Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Dynamic Medical Risk Assessment Supported by Inference Networks

The Human Research Program's next generation risk model, the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT), provides researchers with estimates of astronaut medical and health risk. MEDPRATs Susceptibility Inference Network (SIN) facilitates the dynamic component of this tool. The SIN provides MEDPRAT with a "memory" that allows the system to use knowledge of what simulation events have occurred to alter the representative probability that future simulation events will occur during a given trial. The SIN allows for the medical events being simulated to be related to, and influence the likelihood of one another, providing a more robust risk estimate. We present initial work of our efforts to mathematically quantify and represent these dependent relationships between medical events.

McIntyre, L.↗

A Model-based Framework for Risk Assessment in Human-Computer Controlled Systems

The rapid growth of computer technology and innovation has played a significant role in the rise of computer automation of human tasks in modem production systems across all industries. Although the rationale for automation has been to eliminate "human error" or to relieve humans from manual repetitive tasks, various computer-related hazards and accidents have emerged as a direct result of increased system complexity attributed to computer automation. The risk assessment techniques utilized for electromechanical systems are not suitable for today's software-intensive systems or complex human-computer controlled systems. This thesis will propose a new systemic model-based framework for analyzing risk in safety-critical systems where both computers and humans are controlling safety-critical functions. A new systems accident model will be developed based upon modem systems theory and human cognitive processes to better characterize system accidents, the role of human operators, and the influence of software in its direct control of significant system functions. Better risk assessments will then be achievable through the application of this new framework to complex human-computer controlled systems.

Hatanaka, Iwao↗

Real-Time Risk Assessment Framework for Unmanned Aircraft System (UAS) Traffic Management (UTM)

The new Federal Aviation Administration (FAA) Small Unmanned Aircraft rule (Part 107) marks the first national regulations for commercial operation of small unmanned aircraft systems (sUAS) under 55 pounds within the National Airspace System (NAS). Although sUAS flights may not be performed beyond visual line-of-sight or over non- participant structures and people, safety of sUAS operations must still be maintained and tracked at all times. Moreover, future safety-critical operation of sUAS (e.g., for package delivery) are already being conceived and tested. NASA's Unmanned Aircraft System Trac Management (UTM) concept aims to facilitate the safe use of low-altitude airspace for sUAS operations. This paper introduces the UTM Risk Assessment Framework (URAF) which was developed to provide real-time safety evaluation and tracking capability within the UTM concept. The URAF uses Bayesian Belief Networks (BBNs) to propagate off -nominal condition probabilities based on real-time component failure indicators. This information is then used to assess the risk to people on the ground by calculating the potential impact area and the effects of the impact. The visual representation of the expected area of impact and the nominal risk level can assist operators and controllers with dynamic trajectory planning and execution. The URAF was applied to a case study to illustrate the concept.

Ancel, Ersin↗

Simulation Assisted Risk Assessment Applied to Launch Vehicle Conceptual Design

A simulation-based risk assessment approach is presented and is applied to the analysis of abort during the ascent phase of a space exploration mission. The approach utilizes groupings of launch vehicle failures, referred to as failure bins, which are mapped to corresponding failure environments. Physical models are used to characterize the failure environments in terms of the risk due to blast overpressure, resulting debris field, and the thermal radiation due to a fireball. The resulting risk to the crew is dynamically modeled by combining the likelihood of each failure, the severity of the failure environments as a function of initiator and time of the failure, the robustness of the crew module, and the warning time available due to early detection. The approach is shown to support the launch vehicle design process by characterizing the risk drivers and identifying regions where failure detection would significantly reduce the risk to the crew.

Mathias, Donovan L.↗

PDC19 Impact Exercise: Probabilistic Asteroid Impact Risk Assessment

Probabilistic Asteroid Impact Risk (PAIR) - PDC (Planetary Defense Conference) 2019 Hypothetical Exercise, NASA Ames, Asteroid Threat Assessment Project (ATAP) - Characterization Summary and Updates: Assessment date: 19 April 2027; Impact date: 29 April 2027 (10 days); Earth impact probability: 100 percent, New York Area; Diameter (meters): 60 plus or minus 10 (1 minus sigma), range 26–93; Energy: mean 11 megatons, range 650 kilotons to 46 megatons; Type: S class, remaining chunk of disrupted contact binary. Risk Summary: Affected population: mean 2.4 million, range zero to 10.2 million; Likely airburst at approximately16 kilometers altitude (8 to 29 kilometers); Blast overpressure is primary hazard; Damage out to approximately 70 kilometers if larger, lower burst; Little-to-no damage if burst is small and high.

Wheeler, Lorien↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗

Statistical aspects of carbon fiber risk assessment modeling

The probabilistic and statistical aspects of the carbon fiber risk assessment modeling of fire accidents involving commercial aircraft are examined. Three major sources of uncertainty in the modeling effort are identified. These are: (1) imprecise knowledge in establishing the model; (2) parameter estimation; and (3)Monte Carlo sampling error. All three sources of uncertainty are treated and statistical procedures are utilized and/or developed to control them wherever possible.

Gross, D.↗

Challenges of Debris-Impact Risk Assessment for Robotic Spacecraft

This paper describes an orbital debris impact risk assessment performed on the command and data subsystem electronics box of QuikSCAT, a functioning spacecraft with approximately 18 years on orbit. Several aspects of the analysis are paid particular attention. First is the modeling of a thermal blanket at a small stand-off distance from the box chassis. The properties of the blanket are such that under some assumptions, it may be treated as an effective bumper shield, and under other assumptions, it may not. The assumptions and their effects on the results of the analysis are explored. Similarly, the configuration of the electronic components inside the chassis are such that several definitions of failure criteria appear plausible. The results of each treatment are presented together and compared with the status of the actual electronics box. The failure predictions vary widely between treatments, and the more conservative assumption sets predict incredulously high probabilities of failure. This is problematic because the conservative assumptions are the ones typically used in analyses for flight projects.

Ratliff, Martin↗

Development of A Crew Health and Performance System Probabilistic Risk Assessment Tool: Proof-of-Concept Approach

The crew health and performance (CHP) system represents the span of technological interventions and tested processes and procedures that in combination address the human risk to space flight. The Human Research Program (HRP) mental model of the CHP system breaks the capabilities needed to meet NASA human flight systems standards into specific categories (i.e., countermeasures, behavioral health, medical intervention). These categories are further broken down into specific sub-groups generally associated with the human system risks that these capabilities seek to mitigate. Like the approach used to develop the Integrated Medical Model (IMM) and the Medical Extensible Dynamic Probabilistic Risk Analysis Tool (MEDPRAT), HRP tasked NASA GRC’s Cross-Cutting Computational Modeling Project with developing a CHP probabilistic risk assessment tool, the CHP-PRA. The CHP-PRA model seeks to quantify and relatively assess the human risk state within the crew health and performance domain, using a combination of knowledge about human system risks and technology and practices likely to be applied during space flight missions. This modeling system will incorporate customer and stakeholder feedback and be flexible enough to address multiple different questions about important low-level mission-specific parameters. This presentation will introduce the initial concept and development timeline for this tool and demonstrate proof-of-concept through an application addressing a specific human risk question posed within the Artemis program.

Risk analysis↗

Introduction to Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT)

A key component in the development of NASA Human Research Programs (HRP) next generation risk model, the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) intends to deliver a means to quantify how HRP products impact astronaut medical and health risks. MEDPRAT is extensible to the majority of exploration missions. Similar to other risk models, the tool utilizes the available space and terrestrial medical data. MEDPRAT is designed to be extended with additional human health research information, medical equipment, space and terrestrial standards and practices to assess space flight medical risk in a manner consistent with other risk measures used in spacecraft and mission design. This tool provides risk-based medical system design information necessary to evaluate new technologies, procedures, research insights and mission plans.

physiological response↗

A Strategy to Integrate Probabilistic Risk Assessment into Design and Development Processes for Aerospace Based pon Mars Exploration Rover Experiences

This paper will discuss the Probabilistic Risk Assessment (PRA) effort and its involvement with related activities during the development of the Mars Exploration Rover (MER). The Rovers were launched 2003.June.10 (Spirit) and 2003.July.7 (Opportunity), and both have proven very successful. Although designed for a 90-day mission, the Rovers have been operating for over two earth years. This paper will review aspects of how the MER project integrated PRA into the design and development process. A companion paper (Development of the Mars Exploration Rover PRA) will describe the MER PRA and design changes from those results.

Probabilistic Risk Assessment (PRA)↗

Micrometeoroid and Orbital Debris (MMOD) Testing, Ballistic Limit Definition and Risk Assessment of the Exploration Extravehicular Mobility Unit (xEMU)

A well-known hazard associated with exposure to the space environment is the risk of failure due to an impact from a micrometeoroid and orbital debris (MMOD) particle. As NASA prepares to return astronauts to the moon with the Artemis program, the next generation of spacesuit is in development to support future extravehicular activities (EVAs.) An MMOD impact to the spacesuit is of great concern as a large leak could prevent an astronaut from safely reaching an airlock in time resulting in a loss of life. The exploration extravehicular mobility unit (xEMU) must meet MMOD requirements for multiple environments including those in low earth orbit (LEO) as well as the meteoroid and secondary lunar regolith ejecta environments found on the lunar surface. The subject of this paper is an internal xEMU configuration design developed by NASA Johnson Space Center (JSC) personnel. The xEMU shares similarities with the legacy Extravehicular Mobility Unit (EMU) spacesuit that is currently used for ISS EVAs, however differences in the layup (e.g., materials, thicknesses, and layers) of the fabric environmental protection garment (EPG), portable life support system (xPLSS) and helmet required an extensive test program to determine ballistic performance. Over 100 hypervelocity impact (HVI) tests were performed by the NASA/JSC HVIT and White Sands Test Facility (WSTF) teams on the xEMU EPG, xPLSS and helmet to generate ballistic limit equations (BLEs) for MMOD impacts. Additionally, over 50 low speed tests (< 1km/s) were performed by the NASA/JSC HVIT and Southwest Research Institute (SwRI) teams on the xEMU EPG, xPLSS and helmet to generate BLEs for lunar ejecta impacts. Post testing, ballistic limit equations (BLEs) used to define the performance of the various regions on the xEMU spacesuit were developed from a generic set of BLEs. The HVI and low speed testing was performed to establish a physical basis for the equations with the coefficients and exponents of the generic BLEs adjusted to fit the test data. The xEMU BLEs were added to the NASA/JSC software application used for spacecraft MMOD risk assessments (BUMPER-3). A finite element model (FEM) of the xEMU spacesuit, which defines the size and shape of the spacesuit as well as the locations of the various shielding configurations, was created based on a solid model provided by the xEMU program office. Using the FEM file and added xEMU BLEs, BUMPER-3 assessments of the xEMU spacesuit for probability of no penetration (PNP) were performed. For the LEO assessment of a typical ISS EVA, the orbital debris and meteoroids environments were defined using the latest engineering models, ORDEM 3.2 and MEM-3 respectively. The lunar surface assessment again used the MEM-3 engineering model to define the meteoroid environment along with the current released lunar surface ejecta model, NASA SP-8013 (developed during the Apollo Program). The Space Team in the Natural Environments Branch at Marshall Space Flight Center (MSFC) will soon release the new Lunar Meteoroid Ejecta Engineering Model (LMEEM), at which time the xEMU lunar surface EVA will be reassessed. Assessment of the MMOD risk for an 8-hour, 2-person EVA in both LEO and on the lunar surface showed that the xEMU spacesuit meets the program technical requirement of 1 in 2500 failure odds. Similar to the legacy EMU spacesuit, the majority of the MMOD risk (96% of the LEO EVA risk and 99% of the lunar surface EVA risk) is concentrated in regions of xEMU that are comprised primarily of softgoods (arms, legs, and gloves) rather than the hardgoods (xPLSS, hard upper torso and helmet).

Micrometeoroid↗

Micrometeoroid and Orbital Debris (MMOD) Testing, Ballistic Limit Equation Definition and Risk Assessment of the Exploration Extravehicular Mobility Unit (xEMU)

A well-known hazard associated with exposure to the space environment is the risk of failure due to an impact from a micrometeoroid and orbital debris (MMOD) particle. As NASA prepares to return astronauts to the moon with the Artemis program, the next generation of spacesuit is in development to support future extravehicular activities (EVAs.) An MMOD impact to the spacesuit is of great concern as a large leak could prevent an astronaut from safely reaching an airlock in time resulting in a loss of life. The exploration extravehicular mobility unit (xEMU) must meet MMOD requirements for multiple environments including those in low earth orbit (LEO) as well as the meteoroid and secondary lunar regolith ejecta environments found on the lunar surface. The subject of this paper is an internal xEMU configuration design developed by NASA Johnson Space Center (JSC) personnel. This paper will expand on the hypervelocity impact (HVI) testing and ballistic limit equation (BLE) definition work that was partially presented at the 2nd International Orbital De-bris (IOC-II) Conference held in Sugar Land, TX in December 2023. The xEMU shares similarities with the legacy Extravehicular Mobility Unit (EMU) spacesuit that is currently used for ISS EVAs, however differences in the layup (e.g., materials, thicknesses, and layers) of the fabric environmental protection garment (EPG), portable life support system (xPLSS) and helmet required an extensive test program to determine ballistic performance. Over 100 hypervelocity impact (HVI) tests were performed by the NASA/JSC HVIT and White Sands Test Facility (WSTF) teams on the xEMU EPG, xPLSS and helmet to generate ballistic limit equations (BLEs) for MMOD impacts. Additionally, over 50 low speed tests (< 1km/s) were performed by the NASA/JSC HVIT and Southwest Research Institute (SwRI) teams on the xEMU EPG, xPLSS and helmet to generate BLEs for lunar ejecta impacts. Post testing, ballistic limit equations used to define the performance of the various regions on the xEMU spacesuit were developed from a generic set of BLEs. The HVI and low speed testing was performed to establish a physical basis for the equations with the co-efficients and exponents of the generic BLEs adjusted to fit the test data. The xEMU BLEs were added to the NASA/JSC software application used for space-craft MMOD risk assessments (BUMPER-3). A finite element model (FEM) of the xEMU spacesuit, which defines the size and shape of the spacesuit as well as the locations of the various shielding configurations, was created based on a solid model provided by the xEMU program office. Using the FEM file and added xEMU BLEs, BUMPER-3 assessments of the xEMU spacesuit for probability of no penetration (PNP) were performed. For the LEO assessment of a typical ISS EVA, the orbital debris and meteoroids environments were defined using the latest engineering models, ORDEM 3.2 and MEM-3 respectively. The lunar sur-face assessment again used the MEM-3 engineering model to define the meteoroid environ-ment along with the current released lunar surface ejecta model, NASA SP-8013 (developed during the Apollo Program). The Space Team in the Natural Environments Branch at Mar-shall Space Flight Center (MSFC) will soon release the new Lunar Meteoroid Ejecta Engineering Model (LMEEM), at which time the xEMU lunar surface EVA will be reassessed. Assessment of the MMOD risk for an 8-hour, 2-person EVA in both LEO and on the lunar surface showed that the xEMU spacesuit meets the program technical requirement of 1 in 2500 failure odds. Similar to the legacy EMU spacesuit, the majority of the MMOD risk (96% of the LEO EVA risk and 99% of the lunar surface EVA risk) is concentrated in regions of xEMU that are comprised primarily of softgoods (arms, legs, and gloves) rather than the hardgoods (xPLSS, hard upper torso and helmet).

Micrometeoroid↗

Micrometeoroid and Orbital Debris (MMOD) Testing, Ballistic Limit Equation Definition and Risk Assessment of the Exploration Extravehicular Mobility Unit (XEMU)

A well-known hazard associated with exposure to the space environment is the risk of failure due to an impact from a micrometeoroid and orbital debris (MMOD) particle. As NASA prepares to return astronauts to the moon with the Artemis program, the next generation of spacesuit is in development to support future extravehicular activities (EVAs). An MMOD impact to the spacesuit is of great concern as a large leak could prevent an astronaut from safely reaching an airlock in time resulting in a loss of life. The exploration extravehicular mobility unit (xEMU) must meet MMOD requirements for multiple environments including those in low earth orbit (LEO) as well as the meteoroid and secondary lunar regolith ejecta environments found on the lunar surface. The subject of this paper is an MMOD risk assessment of the internal xEMU configuration design developed by NASA Johnson Space Center (JSC) personnel. Assessment of the MMOD risk for an 8-hour, 2-person EVA in both LEO and on the lunar surface showed that the xEMU spacesuit meets the program technical requirement of 1 in 2500 failure odds.

Micrometeoroid↗

BBN-Based Portfolio Risk Assessment for NASA Technology R&D Outcome

The NASA Aeronautics Research Mission Directorate (ARMD) vision falls into six strategic thrusts that are aimed to support the challenges of the Next Generation Air Transportation System (NextGen). In order to achieve the goals of the ARMD vision, the Airspace Operations and Safety Program (AOSP) is committed to developing and delivering new technologies. To meet the dual challenges of constrained resources and timely technology delivery, program portfolio risk assessment is critical for communication and decision-making. This paper describes how Bayesian Belief Network (BBN) is applied to assess the probability of a technology meeting the expected outcome. The network takes into account the different risk factors of technology development and implementation phases. The use of BBNs allows for all technologies of projects in a program portfolio to be separately examined and compared. In addition, the technology interaction effects are modeled through the application of object-oriented BBNs. The paper discusses the development of simplified project risk BBNs and presents various risk results. The results presented include the probability of project risks not meeting success criteria, the risk drivers under uncertainty via sensitivity analysis, and what-if analysis. Finally, the paper shows how program portfolio risk can be assessed using risk results from BBNs of projects in the portfolio.

Geuther, Steven C.↗

Pre-flight risk assessment in Emergency Medical Service (EMS) helicopters

The Emergency Medical Service (EMS) industry has been the subject of several television and newspaper articles (Harvey and Jensen, 1987) which emphasized the negative aspects, (e.g., fatalities and high accident rates), rather than the life saving services performed. Until recently, the accident rate of the EMS industry has been five times as high as that of other civil helicopters. This high accident rate has been coupled with the dramatic rise in the number of programs. The industry has built from a single service at its inception in 1972, to over 180 in 1987 (Spray, 1987), to the point that 93 percent of the contiguous U.S. is now covered by some type of EMS service. These factors prompted the National Transportation Safety Board (NTSB) to study the accidents that occurred between May 11, 1978 and December 3, 1986 (NTSB, 1988). The NTSB report concluded that 'Sound pilot judgment is central to safe flight operations.' They further stated that '... factors unique to EMS helicopter operations--such as the influence of the mission itself, program competition, and EMS program management perspectives--can drastically influence pilot judgment during the EMS mission.' One of the most difficult decisions that a pilot must make is whether to accept or decline a mission. A pre-flight risk assessment system (SAFE) was developed at NASA-Ames Research Center for civil EMS operations to aid pilots in making this decision objectively. The ability of the SAFE system to predict mission risk profiles was tested at an EMS facility. The results of this field study demonstrated that the usefulness of SAFE was highly dependent on the type of mission flown. SAFE is now being modified so that it can 'learn' with each mission flown. For example, after flying a mission to a particular site, an EMS pilot would input information about this mission into the system, such as new buildings, wires, or approach procedures. Then, the next time a pilot flew a similar mission or one to the same area, this additional information would be taken into account in computing a risk assessment.

Shively, R. J.↗

Strategy for Risk Quantification of Spaceflight Crew Health and Performance Using Dynamic Probabilistic Risk Assessment

At NASA, the Crew Health and Performance (CHP) system represents the span of countermeasures, capabilities, interventions, and tested processes and procedures that in combination work to mitigate the human component of spaceflight mission risk. Across the varying NASA mental models of the CHP system, the different functionalities needed to meet human flight systems standards can be broken down into specific categories (i.e. medical capability, environmental health, behavioral health). These categories can be further broken down into specific subgroups generally associated with the CHP functionalities meant to mitigate or buy down individual human system risks. Taking a similar development approach we seek to leverage dynamic probabilistic risk assessment as a means to quantify and relatively assess the human risk state within the crew health and performance domain. By utilizing existing tools as integrators, we propose a rapid development strategy for incorporating research and operational data that represent the influence of the CHP system functionalities, in order to provide order of magnitudes estimates of the influence on most human system risks outcomes. The model system utilizes a modest cumulative risk approach and that limits the scope to primary paths of influence between the CHP functionalities and human system risks, thus enabling quick prototypes of the integrative effects of CHP functional combinations to solicit valuable feedback from stakeholders and customers on the data, relationship, and structure of the integration.

Drayton Munster↗