Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

NASA Space Engineering Research Center for utilization of local planetary resources

The University of Arizona and NASA have joined to form the UA/NASA Space Engineering Research Center. The purpose of the Center is to discover, characterize, extract, process, and fabricate useful products from the extraterrestrial resources available in the inner solar system (the moon, Mars, and nearby asteroids). Individual progress reports covering the center's research projects are presented and emphasis is placed on the following topics: propellant production, oxygen production, ilmenite, lunar resources, asteroid resources, Mars resources, space-based materials processing, extraterrestrial construction materials processing, resource discovery and characterization, mission planning, and resource utilization.

Ramohalli, Kumar↗

Method for optimizing resource allocation in a government organization

The managers in Federal agencies are challenged to control the extensive activities in government and still provide high-quality products and services to the American taxpayers. Considering today's complex social and economic environment and the $3.8 billion daily cost of operating the Federal Government, it is evident that there is a need to develop decision-making tools for accurate resource allocation and total quality management. The goal of this thesis is to provide a methodical process that will aid managers in Federal Government to make budgetary decisions based on the cost of services, the agency's objectives, and the customers' perception of the agency's product. A general resource allocation procedure was developed in this study that can be applied to any government organization. A government organization, hereafter the 'organization,' is assumed to be a multidivision enterprise. This procedure was applied to a small organization for the proof of the concept. This organization is the Technical Services Directorate (TSD) at the NASA Lewis Research Center in Cleveland, Ohio. As part of the procedure, a nonlinear programming model was developed to account for the resources of the organization, the outputs produced by the organization, the decision-maker's views, and the customers' satisfaction with the organization. The information on the resources of the organization was acquired from current budget levels of the organization and the human resources assigned to the divisions. The outputs of the organization were defined and measured by identifying metrics that assess the outputs, the most challenging task in this study. The decision-maker's views are represented in the model as weights assigned to the various outputs and were quantified by using the analytic hierarchy process. The customer's opinions regarding the outputs of the organization were collected through questionnaires that were designed for each division individually. Following the philosophy of total quality management, information on customers' satisfaction is presented in the model as the quality of output. The model is a nonlinear one whose objective is to maximize customers' satisfaction such that the total cost of operation does not exceed the organization's budget. This model represents a structured approach or policy mechanism, at the agency level, to make capital investment decisions based on the priorities of the agency and the quality of outputs. This procedure applied to TSD resulted in a resources allocation scheme that was reasonable and acceptable to the decision-makers and, as expected, dependent on the assumptions and accuracy of the data used in the model.

Afarin, James↗

Resource Management for Distributed Parallel Systems

Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

Neuman, B. Clifford↗

Teaching with Space: K-6 Aviation, Space and Technology Resource Guide

Teaching with Space permits easy and quick identification of resources you will find most beneficial. This guide captures the essence of resources with applicability across the elementary curriculum. Specific product reviews and suggested uses in the classroom are provided to enable informed decision-making. Materials from NASA and the Federal Aviation Administration may be obtained in limited quantities at no cost from public domain sources when available. Pricing in this guide is based on duplication, warehousing, and overhead costs associated with distributing these items. Although this resource guide is a prototype guide distributed on a limited basis, we trust you will find it useful in locating quality instructional resources. Your suggestions and comments are most welcome, and will receive the fullest consideration as we work to expand and validate this guide for national distribution. Based on teacher criteria for quality, educational soundness, compatibility with the curriculum, ease of use, and affordability, the guide will be updated as new resources become available, and in response to teacher feedback. You may provide us with additional items for consideration at any time. We also are planning to develop a resource guide for middle and high school teachers, and your input is welcome for that effort too. This guide is just one way that space can help you in the classroom.

Source record↗

Adaptive Management of Computing and Network Resources for Spacecraft Systems

It is likely that NASA's future spacecraft systems will consist of distributed processes which will handle dynamically varying workloads in response to perceived scientific events, the spacecraft environment, spacecraft anomalies and user commands. Since all situations and possible uses of sensors cannot be anticipated during pre-deployment phases, an approach for dynamically adapting the allocation of distributed computational and communication resources is needed. To address this, we are evolving the DeSiDeRaTa adaptive resource management approach to enable reconfigurable ground and space information systems. The DeSiDeRaTa approach embodies a set of middleware mechanisms for adapting resource allocations, and a framework for reasoning about the real-time performance of distributed application systems. The framework and middleware will be extended to accommodate (1) the dynamic aspects of intra-constellation network topologies, and (2) the complete real-time path from the instrument to the user. We are developing a ground-based testbed that will enable NASA to perform early evaluation of adaptive resource management techniques without the expense of first deploying them in space. The benefits of the proposed effort are numerous, including the ability to use sensors in new ways not anticipated at design time; the production of information technology that ties the sensor web together; the accommodation of greater numbers of missions with fewer resources; and the opportunity to leverage the DeSiDeRaTa project's expertise, infrastructure and models for adaptive resource management for distributed real-time systems.

Pfarr, Barbara↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Propagating Resource Constraints Using Mutual Exclusion Reasoning

One of the most recent techniques for propagating resource constraints in Constraint Based scheduling is Energy Constraint. This technique focuses in precedence based scheduling, where precedence relations are taken into account rather than the absolute position of activities. Although, this particular technique proved to be efficient on discrete unary resources, it provides only loose bounds for jobs using discrete multi-capacity resources. In this paper we show how mutual exclusion reasoning can be used to propagate time bounds for activities using discrete resources. We show that our technique based on critical path analysis and mutex reasoning is just as effective on unary resources, and also shows that it is more effective on multi-capacity resources, through both examples and empirical study.

Frank, Jeremy↗

Resource Management for Real-Time Adaptive Agents

Increased autonomy and automation in onboard flight systems offer numerous potential benefits, including cost reduction and greater flexibility. The existence of generic mechanisms for automation is critical for handling unanticipated science events and anomalies where limitations in traditional control software with fixed, predetermined algorithms can mean loss of science data and missed opportunities for observing important terrestrial events. We have developed such a mechanism by adding a Hierarchical Agent-based ReaLTime technology (HART) extension to our Dynamic Resource Management (DRM) middleware. Traditional DRM provides mechanisms to monitor the realtime performance of distributed applications and to move applications among processors to improve real-time performance. In the HART project we have designed and implemented a performance adaptation mechanism to improve reaktime performance. To use this mechanism, applications are developed that can run at various levels of quality. The DRM can choose a setting for the quality level of an application dynamically at run-time in order to manage satellite resource usage more effectively. A groundbased prototype of a satellite system that captures and processes images has also been developed as part of this project to be used as a benchmark for evaluating the resource management framework A significant enhancement of this generic mission-independent framework allows scientists to specify the utility, or "scientific benefit," of science observations under various conditions like cloud cover and compression method. The resource manager then uses these benefit tables to determine in redtime how to set the quality levels for applications to maximize overall system utility as defined by the scientists running the mission. We also show how maintenance functions llke health and safety data can be integrated into the utility framework. Once thls framework has been certified for missions and successfully flight tested it can be reused with little development overhead for other missions. In contrast, current space missions llke Swift manage similar types of resource trade -off completely with the scientific application code itself, and such code must be re-certified and tested for each mission even if a large portion of the code base is shared. This final report discusses some of the major issues motivating this research effort, provides a literature review of the related work, discusses the resource management framework and ground-based satellite system prototype that has been developed, indicates what work is yet to be performed, and provides a list of publications resulting from this work.

Welch, Lonnie↗

Remote Sensing Assessment of Lunar Resources: We Know Where to Go to Find What We Need

The utilization of space resources is necessary to not only foster the growth of human activities in space, but is essential to the President s vision of a "sustained and affordable human and robotic program to explore the solar system and beyond." The distribution of resources will shape planning permanent settlements by affecting decisions about where to locate a settlement. Mapping the location of such resources, however, is not the limiting factor in selecting a site for a lunar base. It is indecision about which resources to use that leaves the location uncertain. A wealth of remotely sensed data exists that can be used to identify targets for future detailed exploration. Thus, the future of space resource utilization pre-dominantly rests upon developing a strategy for resource exploration and efficient methods of extraction.

Gillis, J. J.↗

Towards Designing an Integrated Earth Observation System for the Provision of Solar Energy Resource and Assessment

The GEOSS strategic plan specifically targets the area of improved energy resource management due to the importance of these to the economic and social viability of every nation of the world. With the world s increasing demand for energy resources, the need for new alternative energy resources grows. This paper overviews a new initiative within the International Energy Agency that addresses needs to better manage and develop solar energy resources worldwide. The goal is to provide the solar energy industry, the electricity sector, governments, and renewable energy organizations and institutions with the most suitable and accurate information of the solar radiation resources at the Earth's surface in easily-accessible formats and understandable quality metrics. The scope of solar resource assessment information includes historic data sets and currently derived data products using satellite imagery and other means. Thus, this new task will address the needs of the solar energy sector while at the same time will serve as a model that satisfies GEOSS objectives and goals.

Stackouse, Paul W., Jr.↗

Potential Lunar In-Situ Resource Utilization Experiments and Mission Scenarios

The extraction and use of resources on the Moon, known as In-Situ Resource Utilization (ISRU), can potentially reduce the cost and risk of human lunar exploration while also increasing science achieved. By not having to bring all of the shielding and mission consumables from Earth and being able to make products on the Moon, missions may require less mass to accomplish the same objectives, carry more science equipment, go to more sites of exploration, and/or provide options to recover from failures not possible with delivery of spares and consumables from Earth alone. The concept of lunar ISRU has been considered and studied for decades, and scientists and engineers were theorizing and even testing concepts for how to extract oxygen from lunar soil even before the Apollo 11 mission to the Moon. There are four main areas where ISRU can significantly impact how human missions to the Moon will be performed: mission consumable production, civil engineering and construction, energy production, storage, and transfer, and manufacturing and repair. The area that has the greatest impact on mission mass, hardware design and selection, and mission architecture is mission consumable production, in particular, the ability to make propellants, life support consumables, and fuel cell reagents. Mission consumable production allows for refueling and reuse of spacecraft, increasing power production and storage, and increased capabilities and failure tolerance for crew life support. The other three areas allow for decreased mission risk due to radiation and plume damage, alternative power systems, and failure recover capabilities while also enabling infrastructure growth over Earth delivered assets. However, while lunar ISRU has significant potential for mass, cost, and risk reduction for human lunar missions, it has never been demonstrated before in space. To demonstrate that ISRU can meet mission needs and to increase confidence in incorporating ISRU capabilities into mission architectures, terrestrial laboratory and analog field testing along with robotic precursor missions are required. A stepwise approach with international collaboration is recommended. The first step is to understand the resources available through orbital and surface exploration missions. Resources of particular interest are hydrogen, hydroxyl, water, and other polar volatile resources recently measured by Chandrayaan, Lunar Reconnaissance Orbiter (LRO), and the Lunar Crater Observation and Sensing Satellite (LCROSS). The second step is to demonstrate critical aspects of ISRU systems to prove ISRU is feasible under lunar environmental and resource conditions (ex. subscale oxygen extraction from regolith). The third step is to perform integrated missions with ISRU and other connected systems, such as power, consumable storage, surface mobility, and life support at a relevant mission scale to demonstrate ISRU capabilities as well as the critical interfaces with other exploration systems. If possible, the mission should demonstrate the use of ISRU products (ex. in a rocket engine or fuel cell). This dress rehearsal mission would be the final step before full implementation of ISRU into human missions, and may be performed during human lunar exploration activities. This stepwise approach is the most conservative approach, and may only be possible with international cooperation due to the limited number of robotic missions each nation/space agency can perform within their budget.

Sanders, Gerald B.↗

Mars Soil-Based Resource Processing and Planetary Protection

The ability to extract and process resources at the site of exploration into products and services, commonly referred to as In Situ Resource Utilization (ISRU), can have significant benefits for robotic and human exploration missions. In particular, the ability to use in situ resources to make propellants, fuel cell reactants, and life support consumables has been shown in studies to significantly reduce mission mass, cost, and risk, while enhancing or enabling missions not possible without the incorporation of ISRU. In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study. For the first time in a large scale Mars architecture study, water from Mars soil was considered as a potential resource. At the time of the study, knowledge of water resources (their form, concentration, and distribution) was extremely limited. Also, due to lack of understanding of how to apply planetary protection rules and requirements to ISRU soil-based excavation and processing, an extremely conservative approach was incorporated where only the top several centimeters of ultraviolet (UV) radiated soil could be processed (assumed to be 3% water by mass). While results of the Mars DRA 5.0 study showed that combining atmosphere processing to make oxygen and methane with soil processing to extract water provided the lowest mission mass, atmosphere processing to convert carbon dioxide (CO2) into oxygen was baselined for the mission since it was the lowest power and risk option. With increased knowledge and further clarification of Mars planetary protection rules, and the recent release of the Mars Exploration Program Analysis Group (MEPAG) report on "Special Regions and the Human Exploration of Mars", it is time to reexamine potential water resources on Mars, options for soil processing to extract water, and the implications with respect to planetary protection and Special Regions on Mars.

Sanders, G. B.↗

The Development of a Long-Term, Continually Updated Global Solar Resource at 10 km Resolution: Preliminary Results From Test Processing and Continuing Plans

Background: Considering the likelihood of global climatic weather pattern changes and the global competition for energy resources, there is an increasing need to provide improved and continuously updated global Earth surface solar resource information. Toward this end, a project was funded under the NASA Applied Science program involving the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC), National Renewable Energy Laboratory (NREL), the State University of New York/Albany (SUNY) and the NOAA National Climatic Data Center (NCDC) to provide NREL with a global long-term advanced global solar mapping production system for improved depiction of historical solar resources and variability and to provide a mechanism for continual updates of solar resource information. This new production system is made possible by the efforts of NOAA and NASA to completely reprocess the International Satellite Cloud Climatology Project (ISCCP) data set that provides satellite visible and infrared radiances together with retrieved cloud and surface properties on a 3-hourly basis beginning from July 1983. The old version of the ISCCP data provided this information for all the world TMs available geosynchronous satellite systems and NOAA TMs AVHRR data sets at a 30 km effective resolution. This new version aims to provide a new and improved satellite calibration at an effective 10 km resolution. Thus, working with SUNY, NASA will develop and test an improved production system that will enable NREL to continually update the Earth TM solar resource. Objective and Methods: In this presentation, we provide a general overview of this project together with samples of the new solar irradiance mapped data products and comparisons to surface measurements at various locations across the world. An assessment of the solar resource values relative to calibration uncertainty and assumptions are presented. Errors resulting assumptions in snow cover and background aerosol amount are described. These uncertainties and the statistics of the agreement between the measurements and new satellite estimates are also reviewed and compared to other solar data sets. Findings and Conclusions: Preliminary results show that insolation values show an overall small bias (less than 1%) with a RMS of 25% relative to surface measurements. Exceptions at certain locations were found and will be discussed relative to the uncertainties identified above. Lastly, we will identify the next steps in the development and improvement of this production system including some accuracy goals in preparation for ultimate delivery to NREL.

Stackhouse, P.↗

Mars Molniya Orbit Atmospheric Resource Mining

This NASA Innovative Advanced Concepts (NIAC) Phase I study examined the revolutionary concept of performing resource collection and utilization during Mars orbital operations in order to enable the landing of large payloads. An exploration architecture was developed, out of which several mission alternatives were developed. Concepts of operations were then developed for each mission alternative, followed by concepts for spacecraft systems, which were traded to assess their feasibility. A novel architecture using Mars Molniya Orbit Atmospheric Resource Mining is feasible to enable an Earth-independent and pioneering, permanent human presence on Mars by providing a reusable, single-stage-to-orbit transportation system. This will allow cargo and crew to be routinely delivered to and from Mars without transporting propellants from Earth.In Phase I, our study explored how electrical energy could be harnessed from the kinetic energy of the incoming spacecraft and then be used to produce the oxygen necessary for landing. This concept of operations is revolutionary in that its focus is on using in situ resources in complementary and varied forms: the upper atmosphere of Mars is used for aerocapture, which is followed by aerobraking, the kinetic energy of the spacecraft is transformed into usable electrical energy during aerobraking, and the atmospheric composition is the source of oxidizer for a landing under supersonic retropropulsion. This NASA Innovative Advanced Concepts (NIAC) Phase I study explores a novel mission architecture to establish routine, Earth-independent transfer of large mass payloads between Earth and the Mars surface and back to Mars orbit. The first stage of routine mission operations involves an atmospheric resource mining aerobraking campaign following aerocapture into a highly elliptical Mars orbit. During each pass through the atmosphere, the vehicle ingests the atmospheric oxidizer and stores it onboard, using solid oxide electrolysis to convert the primarily CO2 atmosphere into usable O2 for propellant. Power is made available through the use of magnetohydrodynamic energy generation, which converts the motion of the plasma in the shock later into usable electrical energy. Upon termination of the aerobraking sequence, the descent vehicle detaches from the orbit stack, deorbits, and executes the entry, descent, and landing sequence. Hypersonic deceleration is achieved via a deployable heat shield to lower the vehicle ballistic coefficient, and supersonic and subsonic deceleration are achieved via retropropulsion. Mars surface operations involve resource mining of the Martian regolith to produce CH4 and O2 propellant to be used for the subsequent MDAV ascent back to high Mars orbit (HMO) providing an apoapsis raise maneuver to initialize the aerobraking sequence, in addition to providing fuel from the Mars surface for EDL propulsive descent. The Resource Collector Vehicle (RCV), which is used for the orbital mining operations, is raised back to HMO via onboard deployable augmented solar electric propulsion. Concepts of operations were developed for each mission alternative, to evaluate between them and assess feasibility.

Mining↗

Connecting Projects to Complete the In Situ Resource Utilization Paradigm

Terrain Identify specifics such as slope, rockiness, traction parameters Identify what part of ISRU needs each Physical Geotechnical Hardness, density, cohesion, etc. Identify what part of ISRU needs each (e.g., excavation needs to know hardness, density; soil processing needs to know density, cohesion; etc.)Mineral Identify specifics Identify what part of ISRU needs each Volatile Identify specifics Identify what part of ISRU needs each Atmosphere Identify specifics Identify what part of ISRU needs each Environment Identify specifics Identify what part of ISRU needs each Resource Characterization What: Develop an instrument suite to locate and evaluate the physical, mineral, and volatile resources at the lunar poles Neutron Spectrometer Near Infrared (IR) to locate subsurface hydrogen surface water Near IR for mineral identification Auger drill for sample removal down to 1 m Oven with Gas Chromatograph Mass Spectrometer to quantify volatiles present ISRU relevance: Water volatile resource characterization and subsurface material access removal Site Evaluation Resource Mapping What: Develop and utilize new data products and tools for evaluating potential exploration sites for selection and overlay mission data to map terrain, environment, and resource information e.g., New techniques applied to generate Digital Elevation Map (DEMs) at native scale of images (1mpxl)ISRU relevance: Resource mapping and estimation with terrain and environment information is needed for extraction planning Mission Planning and Operations What: Develop and utilize tools and procedures for planning mission operations and real time changes Planning tools include detailed engineering models (e.g., power and data) of surface segment systems allows evaluation of designs ISRU relevance: Allows for iterative engineering as a function of environment and hardware performance.

Paradigm↗

MEDPRAT-SEL: Medical Resource Set Selector Searching High-Dimensionality Space

NASA Human Research Program's (HRP) next generation risk model closes the loop on medical risk and resource evaluation, providing researchers with a tool to assess and choose capabilities scientifically. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) simulator (SIM) evaluates resources in terms of medical benefit, such as reduced crew quality time lost (QTL), vs. cost, in mass or volume. The MEDPRAT resource set selector (SEL) searches the space of resource benefits v. cost, closing a feedback loop around the simulator, thus selecting resource sets with best benefit for cost. We discuss the design and results of the resource set selector. NASA HRP's emphasis on scientific assessment of risk, PRA, has led to the Cross-cutting Computational Modeling Project (CCMP).

Leinweber, Lawrence↗

Resource Prospector: A Lunar Volatiles Prospecting and ISRU Demonstration Mission

A variety of recent observations have indicated several possible reservoirs of water and other volatiles. These volatiles, and in particular water, have the potential to be a valuable or enabling resource for future exploration. NASA's Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) is supporting the development of Resource Prospector (RP) to explore the distribution and concentration of lunar volatiles prospecting and to demonstrate In-Situ Resource Utilization (ISRU). The mission includes a NASA developed rover and payload, and a lander will most likely be a contributed element by an international partner or the Lunar Cargo Transportation and Landing by Soft Touchdown (CATALYST) initiative. The RP payload is designed to: (1) locate near-subsurface volatiles, (2) excavate and analyze samples of the volatile-bearing regolith, and (3) demonstrate the form. extractability and usefulness of the materials. RP is being designed with thought given to its extensibility to resource prospecting and ISRU on other airless bodies and Mars. This presentation will describe the Resource Prospector mission, the payload and measurements, and concept of operations

In-Situ Resource Utilization (ISRU)↗

Resource Assessment for Distributed Wind Energy: An Evaluation of Best-Practice Methods in the Continental US

Current wind resources within the United States (US) indicate a potential to profitably install nearly 1,400 gigawatts of distributed wind (DW) capacity. This amount is equivalent to over half of the United States’ current energy demand from electricity, making it enough to power millions of homes and businesses and replace countless fossil fuel-based generating plants. Despite the potential growth of DW in the US, deployments are presently hindered by a lack of confidence in resource estimation methods. One potential challenge is that smaller-scale turbines, with hub heights of 40 meters or less, are disproportionately impacted by obstacles such as buildings and vegetation. These obstacles may produce complex wake effects, best modeled with high-fidelity complex fluid dynamics (CFD) models that are too computationally expensive to use for routine siting and resource assessment. Thus, installers today make use of heuristics and simple equations to approximate the impact of obstacles while also leveraging long-term resource data from commercial or publicly available atmospheric models. This study evaluates these historical and commonly used methods alongside new lower-order obstacle models produced from CFD simulations and measurement-based bias correction. The preliminary results from this study show the importance of taking care in the choice and application of mesoscale atmospheric models and the significant value of bias correction using measurements from nearby meteorological towers. Detailed obstacle modeling provides only modest additional gains in performance and, in some cases, can add error, especially at sites where turbines have already been located to avoid obvious impact from upwind obstacles. These findings reinforce the importance of collecting in situ measurements and suggest that obstacle models may be better applied in practice to automated or computer-aided siting, rather than in economic wind resource assessments.

17 WIND ENERGY↗