Search NASA⌕ Search

SEARCH · Search NASA

Results for “Software Installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Software defined grid energy storage

Today, consumer battery installations are isolated, physical devices. Virtual power plants (VPPs) allow consumer devices to aggregate for grid services, but they are are vertically integrated, vendor controlled systems (e.g., Tesla’s VPP). Consumer batteries are therefore unable to participate in energy markets or other grid services outside what their vendor provides. We describe a software system that provides software control of multiple, networked battery energy storage systems in the electric grid. The system introduces two new ideas that enable flexible and dependable management of energy storage. The first is a virtual battery, which can either partition a battery or aggregate multiple batteries. The second is a reservation-based API which allows asynchronous control of batteries to meet contractual guarantees in a safe and dependable manner. Virtual batteries and a reservation-based API address the unique challenges of achieving high and efficient utilization of energy storage systems, including heterogeneity of battery systems such as varying C-rates, participation in energy markets, utility bill management systems, community resource sharing, and reliability. Using a testbed comprised of sonnen Inc. storage units installed in several homes and a lab, we demonstrate that virtualized batteries can seamlessly replace physical batteries, flexibly manage energy storage resources, isolate multiple clients using a shared battery, and create new energy storage applications.

25 ENERGY STORAGE↗

The MCNPTools Package: Installation and Use

MCNPTools is a C++ software library bound to Python (2 & 3) via the Simplified Wrapper and Interface Generator (SWIG version 3.0.7). The report lists the minimum build requirements and the compiler options that are currently tested and supported.

97 MATHEMATICS AND COMPUTING↗

Simple, Secure, Internet Delivery of MOOSE-based Applications

Application packaging and distribution are the final steps for delivering software to end-users; both are frequently neglected when creating scientific software. Commercial businesses rely on electronic distribution systems that have rendered disk drives obsolete. Still, national laboratories continue to rely heavily on removable media to distribute and limit access to controlled applications. With increasing concerns of unauthorized copying of sensitive applications, a modern distribution system that utilizes cryptographically secure communication and authentication protocols has been developed. This new distribution system will secure the chain of custody for nuclear software while simultaneously simplifying access to these tools. This report summarizes four primary advancements made toward the secure distribution of Nuclear Energy Advanced Modeling and Simulation (NEAMS)-developed, Multiphysics Object Oriented Simulation Environment (MOOSE)-based applications: application installation, package distribution, automated package building, and distribution of documentation. NEAMS is currently developing more than ten separate applications based on the open-source MOOSE Framework. Distribution of these applications has primarily been accomplished by distributing source code, with end-users compiling the applications themselves. This work created a mechanism where MOOSE applications can be installed in a similar way to any other software. This allows both administrators and end-users simplified access to runnable executables. With this new installation capability, it was then possible to rethink distribution. A new, secure capability for delivering MOOSE-based applications over the internet has been created. This system requires unique cryptographic tokens for authentication, greatly securing the custody chain for software. Once granted access, installation of any NEAMS code can be accomplished with these terminal commands: "conda install ncrc" "ncrc install ncrc-bison." After these two commands (and authenticating) the BISON application will be securely down- loaded from Idaho National Laboratory (INL)’s servers, installed, and ready to use. To enable this new distribution capability to be successful, the open-source Continuous Integration, Verification, Enhancement, and Testing (CIVET) Continuous Integration (CI) capability was augmented to add Continuous Delivery (CD). CD enables the automated building and packaging of MOOSE-based applications as they are modified by development teams, ensuring that our customers can obtain up-to-date versions of the software at any time. The need for instruction on how to use these applications was addressed through modifications to the MOOSE documentation system. The MooseDocs capability, which enables robust documentation of MOOSE-based applications, has been extended to allow both for the installation of documentation and the packaging of documentation with installed applications. Together, these enhancements form the core of a new, secure distribution mechanism for nuclear simulation tools. In concert with the Nuclear Computational Resource Center (NCRC), NEAMS- developed applications will now be straightforward to obtain securely.

97 MATHEMATICS AND COMPUTING↗

FAST-1.0.1 User Installation and Verification Guide

The purpose of this document is to provide the user information about the installation of FAST-1.0.1 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0.1. Self-service oriented FAST-1.0.1 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.0.1 and described in Section 3.0. A convenience script for converting FRAPCON to FAST inputs is discussed in Section 4.0. FAST-1.0.1 was developed and released under a software quality assurance program based upon NQA-1-2017. FAST-1.0.1 is the latest baseline code and the result of a bug fixes to FAST-1.0 with other software and methodology developments. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs). Capability to model accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss Of Coolant Accidents (LOCAs), are targeted for a later release of FAST. FRAPTRAN-2.0 will continue to be used for accident conditions until the release of FAST with accident condition modeling capabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Energy-Efficient and Comfortable Buildings through Multivariate Integrated Control (ECoMIC)

This project aims to develop an integrated control solution for enhanced energy efficiency and user comfort in commercial buildings. The developed technology is a zone-based control framework that minimizes energy usage while maintaining occupants’ visual and thermal comfort through control of electric lights, motorized venetian blinds and thermostats. The control framework is designed following a modular, scalable and flexible architecture to facilitate easy integration with exiting building management systems. The control framework contains two key algorithms: 1) the lighting load balancing algorithm and 2) the thermostat control algorithm. The lighting load balancing algorithm adopts a model-based closed-loop control approach to determine the optimal electric light and venetian blind settings. It is formulated into an optimization problem with minimizing lighting-related energy consumptions as the objective and delivering adequate task light and preventing daylight glare as the constraints. The thermostat control algorithm is based on a well-established thermal comfort model and formulated as a root-finding problem to dynamically determine the optimal thermostat setpoint for both energy savings and improved thermal comfort. To address building-wide scalability, a system architecture was developed for the zone-based control technology. Three levels of services are defined in the architecture: external services, facility level services and zone level services. The zone-level service includes the control algorithms described above as well as the corresponding interfaces, profiles, sensors and actuators to realize the zone controller. The facility level services connect to the zones through a backbone network, handle supervisory level information and controls, and thus facilitate building-wide scalability. The external services provide communication capability to entities outside of the building for grid interaction and remote access. Various aspects of the developed control technology were evaluated and verified through both simulations and testbed implementations. Simulations coupling a DOE medium office reference building in EnergyPlus building simulation software and a prototype controller in Matlab were performed. During summer time in a mixed-humid climate zone, the simulations revealed reductions of 27% and 42% in electric lighting load and cooling load, respectively, when compared to an advanced base case with daylight dimming and blinds automatically tilted to block direct sun. Two single-room testbeds were established. The testbed at Philips Lighting business building (Rosemont, IL) was designed for quantifying energy performance of integrated controls. This particular implementation achieved 40% and 79% savings on lighting and HVAC energy, respectively, compared to a relatively simple base case operated on predefined schedules. While the resulting energy savings was very encouraging, it should be noted that there may be several caveats associated with it. 1) The test was run during late spring and early summer, and the savings numbers might not be directly used to extrapolate the annual energy savings. 2) Due to the needs for separate control and metering of the small-scale demonstrator within a large building, the HVAC system, hence the corresponding savings, did not represent a typical energy code-compliant design. 3) The light level in the control case was regulated at a particular setpoint, which was lower than then the full-on light level in the base case, and the savings resulted from tuning down the light level to the setpoint was not attributable to the contribution of the developed technology. The testbed at the Lawrence Berkeley National Laboratory (Berkeley, CA) specifically focused on glare control integration, and has demonstrated the feasibility and capability of the glare detection and prevention technique. While the short one-month test in this testbed provided a functional indication of the developed technology, and it would require at least a full solstice-to-solstice cycle to ruinously quantify the performance, which was not possible within the project timeframe. There are certain limitations inherited from the operational assumptions, which could potentially affect the effectiveness and applicability of the developed control technologies. The system takes a typical ceiling-mounting approach for the photosensor locations, and therefore, the control performance relies on proper commissioning or the built-in intelligence of the photosensor for pertinent task light level estimations. For spaces where daylight penetration diminishes significantly deeper into the zone, certain modification to the control algorithms is required to accommodate multiple lighting control subzones and the corresponding sensors for providing a more uniform light level across the entire zone. Integrated control of visual and thermal comfort requires the lighting control zone and thermal control zone to coincide with each other. In other words, the area illuminated by a lighting circuit needs to be the same area served by the thermostat. Thus, the original zoning will potentially constrain the applicability of this technology in retrofitting projects. This project demonstrated the technical feasibility of a zone-based integrated control technology. From the simulation results and testbed implementations, up to 60% lighting energy savings in daylit areas relative to a “no-controls” case can easily be achieved. A 20% reduction of whole building energy consumption is also attainable. In the aspect of occupant comfort, the testbed demonstrated the ability to maintain specified light level on the workplane while promptly mitigate daylight glare 90% of the time. The control system also managed to maintain the thermal environment at a comfortable level 90% of the time. The aspect of system scalability was guaranteed by the system architecture design, based on which the testbeds were instantiated. Analysis on the aspect of economic benefit has yielded an about 6-year payback time for a medium-sized building, including the installation of all hardware and software, such as motorized blinds and LED luminaires. The payback time can be significantly reduced if part of the hardware is already in place for retrofitting projects. It needs to be noted that since the payback analysis was partly based on the testbed performance results, it is constrained by the caveats associated with the testbed implementations. The main uncertainty lies in the contribution from the space conditioning energy savings as it was non-trivial to realistically configure a room-size HVAC system for directly extrapolating whole-building HVAC energy savings. It is recommended to further evaluate the developed technology at a larger scale, where the lighting and HVAC energy consumption can be realistically measured at the building level, to more rigorously quantify the performance potentials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Logistics Process Analysis ToolProcess Analysis Tool

LPAT is the resulting integrated system between ANL-developed Enhanced Logistics Intra Theater Support Tool (ELIST) sponsored by SDDC-TEA and the Fort Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the process Anlysis Tool (PAT) which evolved into a stand=-along tool for detailed process analysis at a location. Combined with ELIST, an inter-installation logistics component was added to enable users to define large logistical agent-based models without having to program. PAT is the evolution of an ANL-developed software system called Fort Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the Process Analysis Tool(PAT) which evolved into a stand-alone tool for detailed process analysis at a location (sponsored by the SDDC-TEA).

Source record↗

Development of a Versatile, Full-featured Search Functionality for Indico

Indico, CERN’s popular open-source tool for event management, is in widespread use among facilities that make up the HEP community. It is extensible through a robust plugin architecture that provides features such as search and video conferencing integration. In 2018, Indico version 2 was released with many notable improvements, but without a full-featured search functionality that could be implemented easily outside of CERN. At both Fermi and Brookhaven National Laboratories, the user community viewed the lack of this popular feature as a significant impediment to deployment of the new software. In the meantime, CERN embarked upon a major redesign of their core search service, one that would also necessitate a rewrite of the Indico search interface. Seeing this pressing need, the two US labs decided to collaborate, with assistance from the CERN development team, on a project to develop the requisite search functionality for the larger user community. The resulting design exploits the simplified schema defined in the new CERN Search micro-service, based on Invenio and Elasticsearch, while still providing a flexible path to implementation for alternative backend search services. It is intended to provide a software package that can be installed easily and used out of the box, by anyone at any site. This paper will discuss the design choices and architectural challenges, and provide an overview of the deployment and use of these new plugins.

Constanta, Penelope↗

Charge changing cross-sections for 300 A MeV Fe{sup 26+} ion beam in Al target

In the present study, total and partial charge changing cross-sections of 300 A MeV Fe{sup 26+} ion beam in Al target were measured. The CR39 nuclear track detectors were used to identify the incident charged particles and their fragments using an automated image analyzer system installed with Leica QWin Plus software. The measured value of the total charge changing cross-section is {sigma}{sub tot}= (1663 {+-} 236) mb.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

WE-D-204-03: A Six-Year Longitudinal Evaluation of the DICOM GSDF Conformance Stability of LCD Monitors

Purpose: The calibration of monitors in radiology is critical to ensure a standardized reading environment. If left unchecked, monitors initially calibrated to follow the DICOM Grayscale Standard Display Function (GSDF) can fall out of calibration. This work presents a quantitative evaluation of the stability of a cohort of monitors with similar deployment times and clinical utilization. Methods: Fifty-four liquid crystal display (LCD) monitors (NEC L200ME) were deployed for clinical use in 2009. At that time, a subset of eight of these monitors were used to generate a look-up table (LUT) using the open-source software pacsDisplay. The software was used to load the LUT to the graphics card of the computer in order to make the monitors compliant with the GSDF. The luminance response of the monitors was evaluated twice over six years, once in 2011 and again in 2015. Results: As expected, the maximum luminance of the monitors decreased over time, with an average reduction from 2009 of 35% in 2011, and 53% in 2015. The luminance ratio (maximum luminance divided by the minimum) also decreased, with the all of the decrease occurring in the first two years (average 20%). There was an overall increase in relative error compared with the DICOM GSDF from measurement to measurement, indicating that deviation from the GSDF increases with monitor luminance reduction. Along with changes in luminance, several other issues were identified during the testing, including non-uniformities, bad pixels, and missing calibration software. Conclusion: From the initial installation of these monitors, most of the degradation occurred during the first two years, highlighting the importance of routine clinical testing of displays. Following such quality assurance, displays could be either re-calibrated or replaced depending on different thresholds. In addition, other issues not related to luminance could be identified and corrected.

60 APPLIED LIFE SCIENCES↗

AMG2023

The AMG2023 benchmark solves two diffusion problems with a linear solver preconditioned with algebraic multigrid. The code only contains a driver, a Makefile, and a documentation file. It requires an installation of the open source software library hypre that needs to be downloaded elsewhere and is not included here. Its purpose is to benchmark linear solver performance on high performance computers.

Li, Ruipeng↗

MAPSTER

MAPSTER Observer is a light-weight software package that can be installed on field deployed computers which automatically manages data and creates metadata packages designed to organize large datasets, making them easy to retrieve and share.

Larson, MatthewD↗

Annual Site Environmental Report: 2010 (ASER)

This report provides information about environmental programs during the calendar year of 2010 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that overlap the calendar year - i.e., stormwater monitoring covering the winter season of 2010/2011 (October 2010 through May 2011) are also included. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2010, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. During 2010, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued. The following are among SLAC's environmental accomplishments for 2010. To facilitate management and identification of future potential greenhouse gases (GHG) reduction opportunities, SLAC voluntarily completed GHG inventories for calendar year (CY) 2008 and CY 2009 and submitted the results to The Climate Registry. A Lead Management Plan was completed to reduce the potential of lead impacting the environment, and two large legacy tube-trailer modules, each containing 38 tubes of compressed ethane, were reused or recycled by an outside contractor, resulting in hazardous waste avoidance and cost savings of approximately $100,000 in transportation and disposal costs. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in GHG emissions. Phase I of the SLAC Advanced Metering project for electrical and natural gas systems was completed. Phase I included the design of the metering system and purchase of the enterprise software. The planning, design, and installation of an advanced water metering system for select buildings, landscape, and process systems were completed. In addition, the last major onsite chiller containing a Class I ozone-depleting substance was taken out of service, and SLAC continued to replace conventional vehicles with electric vehicles. In 2010, there were no radiological impacts to the public or the environment from SLAC operations. The potential doses to the public were negligible and far below the regulatory and SLAC administrative limits. No radiological incidents occurred that increased radiation levels to the public or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC shipped 2,891 cubic feet of low-level radioactive waste, half of which was legacy waste, to appropriate treatment and disposal facilities for low-level radioactive waste. SLAC also continued its efforts to reduce the inventory of materials no longer needed for its mission by permanently removing 125 sealed radioactive sources from the inventory. Ninety-seven of the sealed sources were returned to the manufacturer, and 28 were sent to Energy Solutions for processing before being sent to the Nevada Test Site for burial. In addition, 87 concrete blocks which had been stored in an area known as the Bone Yard were surveyed for potential surface contamination and volumetric activation prior to off-site release. Based on the comprehensive measurements, all 87 blocks were qualified for release and were disposed of as ordinary materials at a landfill. In 2010, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Release Notes for Whisper-1.1

Whisper is a statistical analysis package developed in 2014 to support nuclear criticality safety (NCS) validation [1-3]. It uses the sensitivity profile data for an application as computed by MCNP6 [4-6] along with covariance files [7,8] for the nuclear data to determine a baseline upper-subcritical-limit (USL) for the application. Whisper version 1.0 was first developed and used at LANL in 2014 [3]. During 2015-2016, Whisper was updated to version 1.1 [9] and is to be included with the upcoming release of MCNP6.2. This document describes the Whisper-1.1 package that will be included with the MCNP6.2 release during 2017. Specific details are provided on the computer systems supported, the software quality assurance (SQA) procedures, installation, and testing. This document does not address other important topics, such as the importance of sensitivity-uncertainty (SU) methods to NCS validation, the theory underlying SU methodology, tutorials on the usage of MCNP-Whisper, practical approaches to using SU methodology to support and extend traditional validation, etc. There are over 50 documents included with Whisper-1.1 and available in the MCNP Reference Collection on the MCNP website (mcnp.lanl.gov) that address all of those topics and more. In this document, however, a complete bibliography of relevant MCNP-Whisper references is provided.

97 MATHEMATICS AND COMPUTING↗

Development of a Versatile, Full-Featured Search Functionality for Indico [Slides]

Indico, CERN's popular open-source tool for event management, is in widespread use among facilities that make up the HEP community. It is extensible through a robust plugin architecture that provides features such as search and video conferencing integration. In 2018, Indico version 2 was released with many notable improvements, but without a full-featured search functionality that could be implemented easily outside of CERN. At both Fermi and Brookhaven National Laboratories, the user community viewed the lack of this popular feature as a significant impediment to deployment of the new software. In the meantime, CERN embarked upon a major redesign of their core search service, one that would also necessitate a rewrite of the Indico search interface. Seeing this pressing need, the two US labs decided to collaborate, with assistance from the CERN development team, on a project to develop the requisite search functionality for the larger user community. The resulting design exploits the simplified schema defined in the new CERN Search micro-service, based on Invenio and Elasticsearch, while still providing a flexible path to implementation for alternative backend search services. It is intended to provide a software package that can be installed easily and used out of the box, by anyone at any site. This presentation will discuss the design choices and architectural challenges, and provide an overview of the deployment and use of these new plugins.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Cosmogenic background rejection for the sterile neutrino search with the Short-Baseline Neutrino Program Far Detector

As the Short-Baseline Neutrino Program Far Detector, the ICARUS liquid argon time-projection chamber will operate at shallow depth and therefore be exposed to the full surface flux of cosmic rays. This poses a problematic background to the sterile neutrino search. A direct way to reject this background is to surround the cryostat with a detector capable of tagging incident cosmic muons with high efficiency, the Cosmic Ray Tagging System (CRT). I have worked to develop the CRT detector hardware and the simulation and reconstruction software. This system, currently undergoing installation, is approximately 25% commissioned and taking data. I have developed a powerful method for cosmogenic background rejection utilizing the CRT and Photon Detection System. Results from a simulation based study, informed by CRT data, demonstrate the power of the technique in rejecting cosmogenic events with little adverse impact on the neutrino sample.

Hilgenberg, Christopher Michael↗

Darlington tritium removal facility and station upgrading plant dynamic process simulation

Ontario Power Generation Nuclear (OPGN) has a 4 x 880 MWe CANDU nuclear station at its Darlington Nuclear Div. located in Bowmanville. The station has been operating a Tritium Removal Facility (TRF) and a D{sub 2}O station Upgrading Plant (SUP) since 1989. Both facilities were designed with a Distributed Control System (DCS) and programmable logic controllers (PLC) for process control. This control system was replaced with a DCS only, in 1998. A dynamic plant simulator was developed for the Darlington TRF (DTRF) and the SUP, as part of the computer control system replacement. The simulator was used to test the new software, required to eliminate the PLCs. The simulator is now used for operator training and testing of process control software changes prior to field installation. Dynamic simulation will be essential for the ITER isotope separation system, where the process is more dynamic than the relatively steady-state DTRF process. This paper describes the development and application of the DTRF and SUP dynamic simulator, its benefits, architecture, and the operational experience with the simulator. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ReSS: Resource Selection Service for National and Campus Grid Infrastructure

The Open Science Grid (OSG) offers access to around hundred Compute elements (CE) and storage elements (SE) via standard Grid interfaces. The Resource Selection Service (ReSS) is a push-based workload management system that is integrated with the OSG information systems and resources. ReSS integrates standard Grid tools such as Condor, as a brokering service and the gLite CEMon, for gathering and publishing resource information in GLUE Schema format. ReSS is used in OSG by Virtual Organizations (VO) such as Dark Energy Survey (DES), DZero and Engagement VO. ReSS is also used as a Resource Selection Service for Campus Grids, such as FermiGrid. VOs use ReSS to automate the resource selection in their workload management system to run jobs over the grid. In the past year, the system has been enhanced to enable publication and selection of storage resources and of any special software or software libraries (like MPI libraries) installed at computing resources. In this paper, we discuss the Resource Selection Service, its typical usage on the two scales of a National Cyber Infrastructure Grid, such as OSG, and of a campus Grid, such as FermiGrid.

99 GENERAL AND MISCELLANEOUS↗