAS investigation in the Fire Station #3 (FS3) Area located at Kennedy Space Center (KSC), Florida. FS3 (formerly known as Fire Station #6) was previously designated as Solid Waste Management Unit (SWMU) 106 for legacy contaminants that were investigated and still being managed under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 106 as the fire station was also identified as the potential source of PFAS to the environment in this area.

Sarah Damphouse↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗