Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Meeting Hanford's Infrastructure Requirements - 12505

Hanford, by all accounts, is an enormous and complex project, with thousands of disparate, but co-mingled activities in motion on any given day. The primary target of the mission at Hanford is cleanup of the 586 square-mile site, but there is the equally vital mission of site services and infrastructure. Without functions like the well-maintained site roads, electricity, water, and emergency management services, not a single cleanup project could be undertaken. As the cleanup projects evolve - with new work-scope emerging, while existing projects are completed - there becomes a very real need to keep projects integrated and working to the same 'blueprint'. And the Hanford blueprint extends for years and includes myriad variables that come with meeting the challenges and complexities associated with Hanford cleanup. Because of an innovative and unique contracting strategy, the Department of Energy (DOE) found a way to keep the cleanup projects un-encumbered from the side task of having to self-provide their individual essential site services, thus allowing the cleanup contractors to concentrate their efforts on their primary mission of cleaning up the site. These infrastructure and support services also need to be provided efficiently and cost effectively - done primarily through 'right-sizing' efforts. The real innovation came when DOE had the foresight to include a second provision in this contract which specifically asked for a specialized role of site integrator and innovator, with a special emphasis placed on providing substantial cost savings for the government. The need for a true site integrator function was necessitated by the ever-increasing complexity of projects at Hanford and the progression of cleanup at others. At present, there are two main DOE offices overseeing the cleanup work and six primary contractors performing that work. Each of these contractors works to separate schedules and cleanup milestones, and the nature of the cleanup differs, but all are intertwined in their need for essential site services. One of the key tasks spelled out in the Mission Support Contract (MSC) is to take the volumes of cost, schedule and budget forecasting data each contractor is responsible for and consolidate that data into a 'one Hanford' perspective, with a clear and well-defined 'map' of the future, taking into account the many cross-cutting priorities at the site. This function is termed 'portfolio management' in the MSC. In 2009, the DOE awarded the MSC to Mission Support Alliance, LLC. (MSA), a team made up of industry leaders with key government services credentials, Lockheed Martin, Jacobs Engineering and WSI. Now into its third year managing the contract, MSA has continually shown tangible results in its oversight of the MSC. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shared automated vehicle fleet operations for first-mile last-mile transit connections with dynamic pooling

Shared automated vehicles (SAVs) have the potential to promote transit ridership by providing efficient first-mile last-mile (FMLM) connections through reduced operational costs to fleet providers and lower out-of-pocket costs to riders. To help plan for a future of integrated mobility, this paper investigates the impacts of SAVs serving FMLM connections, as a mode that provides flexibility in access/egress decisions and is well coordinated with train station schedules. To achieve this objective, a novel dynamic pooling algorithm was introduced to match SAVs with riders while coordinating the riders' arrival times at the light-rail station to a known train schedule. Microsimulations of SAVs and travelers throughout two central Austin neighborhoods show how larger service areas, higher levels of SAV demand, and longer arrival times between successive trains require larger SAV fleet sizes and higher SAV utilization rates to deliver close traveler wait times. Four-person SAVs appear to perform similar to 6-seat SAVs but will cost less to provide. Using a dynamic pooling algorithm tightly coordinated with train arrivals (every 15 min) delivers 87% of travelers to their stations in time to catch the next train, whereas uncoordinated assignments deliver just 58% of travelers in time.

33 ADVANCED PROPULSION SYSTEMS↗

Real-Time Lifetime Prediction of Semiconductor Devices Using Hardware-in-the-Loop

This paper presents a unique approach to enable real-time lifespan prediction of semiconductor power modules using a Hardware-in-the-Loop (HIL) system. By integrating the module's overall loss characteristics-specifically switching and conduction losses-with a thermoelectric model of the thermal management system, this research demonstrates that the model can dynamically estimates the junction temperature profile of the semiconductor devices in response to a changing torque demand profile for the motor drive system. This capability enables continuous monitoring of the module's operational time and cumulative stress induced on the devices to compute accumulated remaining lifetime or time-to-failure (TTF). This study provides an architectural framework for the HIL system with high-fidelity component models of multiple physical domains, allowing simulation of dynamic behaviors of a closely-coupled motor drive system. The advanced real-time computation and measurement functionalities of the HIL system allow for both dynamic lifetime calculations based on simulated data and aggregate lifetime predictions utilizing historical data. Moreover, this paper details an algorithm that not only computes cumulative damage but also synthesizes these data into a comprehensive aggregated lifetime metric. This methodology can enhance the maintenance scheduling strategies and operational reliability of semiconductor devices in critical applications, ultimately extending their service life while optimizing performance.

hardware-in-the-loop (HIL)↗

Adaptive building load control to enable high penetration of solar photovoltaic generation

This paper investigates the ability of a collection of deferrable heating, ventilation and air conditioning (HVAC) loads to directly emulate energy storage devices (ESD), that is, to absorb any low frequency fluctuations in solar generation. We find the optimal number of aggregated HVAC loads to absorb solar fluctuation in the same frequency band based on frequency analysis. To guarantee quality of service in afleet of residential buildings, an optimization problem is formed to compute optimal schedule of the HVAC loads considering temperature comfort band and available solar generation. By minimizing the tracking error between solar generation and total consumption, the proposed method also quantifies the minimum capacity of ESD (battery or fly-wheel) . The simulation results show that the proposed techniques are able to achieve good solar tracking performance as well as obtain a minimal ESD capacity. Therefore, we show that most of the renewable generation can be consumed locally through an intelligent coordination of HVAC loads, their impacts on the grid would be minimal and the required ESD capacity can be minimized.

Dong, Jin↗

The Future Impact of Wind on BPA Power System Ancillary Services

Wind power is growing in a very fast pace as an alternative generating resource. As the ratio of wind power over total system capacity increases, the impact of wind on various system aspects becomes significant. This paper presents a methodology to study the future impact of wind on BPA power system ancillary services including load following and regulation. Existing approaches for similar analysis include dispatch model simulation and standard deviation evaluation. The methodology proposed in this paper uses historical data and stochastic processes to simulate the load balancing processes in BPA power system. Then capacity, ramp rate and ramp duration characteristics are extracted from the simulation results, and load following and regulation requirements are calculated accordingly. It mimics the actual power system operations therefore the results can be more realistic yet the approach is convenient to perform. Further, the ramp rate and ramp duration data obtained from the analysis can be used to evaluate generator response or maneuverability and energy requirement, respectively, additional to the capacity requirement.

17 WIND ENERGY↗

Virtualized Network Control (VNC)

The focus of this project was on the development of a "Network Service Plane" as an abstraction model for the control and provisioning of multi-layer networks. The primary motivation for this work were the requirements of next generation networked applications which will need to access advanced networking as a first class resource at the same level as compute and storage resources. A new class of "Intelligent Network Services" were defined in order to facilitate the integration of advanced network services into application specific workflows. This new class of network services are intended to enable real-time interaction between the application co-scheduling algorithms and the network for the purposes of workflow planning, real-time resource availability identification, scheduling, and provisioning actions.

97 MATHEMATICS AND COMPUTING↗

Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

and Guidance↗

Real-Time Charging Strategies for an Electric Vehicle Aggregator to Provide Ancillary Services

Real-time charging strategies, in the context of vehicle to grid (V2G) technology, are needed to enable the use of electric vehicle (EV) fleets batteries to provide ancillary services (AS). Here, we develop tools to manage charging and discharging in a fleet to track an Automatic Generation Control (AGC) signal when aggregated. We also propose a real-time controller that considers bidirectional charging efficiency and extend it to study the effect of looking ahead when implementing Model Predictive Control (MPC). Simulations show that the controller improves tracking error as compared with benchmark scheduling algorithms, as well as regulation capacity and battery cycling.

33 ADVANCED PROPULSION SYSTEMS↗

One network metric datastore to track them all: the OSG network metric service

The Open Science Grid (OSG) relies upon the network as a critical part of the distributed infrastructures it enables. In 2012, OSG added a new focus area in networking with a goal of becoming the primary source of network information for its members and collaborators. This includes gathering, organizing, and providing network metrics to guarantee effective network usage and prompt detection and resolution of any network issues, including connection failures, congestion, and traffic routing. In September of 2015, this service was deployed into the OSG production environment. We will report on the creation, implementation, testing, and deployment of the OSG Networking Service. Starting from organizing the deployment of perfSONAR toolkits within OSG and its partners, to the challenges of orchestrating regular testing between sites, to reliably gathering the resulting network metrics and making them available for users, virtual organizations, and higher level services, all aspects of implementation will be reviewed. In particular, several higher-level services were developed to bring the OSG network service to its full potential. These include a web-based mesh configuration system, which allows central scheduling and management of all the network tests performed by the instances; a set of probes to continually gather metrics from the remote instances and publish it to different sources; a central network datastore (esmond), which provides interfaces to access the network monitoring information in close to real time and historically (up to a year) giving the state of the tests; and a perfSONAR infrastructure monitor system, ensuring the current perfSONAR instances are correctly configured and operating as intended. We will also describe the challenges we encountered in ongoing operations of the network service and how we have evolved our procedures to address those challenges. Finally we will describe our plans for future extensions and improvements to the service.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

ADDS-EVS: An agent-based deployment decision-support system for electric vehicle services

Rapid and sustainable development of the electric vehicle (EV) industry places the requirement for the plan of EV deployment. For public EV, existing models mainly focus on the charging facility design and fail to capture the multi-modal scenarios. In this work, we develop an agent-based decision-support system for multi-modal electric transits to locate the optimal combinations of key parameters, including the fleet size, the transit schedule, the charging facility design, and the routing strategy. We demonstrate the utilities of our system by simulating public EV services deployed to serve travel needs related to a transportation hub in New York City. To support the decision of the fleet size, we summarize system-level performances including the total satisfied demand, passengers' waiting time, vehicle idling time. The spatial and temporal patterns are extracted to serve a deeper understanding of system dynamics and service quality. Finally, we investigate the interaction between the fleet size design and the routing strategy. The results suggest a necessity of integrating the operation strategies into the planning phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Great Plains Wind Energy Transmission Development Project

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

08 HYDROGEN↗

Troffer Retrofits: Northern Arizona University Building Shines with Innovative Lighting Design - Interior Lighting Campaign

This case study describes lighting efficiency measures in Northern Arizona University's Student and Academic Services Building. The building was designed with space-by-space lighting controls to enable scheduling and dimming in offices, conference rooms, and classrooms, and achieved 46% energy savings compared to standard code-compliant lighting.

education, lighting, controls, dimming, classroom,↗

Data Fusion to Enhance Quality Control and Analysis with Instruments at the Marine and Coastal Research Laboratory

Deploying environmental monitoring instruments in the marine environment can be challenging, facing challenges around device survivability, biofouling and corrosion, and consistent data collection. This project explores the use of data fusion – the process of integrating multiple data sources to produce more consistent, accurate, and useful information – to build a consistent long-term monitoring system at the Marine and Coastal Research Laboratory (MCRL) in Sequim, Washington. Unused instruments that had been acquired from past projects were inventoried and deployments planned on the MCRL pier and floating dock. A total of 8 instruments were deployed including a tide gauge, hydrophone, acoustic Doppler current profiler (ADCP), photosynthetically active radiation (PAR) sensors, meteorological station, and three water quality sensors. Deployments were planned to be well-protected around the pier structure and a maintenance schedule was created for cleaning and recalibration. An automated data pipeline was created to aggregate data on edge computers that push data to Amazon Web Services (AWS) cloud storage every 15 minutes, performing automated quality control and data transformations using the Time Series Data Analytical Toolkit (TSDAT). Continued efforts are underway to maintain this system into the future, take a data-driven approach to maintenance scheduling, improve the reliability of the system, and share the data with a variety of end-users.

54 ENVIRONMENTAL SCIENCES↗

Packaging and Transportation Support at LANL CTMA 2012

Operations Support Packaging and Transportation (OS-PT) supports LANL in various functions. Some highlights of the past year have been with the work relating to environmental remediation, type B packaging, non-DOT compliant transfers, and special permit training. The TA-21 remediation project was part of the ARRA funding that LANL received. The $212 million in funding was used to demolish 24 buildings at TA-21, excavate the lab's oldest waste disposal site, and install 16 groundwater monitoring wells. The project was completed ahead of schedule and under budget. More than 300 tons of metal was recycled and all the soil excavated from MDA-B was replaced with clean fill. OS-PT supported this projected by transporting more than 7 million pounds of waste to TA-54 Area G with an addendum to their TSD. Because of the public access on the transfer route, Los Alamos County restricted the transfer to happen from 2:00 AM to 4:00 AM. OS-PT conducted 8 transfers in support of this project. Some concerns included the contaminated trailers at receipt facilities when transferring filled Super Sacks. Future Super Sacks were over packed into new IP-2 Super Sacks before shipping. OS-PT is also supporting the remediation of TA-54 Area G. LANL has an agreement with the State of New Mexico to remove all TRU waste currently stored above ground from at Area G. OS-PT supports this initiative with transfers of TRU waste under LANL's TSD and support of TRU shipments to WIPP. Another project supported by our organization is gas cylinder/dewar recycling and remediation. We are focusing on reducing risk associated with unneeded gasses at LANL. To minimized excessive ordering, to save money and time, and to minimize hazards OS-PT is supporting a gas recycling program. This program will allow programmatic organization across LANL to share unused/unneeded gasses. Instead of old dewars being disposed of, OS-PT has began identifying these dewars and sending them for refurbishment. To date, this effort has saved LANL $450K and estimated saving for future efforts will be more than $1.5 million. Some Projects that are happening here at LANL are offsite source recovery, weapon component transfers, and isotope science production. There are specific packages that help support these projects for the shipment of related materials. OS-PT provides support to these packages to ensure they are and will be available to continue this support. The Areva 435-B Overpack will help the Offsite Source Recovery Project recover high activity gamma sources from various locations across the globe. The Safety Analysis for Packaging is scheduled for initial completion June of 2012. The DPP-1 package is designed to replace the Model FL, which was designed by Rocky Flats and began service in 1990. LANL has collaborated on package design with LLNL, Pantex, Y-12, and KCP. LANL is supporting LLNL on component fixture development. Testing to 10 CFR 71 is to be completed in the Fall of 2012 and scheduled for NA-174 approval in 2014. The SAFESHIELD package helps supports LANL's Isotope production projects. This package can transfer highly irradiated materials from LANL's accelerator to material processing facilities. LANL worked to renew the SAFESHEILD's Certification for 5 more years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gallbladder Volvulus: A Rare Emergent Cause of Acute Cholecystitis, if Untreated, Progresses to Necrosis and Perforation

An 86 year-old woman with a past medical history significant for abdominal hernia and Alzheimer dementia presented to the Emergency Department with a 24 hour history of acute right upper quadrant pain associated with nausea and non-bilious emesis. Physical exam revealed right sided abdominal tenderness with associated mass. All laboratory values were within normal ranges. Both abdominal ultrasound and computed tomography of the abdomen/pelvis revealed a large distended gallbladder with wall thickening and gallstones. Based on presentation and radiologic findings, the emergency general surgery service was consulted for suspected acute cholecystitis. The patient was then admitted for intravenous antibiotics and scheduled for laparoscopic cholecystectomy the following day. Intra-operative findings revealed volvulus with acute necrosis of the entire gallbladder. The gallbladder had a long pedunculated cystic duct and artery that was detorsed before proceeding with resection. Postoperatively, the patient did well and was discharged a few days later tolerating a regular diet.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Project Plan, Status, and Lessons Learned for the LANL 3,706 m{sup 3} TRU Waste Campaign - 13085

The Los Alamos National Laboratory (LANL) is currently engaged in a campaign to disposition 3,706 m{sup 3} of transuranic (TRU) waste stored above grade at its Technical Area 54 (TA-54) Area G waste management facility before June 30, 2014. This campaign includes complete removal of all non-cemented above-grade TRU waste that was in storage on October 1, 2011, and is defined as 3,706 m{sup 3} of material. TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory include two additional oversize box processing lines that are being brought into service as Nuclear Hazard Category III facilities in fiscal year (FY) 2013. Multiple work shifts are scheduled for most remediation lines in FY 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 75 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Other industrial processing practices that have been adopted to improve efficiency include staging of containers for remediation, characterization, and shipping; establishment of a transportation center; and load management practices for transportation payloads. Progress and accomplishments during FY 2012 are reviewed, and plans for FY 2013 are presented in some detail. Lessons learned on adoption of industrial processing practices are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certification of Completion of ASC FY08 Level-2 Milestone ID #2933

This report documents the satisfaction of the completion criteria associated with ASC FY08 Milestone ID No.2933: 'Deploy Moab resource management services on BlueGene/L'. Specifically, this milestone represents LLNL efforts to enhance both SLURM and Moab to extend Moab's capabilities to schedule and manage BlueGene/L, and increases portability of user scripts between ASC systems. The completion criteria for the milestone are the following: (1) Batch jobs can be specified, submitted to Moab, scheduled and run on the BlueGene/L system; (2) Moab will be able to support the markedly increased scale in node count as well as the wiring geometry that is unique to BlueGene/L; and (3) Moab will also prepare and report statistics of job CPU usage just as it does for the current systems it supports. This document presents the completion evidence for both of the stated milestone certification methods: Completion evidence for this milestone will be in the form of (1) documentation--a report that certifies that the completion criteria have been met; and (2) user hand-off. As the selected Tri-Lab workload manager, Moab was chosen to replace LCRM as the enterprise-wide scheduler across Livermore Computing (LC) systems. While LCRM/SLURM successfully scheduled jobs on BG/L, the effort to replace LCRM with Moab on BG/L represented a significant challenge. Moab is a commercial product developed and sold by Cluster Resources, Inc. (CRI). Moab receives the users batch job requests and dispatches these jobs to run on a specific cluster. SLURM is an open-source resource manager whose development is managed by members of the Integrated Computational Resource Management Group (ICRMG) within the Services and Development Division at LLNL. SLURM is responsible for launching and running jobs on an individual cluster. Replacing LCRM with Moab on BG/L required substantial changes to both Moab and SLURM. While the ICRMG could directly manage the SLURM development effort, the work to enhance Moab had to be done by Moab's vendor. Members of the ICRMG held many meetings with CRI developers to develop the design and specify the requirements for what Moab needed to do. Extensions to SLURM are used to run jobs on the BlueGene/L architecture. These extensions support the three dimensional network topology unique to BG/L. While BG/L geometry support was already in SLURM, enhancements were needed to provide backfill capability and answer 'will-run' queries from Moab. For its part, the Moab architecture needed to be modified to interact with SLURM in a more coordinated way. It needed enhancements to support SLURM's shorthand notation for representing thousands of compute nodes and report this information using Moab's existing status commands. The LCRM wrapper scripts that emulated LCRM commands also needed to be enhanced to support BG/L usage. The effort was successful as Moab 5.2.2 and SLURM 1.3 was installed on the 106496 node BG/L machine on May 21, 2008, and turned over to the users to run production.

99 GENERAL AND MISCELLANEOUS↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗