Search NASA⌕ Search

SEARCH · Search NASA

Results for “Secondary Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

The Sun Radio Interferometer Space Experiment (SunRISE) Mission

The Sun Radio Interferometer Space Experiment (SunRISE) will provide an entirely new view on particle acceleration and transport in the inner heliosphere by creating the first low radio frequency interferometer in space to localize heliospheric radio emissions. By imaging and determining the location of decametric-hectometric (DH, 0.1 MHz–23 MHz) solar radio bursts, SunRISE will provide key information on particle acceleration mechanisms associated with coronal mass ejections (CMEs) and the magnetic field topology from active regions into interplanetary space. The SunRISE Observatory will consist of six space vehicles in a passive formation, in orbits designed to keep them within approximately 10 km of each other, and flying in a supersynchronous geosynchronous Earth orbit (GEO). Each space vehicle consists of a Solar DH-GNSS payload and a 6U form factor spacecraft. The SunRISE Observatory together with significant ground-based processing, will enable imaging of the Sun in a portion of the spectrum that is blocked by the ionosphere and cannot be observed from Earth. Key aspects that enable this mission are that only position knowledge of the space vehicles is required, not active control, and that the architecture involves a modest amount of on-board processing coupled with significant ground-based processing for navigation, position determination, and science operations. Mission-enabling advances in software-defined radios, GPS navigation and timing, and small spacecraft technologies, developed and flown on the DARPA High Frequency Research (DHFR) and the Community Initiative for Continuing Earth Radio Occultation (CICERO) have made this mission affordable and low-risk. The SunRISE mission will exploit the multiple spacecraft per aperture (MSPA) capability of NASA’s Deep Space Network (DSN), for more efficient data transfers of larger data volumes, and utilize commercial access to space, in which the SunRISE space vehicles will be carried to their target orbit as secondary payloads in conjunction with a larger host spacecraft intended for GEO.

Neilson, Tim↗

Life Testing of the Hollow Cathode Plasma Contactor for the ProSEDS Mission

The Propulsive Small Expendable Deployer System (ProSEDS) mission is designed to provide an on-orbit demonstration of the electrodynamic propulsion capabilities of tethers in space. The ProSEDS experiment will be a secondary payload on a Delta 11 unmanned expendable booster. A 5-km conductive tether is attached to the Delta 11 second stage and collects current from the low Earth orbit (LEO) plasma. A hollow cathode plasma contactor emits the collected electrons from the Delta II, completing the electrical circuit with the ambient plasma. The current flowing through the tether generates thrust based on the Lorentz Force Law. The thrust will be generated opposite to the velocity vector, slowing down the spacecraft and causing it to de-orbit in approximately 14 days compared to the normal 6 months. A 10-km non-conductive tether is between the conductive tether and an endmass containing several scientific instruments. The ProSEDS mission lifetime was set at I day because most of the primary objectives can be met in that time. The extended ProSEDS mission will be for as many days as possible, until the Delta 11 second stage burns up or the tether is severed by a micrometeoroid or space debris particle. The Hollow Cathode Plasma Contactor (HCPC) unit has been designed for a 12-day mission. Because of the science requirements to measure the background ambient plasma, the HCPC must operate on a duty cycle. Later in the ProSEDS mission, the HCPC is operated in a manner to allow charging of the secondary battery. Due to the unusual operating requirements by the ProSEDS mission, a development unit of the HCPC was built for thorough testing. This developmental unit was tested for a simulated ProSEDS mission, with measurements of the ability to start and stop during the duty cycle. These tests also provided valuable data for the ProSEDS software requirements. Qualification tests of the HCPC flight hardware are also discussed.

Vaughn, Jason A.↗

LEAVES: Lofted Environmental and Atmospheric Venus Sensors

LEAVES (Lofted Environmental Atmospheric Venus Sensors) is a design exercise with the goal of dramatically decreasing the cost of obtaining prioritized chemical and physical data in planetary atmospheres. Through the application of a swarm approach this concept parallelizes atmospheric exploration, with geographic coverage far exceeding what is possible with conventional monolithic platforms or sondes. Each unit in the swarm is exceptionally compact, with a powered payload mass of only a few tens of grams and a high-drag, semi-rigid structure that acts to slow each probe as it descends through the atmosphere. This structural design can collapse into a planar form to allow for efficient stowage prior to arrival at the target body. With a total per-unit mass of only 120 g, a fleet of 100 (or more) units can be very reasonably accommodated on a carrier spacecraft.Science operations, which begin when the LEAVES probes reach an altitude of 100 km, are targeted for the cloud-bearing region of Venus' atmosphere. During the roughly 9 hour, terminal velocity descent through the atmosphere, LEAVES collects data of the state and composition of the atmosphere in parallel across multiple units. These data would represent an unprecedented constraint on the distribution and concentration of targeted chemical species, and the detection of local and regional variations in both chemistry and physical properties.A novel and compelling result of this exercise was that the same optimization that produced a structure with an exceptionally low areal mass density (0.126 kg/m2) also resulted in a probe that can be deployed directly from an aerobraking orbit (~140 km at 5 km/s) without the need for aeroshell protection. This translates to a tremendous mass savings and gives LEAVES the flexibility to be carried as a secondary payload aboard either a descending surface probe or an orbital radar mapper. Because such missions are under active development or have already been proposed (but not flown), we infer that LEAVES is well positioned as a technology

Swarm↗

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

Power Systems Evaluated for Solar Electric Propulsion Vehicles

Solar electric propulsion (SEP) mission architectures are applicable to a wide range NASA missions including the robotic exploration of the outer planets in the next decade and the human exploration of Mars within the next 2 decades. SEP enables architectures that are very mass efficient with reasonable power levels (1-MW class) aerobrake and cryogenic upper-stage transportation technologies are utilized. In this architecture, the efficient SEP stage transfers the payload from low Earth orbit (LEO) High Energy Elliptical Parking Orbit (HEEPO) within a period of 6 to 12 months. highthrust, cryogenic upper stage and payload then separate from the SEP vehicle for injection to the planetary target, allowing for fast heliocentric trip times. This mission architecture offers a potential reduction in mass to LEO in comparison to alternative all-chemical nuclear propulsion schemes. Mass reductions may allow launch vehicle downsizing enable missions that would have been grounded because of cost constraints. The preceding figure illustrates a conceptual SEP stage design for a human Mars mission. Researchers at the NASA Glenn Research Center at Lewis Field designed conceptual SEP vehicle, conceived the mission architecture to use this vehicle, and analyzed the vehicle s performance. This SEP stage has a dry mass of 35 metric tons (MT), 40 MT of xenon propellant, and a photovoltaic array that spans 110 m, providing power to a cluster of eight 100-kW Hall thrusters. The stage can transfer an 80-MT payload and upper stage to the desired HEEPO. Preliminary packaging studies show this space-station-class SEP vehicle meets the proposed "Magnum" launch vehicle and volume requirements with considerable margin. An SEP vehicle for outer planetary missions, such as the Europa Mapper Mission, would be dramatically smaller than human Mars mission SEP stage. In this mission architecture, the SEP power system with the payload to provide spacecraft power throughout the mission. Several photovoltaic array design concepts were considered for the SEP vehicle power system for the human mission to Mars. These include a space station derivative, a SCARLET (Solar Concentrator Arrays with Refractive Linear Element Technology) derivative, and a hybrid inflatable-deployable thin polymer membrane array with thin-film solar cells (as shown in the concept illustration). This concept is based on a design developed for the Next Generation Space Telescope Sun shield. The array is divided into 16 independent electrical sections with 500-V, negative-grounded solar cell strings. The power system employs a channelized, 500-Vdc power management and distribution (PMAD) architecture with lithium ion batteries for energy storage for vehicle and payload secondary loads (the high-power Hall thrusters do not operate in eclipse periods). The 500-V PMAD voltage permits "direct-drive" thruster operation, greatly reducing the power processing unit size, complexity, and power loss. Similar power system architecture, designs, and technology are assumed for the Europa Mapper Mission SEP vehicle. The primary exceptions are that the photovoltaic array is assumed to consist of two rectangular wings and that the power system rating is 15 kW in Earth orbit and 200 W at Europa. To size the SEP vehicle power system, a dedicated Fortran code was developed to predict detailed power system performance, mass, and thermal control requirements. This code also modeled all the relevant Earth orbit environments; that is, the particulate radiation, plasma, meteoroids and debris, ultraviolet radiation, contamination, and thermal conditions. Analysis results for the Human Mars Mission SEP vehicle show a power system mass of 9-MT and photovoltaic array area of 5800-square meters for the thin-membrane design concept with CuInS2 thin-film cells. Power processing unit input power for a thin-membrane array design with three-junction, amorphous SiGe solar cells is shown in the graph. Power falls off rapidly inhe first weeks of the mission because of light-induced (Staebler-Wronksi) solar cell losses. During the next 200 days, power decreases steadily as the SEP stage spirals through the proton belts and sustains the bulk of the mission radiation damage. Once the vehicle apogee is above approximately four Earth radii, little additional degradation is incurred. From 400 to 800 days, a 1100-km "parking" orbit is maintained to await the next payload transfer opportunity. This orbit is below the main proton belt, and thus, little radiation dose is accumulated during this time period. During the second LEO-to-HEEPO transfer, power degrades somewhat further, but power requirements are still met. In comparison, the Europa Mapper SEP vehicle power system had a mass of 150 kg and a thin membrane array area of 100 square meters.

Kerslake, Thomas W.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

A concept study of a remotely piloted vehicle for Mars exploration

Candidate configurations are discussed for shuttle-transported, spacecraft-deployed remotely piloted vehicles having individual aeroshells, parachutes, and scientific payloads for Mars exploration. Topics covered include aerodynamics; powerplants; structural materials; deployment and descent interface systems; payloads; secondary power; thermal control; navigation, guidance and control, communications, weight and center of gravity; performance; and flight testing. The advantages of the recommended electric-powered cruiser/lander configuration are summarized.

Source record↗

Modular experimental platform for science and applications

A modularized, standardized spacecraft bus, known as MESA, suitable for a variety of science and applications missions is discussed. The basic bus consists of a simple structural arrangement housing attitude control, telemetry/command, electrical power, propulsion and thermal control subsystems. The general arrangement allows extensive subsystem adaptation to mission needs. Kits provide for the addition of tape recorders, increased power levels and propulsion growth. Both 3-axis and spin stabilized flight proven attitude control subsystems are available. The MESA bus can be launched on Ariane, as a secondary payload for low cost, or on the STS with a PAM-D or other suitable upper stage. Multi-spacecraft launches are possible with either booster. Launch vehicle integration is simple and cost-effective. The low cost of the MESA bus is achieved by the extensive utilization of existing subsystem design concepts and equipment, and efficient program management and test integration techniques.

Hill, A. S.↗

Lightsats and their attraction to budget oriented Federal agencies

The term Lightsats refers to low volume, low mass, low Earth orbit, satellites suitable for launch from Get Away Special canisters, or as secondary payloads on expendable launch vehicles. New or existing technology that offers potential to improve the safety, capacity and efficiency of the National Airspace System is discussed. The discussion is presented from the point of view of an individual within a government agency who wants to see a new technology to enhance the mission of that agency.

Bonsall, Charles A.↗

Early tether dynamics flight experiments

This paper proposes an evolutionary series of tether-dynamics flight experiments using the Small Expendable Deployer System (SEDS). Such experiments could be launched as secondary payloads on the Delta ELV. The purpose of the series of experiments is to acquire data on tether deployment rate, tension, tether shape, and operating environment to compared with computer-based tether simulations. A second purpose is to serve as a precursor for the Orbiter-based SEDS, since both the tether deployer and the flight profile are similar. Additional flights could observe tether dynamics over a much wider range of operational and environmental conditions and could employ more comprehensive measurements.

Rupp, Charles C.↗

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is scheduled as the secondary payload of a Delta II in late 1992. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. A series of tests will be performed to exercise the software modules which make up the Mission Software of the SEDS Data System. These tests will be performed by using a SEDS Signal Simulator to generate signals which will simulate the inputs normally produced by sensors and circuits in the SEDS system. The SEDS Signal Simulator will be used in the debugging and in the formal verification of the SEDS1 Mission Software. The Simulator will not only emulate normal flight conditions but also exercise all modules written to handle anticipated anomalous flight conditions, conditions that would be difficult to reproduce and control with actual SEDS hardware. The simulator will help to expedite software development and to increase the confidence of the users of the Mission Software. With little modification, the Simulator should be useful in the software development of future SEDS flights.

Pierson, William E.↗

Small experiments for the maturation of orbital cryogenic transfer technologies

The no-vent method is a promising approach to handling the problems of low-g venting during propellant transfer. A receiver tank is first cooled to remove thermal energy from the tank wall and the resultant vapor vented overboard. The nozzles mix the incoming liquid and residual vapor in the tank maintaining a thermodynamic state which allows the tank to fill with liquid without venting. Ground based testing at NASA Lewis Research Center (LeRC) has demonstrated the no-vent fill process and attempted to bound its low-gravity performance. But, low-gravity testing is required to validate the method. As an alternative to using a dedicated spacecraft for validation, several small scale experiments to study no-vent fill in low-g were formulated. Cost goals quickly limited the search to two possibilities: a secondary payload on the space shuttle, or a small scale sounding rocket experiment. The key issues of small scale experimentation are discussed, and a conceptual design of a sounding rocket experiment with liquid hydrogen for studying the fill process is presented.

Chato, David J.↗

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is schedule to fly as the secondary payload of a Delta 2 in March, 1993. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. SEDS1 will deploy a 50 lb. instrumented satellite as an end mass using a 20 km tether. Langley Research Center is providing the end mass instrumentation, while the Marshall Space Flight Center is designing and building the deployer. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on the application of a brake, and cut the tether at the proper time after it swings to the local vertical. Also, SEDS1 will collect data which will be used to test the accuracy of tether dynamics models used to stimulate this type of deployment. The experiment will last about 1.5 hours and complete approximately 1.5 orbits. Radar tracking of the Delta II and end mass is planned. In addition, the SEDS1 on-board computer will continuously record, store, and transmit mission data over the Delta II S-band telemetry system. The Data System will count tether windings as the tether unwinds, log the times of each turn and other mission events, monitor tether tension, and record the temperature of system components. A summary of the measurements taken during the SEDS1 are shown. The Data System will also control the tether brake and cutter mechanisms. Preliminary versions of two major sections of the flight software, the data telemetry modules and the data collection modules, were developed and tested under the 1990 NASA/ASEE Summer Faculty Fellowship Program. To facilitate the debugging of these software modules, a prototype SEDS Data System was programmed to simulate turn count signals. During the 1991 summer program, the concept of simulating signals produced by the SEDS electronics systems and circuits was expanded and more precisely defined. During the 1992 summer program, the SEDS signal simulator was programmed to test the requirements of the SEDS Mission software, and this simulator will be used in the formal verification of the SEDS Mission Software. The formal test procedures specification was written which incorporates the use of the signal simulator to test the SEDS Mission Software and which incorporates procedures for testing the other major component of the SEDS software, the Monitor Software.

Pierson, William E.↗

Hitchhiker: Customer Accommodations and Requirements Specifications (CARS)

In 1984, NASA Headquarters established projects at the Goddard Space Flight Center (GSFC) and the Marshall Space Flight Center (MSFC) to develop quick-reaction carrier systems for low-cost 'flight of opportunity' or secondary payloads on the Space Transportation System (STS). One of these projects is the Hitchhiker (HH) Program. GSFC has developed a family of carrier equipment known as the Shuttle Payload of Opportunity Carrier (SPOC) system for mounting small payloads such as HH to the side of the Orbiter payload bay. The side-mounted HHs are referred to as Hitchhiker-G (HH-G). MSFC developed a cross-bay 'bridge-type' carrier structure called the Hitchhiker-M (HH-M). In 1987, responsibility for the HH-M carrier was transferred to and is now managed by the HH Project Office at the GSFC. The HH-M carrier now uses the same interchangeable SPOC avionics unit and the same electrical interfaces and services developed for HH-G. National Aeronautics and Space Administration (NASA) has created this document to acquaint potential HH system customers with the facilities NASA provides and the requirements which customers must satisfy to use these facilities. This publication defines interface items required for integrating customer equipment with the HH carrier system. Those items such as mounting equipment and electrical inputs and outputs; configuration, environmental, command, telemetry, and operational constraints are described as well as weight, power, and communications. The purpose of this publication is to help the customer understand essential integration documentation requirements and to prepare a Customer Payload Requirements (CPR) document.

Source record↗

Small experiments for the maturation of orbital cryogenic transfer technologies

The no-vent fill method is a promising approach to handle the problems of low-g venting during propellant transfer. A receiver tank is first cooled to remove thermal energy from the tank wall and the resultant vapor vented overboard. Then nozzles mix the incoming liquid and residual vapor in the tank maintaining a thermodynamic state which allows the tank to fill with liquid without venting. Ground based testing at NASA Lewis Research Center (LeRC) has demonstrated the no-vent fill process and attempted to bound its low-gravity performance. But, low-gravity testing is required to validate the method. As an alternative to using a dedicated spacecraft for validation the authors have formulated several small scale experiments to study no-vent fill in low-g. Cost goals quickly limited the search to two possibilities: a secondary payload on the Space Shuttle, or a small scale sounding rocket experiment. This paper will discuss the key issues of small scale experimentation and present a conceptual design of a sounding rocket experiment with liquid hydrogen for studying the fill process.

Chato, David J.↗

Endeavour's arduous maiden voyage - STS-49

The Space Shuttle Orbiter Endeavour undertook its maiden mission (STS-49) on May 7, 1992, exactly one year after its arrival at the Kennedy Space Center, in order to attach a perigee 'kick-motor' to the Intelsat-VI communications satellite which would carry it from the LEO where it was marooned to GEO. Endeavour's secondary payload was the Assembly of Space Station by Extravehicular Methods experiment. A log is here presented of STS-49.

Schuiling, Roelof↗