Coupling geophysical, geological, geochemical and mineralogical assessments to examine preferential contaminant transport pathways in interbedded fractured bedrock
This study shows that a multi-faceted approach, combining borehole geophysical logging and surface seismic P-wave first-arrival tomography with confirmatory coring, well installation, and chemical and mineralogical analysis, is effective for identifying difficult-to-locate preferential contaminant transport pathways in deeper fractured bedrock. Seismic tomography detected porous 10–20 m wide elongated fractured conduits that allow acidic groundwater contaminated with uranium (U) and nitrate (NO 3 - ) to migrate within interbedded shale-limestone bedrock over 1000 m from a former disposal facility (S-3 Ponds site) located at the DOE Y-12 National Security Complex in Tennessee (USA). Conventional drilling techniques would easily miss these conduits because they are oriented parallel with fractured bedding planes. Synchrotron analysis of aquifer solids revealed that > 95 % of the U is hexavalent (U VI ). This uranyl (UO 2 2+ ) species is coordinated with carbonate, iron oxide, silicate and phosphate minerals within cemented white to yellow precipitates, which contain U concentrations as high as ∼21.6 % by weight fraction. Identifying the presence of these mineral phases, enables a further understanding of the potential effectiveness of remediation actions. The combination of methodologies presented here can also be applied to other explorations, such as the detection of water supply.