Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A highly reliable RAID system based on GPUs.

While RAID is the prevailing method of creating reliable secondary storage infrastructure, many users desire more flexibility than offered by current implementations. To attain needed performance, customers have often sought after hardware-based RAID solutions. This talk describes a RAID system that offloads erasure correction coding calculations to GPUs, allowing increased reliability by supporting new RAID levels while maintaining high performance.

99 GENERAL AND MISCELLANEOUS↗

Autonomous Energy Systems: Building Reliable, Resilient, and Secure Electrified Communities

Technological changes across energy systems are forcing utilities and operators to reconsider their methods for managing power delivery, but few operators have adopted advanced controls and operational software. Their challenge is that every system has peculiar requirements, and the available solutions are relatively new, untested, and difficult to integrate into an operational environment. Through extensive collaboration with utilities and cooperatives, the National Renewable Energy Laboratory has realized the need for autonomous and optimized management of energy resources, leading to the development of Autonomous Energy Systems, a packaged set of controls that is ready to be integrated into existing control rooms.

automation↗

A Dirichlet reputation system in reliable routing of wireless ad hoc network

Ad hoc networks are very helpful in situations when no fixed network infrastructure is available, such as natural disasters and military conflicts. In such a network, all wireless nodes are equal peers simultaneously serving as both senders and routers for other nodes. Therefore, how to route packets through reliable paths becomes a fundamental problems when behaviors of certain nodes deviate from wireless ad hoc routing protocols. We proposed a novel Dirichlet reputation model based on Bayesian inference theory which evaluates reliability of each node in terms of packet delivery. Our system offers a way to predict and select a reliable path through combination of first-hand observation and second-hand reputation reports. We also proposed moving window mechanism which helps to adjust ours responsiveness of our system to changes of node behaviors. We integrated the Dirichlet reputation into routing protocol of wireless ad hoc networks. Our extensive simulation indicates that our proposed reputation system can improve good throughput of the network and reduce negative impacts caused by misbehaving nodes.

99 GENERAL AND MISCELLANEOUS↗

Reliability modeling in a predictive maintenance context: A margin-based approach

Current system reliability methods (typically based on fault trees or reliability block diagrams) can effectively propagate reliability data from the asset to the system level in order to identify system critical points. However, employed asset reliability data are an approximated integral representation of the past industrywide operational experience, and they neglect the present asset health status (available, for example, from online monitoring data and diagnostic assessments) and forecasted health projection (when available from prognostic models). Asset health should be informed solely by that specific asset’s current and historical performance data and should not be an approximated integral representation of the past industrywide operational experience (as currently performed by system reliability models through Bayesian updating processes). Sensor data, diagnostic assessments, and prognostic assessments are in fact not considered in plant reliability models used to inform system engineers on the most critical assets. In addition, the propagation of quantitative health data from the asset to the system level is a challenge given the diverse nature and structure of health data elements (e.g., vibration spectra, temperature readings, expected failure time). Ideally, in a predictive maintenance context, system reliability models should support decision making by propagating available health information from the asset to the system level in order to provide a quantitative snapshot of system health and identify the most critical assets. Here, this paper is directly addressing these two goals by proposing a different approach for reliability modeling that relies on asset diagnostic and prognostic assessments, along with monitoring data to measure asset health. The propagation of health data from the asset to the system level is performed through fault tree models not in probability terms, but in terms of margin where margin is the “distance” between the present status and an undesired event (e.g., failure or unacceptable performance). Through a cause-effect lens, while classical reliability models target the effect associated with asset performance, a margin-based approach focuses on the cause of an undesired asset performance (i.e., its health). Hence, thinking of reliability in terms of margins implies decision-making based on causal reasoning. We will show how fault tree models can be solved using a margin language and how this process can effectively assist system engineers to identify the most critical assets.

97 - MATHEMATICS AND COMPUTING↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Application of Manufacturing Quality Management Principles to PV System Installations

To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.

14 SOLAR ENERGY↗

Impact of system parameters and geospatial variables on the reliability of residential systems with PV and energy storage

A reliable power supply is the foundation of modern society, enabling technologies used to function within a society. Residential systems are places where the end users directly consume power, enabling technologies to sustain life. With the emergence of behind-the-meter resources, the end-users have some control over power supply reliability. The intermittency and variability of these resources impact residential system reliability. In this work, we study the reliability performance of a grid-supplemented residential system with behind-the-meter Distributed Energy Resources(DER) subject to various system parameters and geospatial variables. We propose a multistate reliability model for the behind-the-meter microinverter-based Photo Voltaic (PV) system and integrated inverter-based energy storage (ES) system. A sequential Monte Carlo method is then presented to evaluate the reliability indices for the residential system with behind-the-meter DERs as the main supply and the grid as the backup. The sequential Monte Carlo method is used to analyze the reliability performance of the residential model at the top 100 populous counties of the United States, where actual load and solar irradiance data at the counties is used. In the analysis, the sensitivity of indices to system parameters such as DER size and the sensitivity of the indices to climate zone and gross horizontal irradiation (GHI), which affects the load conditions and the PV output of the residential system, is performed. The analysis results show that the system parameters and the geospatial variables significantly impact the residential system’s reliability. The insights from this analysis will be of immense value to the distribution system planners to provide zone-specific guidelines for DER system sizing and toward the evolution of utility business models. Finally, the methodology developed can be used to extend the analysis to other locations.

14 SOLAR ENERGY↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Floating photovoltaic power plants: A review of energy yield, reliability, and operation and maintenance

Photovoltaic (PV) systems are essential for the transition to sustainable energy, reducing fossil fuel dependence and mitigating climate change. Although PV requires minimal land area — PV can meet the European Union's energy needs using only 0.26% of its land — space for deployment is often scarce in densely populated regions. Floating photovoltaics (FPV) offer an effective solution to land-use challenges by installing PV systems on floating structures in water bodies. FPV is a growing niche within PV with a cumulative installed capacity reaching 7.7 GW globally by 2023. Almost 90% of the installed FPV capacity is in Asia, with close to 50% of in China alone, while the Netherlands and France are the largest markets outside Asia. FPV shows strong potential to support climate targets, but still faces challenges like regulatory barriers, cost competitiveness compared to ground-based PV (GPV), and uncertainties about environmental impacts and system reliability. FPV systems are currently installed mainly on sheltered inland waters, such as quarry lakes, irrigation ponds and reservoirs. FPV technical standards are still being developed. Guidelines have been published by the World Bank, DNV, and Solar Power Europe, and emerging national standards from South Korea, China, and Singapore address design, components, and safety. The International Electrotechnical Commission (IEC) is working on formal standards for floats, mooring systems, and electrical connectors. However, the published best practices lack quantitative guidance for yield modelling and reliability, which this report aims to address. It provides data-driven insights, models, and parameters essential for accurate energy yield, reliability, and maintenance predictions over FPV systems' lifetimes.

14 SOLAR ENERGY↗

A Tariff for Reactive Power

Two kinds of power are required to operate an electric power system: real power, measured in watts, and reactive power, measured in volt-amperes reactive or VARs. Reactive power supply is one of a class of power system reliability services collectively known as ancillary services, and is essential for the reliable operation of the bulk power system. Reactive power flows when current leads or lags behind voltage. Typically, the current in a distribution system lags behind voltage because of inductive loads such as motors. Reactive power flow wastes energy and capacity and causes voltage droop. To correct lagging power flow, leading reactive power (current leading voltage) is supplied to bring the current into phase with voltage. When the current is in phase with voltage, there is a reduction in system losses, an increase in system capacity, and a rise in voltage. Reactive power can be supplied from either static or dynamic VAR sources. Static sources are typically transmission and distribution equipment, such as capacitors at substations, and their cost has historically been included in the revenue requirement of the transmission operator (TO), and recovered through cost-of-service rates. By contrast, dynamic sources are typically generators capable of producing variable levels of reactive power by automatically controlling the generator to regulate voltage. Transmission system devices such as synchronous condensers can also provide dynamic reactive power. A class of solid state devices (called flexible AC transmission system devices or FACTs) can provide dynamic reactive power. One specific device has the unfortunate name of static VAR compensator (SVC), where 'static' refers to the solid state nature of the device (it does not include rotating equipment) and not to the production of static reactive power. Dynamic sources at the distribution level, while more costly would be very useful in helping to regulate local voltage. Local voltage regulation would reduce system losses, increase circuit capacity, increase reliability, and improve efficiency. Reactive power is theoretically available from any inverter-based equipment such as photovoltaic (PV) systems, fuel cells, microturbines, and adjustable-speed drives. However, the installation is usually only economical if reactive power supply is considered during the design and construction phase. In this report, we find that if the inverters of PV systems or the generators of combined heat and power (CHP) systems were designed with capability to supply dynamic reactive power, they could do this quite economically. In fact, on an annualized basis, these inverters and generators may be able to supply dynamic reactive power for about $5 or $6 per kVAR. The savings from the local supply of dynamic reactive power would be in reduced losses, increased capacity, and decreased transmission congestion. The net savings are estimated to be about $7 per kVAR on an annualized basis for a hypothetical circuit. Thus the distribution company could economically purchase a dynamic reactive power service from customers for perhaps $6/kVAR. This practice would provide for better voltage regulation in the distribution system and would provide an alternate revenue source to help amortize the cost of PV and CHP installations. As distribution and transmission systems are operated under rising levels of stress, the value of local dynamic reactive supply is expected to grow. Also, large power inverters, in the range of 500 kW to 1 MW, are expected to decrease in cost as they become mass produced. This report provides one data point which shows that the local supply of dynamic reactive power is marginally profitable at present for a hypothetical circuit. We expect that the trends of growing power flow on the existing system and mass production of inverters for distributed energy devices will make the dynamic supply of reactive power from customers an integral component of economical and reliable system operation in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliable SOFC Systems

The goal of this U.S. Department of Energy (DOE) sponsored project was to advance the reliability, robustness and endurance of low-cost SOFC technology suitable for ultimate deployment in ≥100 MWe Integrated Gasification Fuel Cell (IGFC) or Natural Gas Fuel Cell (NGFC) systems capable of ≥97% CO2 capture. The ultimate SOFC program goals are ≤ 0.2% per 1000 hours power degradation over a 5-plus year stack life, high-volume (≥ 250 MW/year) stack production cost of ≤$225/kWsystem net AC, and “power block” (exclusive of fuel supply, contaminant removal, and CO2 capture subsystems) capital cost of ≤ 900/kWsystem net AC (in year 2011). To progress towards the ultimate program goals, the specific objectives of this project were to achieve an SOFC stack power degradation rate of ≤1.5% per 1000 hours in a 100 kW (125 kW Peak) Modular Power Block (MPB) stand-alone power system under thermally self-sustained normal operating conditions and to verify the prospects for high volume SOFC stack production cost below the DOE target of ≤ 225/kW. This final technical report summarizes the progress made during the project period of 36 months. Significant progress was made in the areas of cell and stack technology development, Modular Power Block (MPB) development, sub-MW MPB system development, and MW-class SOFC System Development and Costing. The work focused on areas necessary for comprehensive development of an SOFC fuel cell system, including, active cell improvement, contaminant resistance, process engineering, and development of non-repeat module components. Additionally, several custom built balance-of-plant components were designed and fabricated to support the fuel cell system. SOFC cell and stack development focused on improving cell performance and durability. Enhancements were achieved in areas of electrode stability and impurity tolerance. Additionally, several quality control techniques and tools were developed to ensure predictable and repeatable fabrication of SOFC stacks. Module development continued previous development efforts to achieve footprint reduction and higher efficiency by incorporating balance-of-plant functional equipment into the fuel cell containment module. Several improvements were made to prior design. Control and instrumentation hardware was integrated within the module for serviceability and size reduction. The design efforts culminated in a complete SOFC power plant system. The designed plant was constructed and tested at FCE. Stack and system costs were updated, reflecting advances made in this program.

20 FOSSIL-FUELED POWER PLANTS↗

Sizing ramping reserve using probabilistic solar forecasts: A data-driven method

Ramping products have been introduced or proposed in several U.S. power markets to mitigate the impact of load and renewable uncertainties on market efficiency and reliability. Current methods often rely on historical data to estimate the requirements of ramping products and fail to take into account the effects of the latest weather conditions and their uncertainties, which could lead to overly conservative or insufficient requirements. This study proposes a k-nearest-neighbor-based method to give weather-informed estimates of ramping needs based on short-term probabilistic solar irradiance forecasts. Forecasts from multiple sites are employed in conjunction with principal component analysis to derive numerical classifiers to characterize system-level weather conditions. In addition, we develop a data-driven method to optimize the model parameters in a rolling-forward manner. By using real-world data from the California Independent System Operator, we design two metrics to evaluate method performance: 1) frequency of shortage and 2) oversupply of ramping product. Our proposed method presents advantages in comparison with the baseline and a set of benchmark methods: without compromising system reliability, it reduces system ramping requirements by up to 25%, therefore improving both system reliability and economics.

14 SOLAR ENERGY↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Multiple Coaxial Catheter System for Reliable Access in Interventional Stroke Therapy

In some patients with acute cerebral vessel occlusion, navigating mechanical thrombectomy systems is difficult due to tortuous anatomy of the aortic arch, carotid arteries, or vertebral arteries. Our purpose was to describe a multiple coaxial catheter system used for mechanical revascularization that helps navigation and manipulations in tortuous vessels. A triple or quadruple coaxial catheter system was built in 28 consecutive cases presenting with acute ischemic stroke. All cases were treated by mechanical thrombectomy with the Penumbra System. In cases of unsuccessful thrombo-aspiration, additional thrombolysis or angioplasty with stent placement was used for improving recanalization. The catheter system consisted of an outermost 8-Fr and an intermediate 6-Fr guiding catheter, containing the inner Penumbra reperfusion catheters. The largest, 4.1-Fr, reperfusion catheter was navigated over a Prowler Select Plus microcatheter. The catheter system provided access to reach the cerebral lesions and provided stability for the mechanically demanding manipulations of thromboaspiration and stent navigation in all cases. Apart from their mechanical role, the specific parts of the system could also provide access to different types of interventions, like carotid stenting through the 8-Fr guiding catheter and intracranial stenting and thrombolysis through the Prowler Select Plus microcatheter. In this series, there were no complications related to the catheter system. In conclusion, building up a triple or quadruple coaxial system proved to be safe and efficient in our experience for the mechanical thrombectomy treatment of acute ischemic stroke.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Diesel fuel long term storage and treatment- recommended tests and practices (U)

The Clean Air Act (1970) is the comprehensive federal law that regulates air emissions from stationary and mobile sources. Among other things, this law authorized the Environmental Protection Agency (EPA) to establish National Ambient Air Quality Standards to protect public health and public welfare and to regulate emissions of hazardous air pollutants. In recent years, EPA regulations have forced oil refineries into producing a very low sulfur diesel fuel and incentives for adding up to 5% bio-diesel. These changes to the fuel oil formulation are beneficial to air quality and to energy conservation, but adversely impact heat content, long term storage stability, engine power, and injection system reliability. Diesel engines typically have a high incidence of injector failure resulting from poor diesel fuel quality. Since standby diesel engines do not run continuously it is necessary to implement periodic surveillance's to ensure the quality of diesel fuel is acceptable for reliable operation when a loss of power occurs. The information contained in this document is a compilation of best practices to be used as a guide for maintenance of a reliable diesel fuel system.

54 ENVIRONMENTAL SCIENCES↗

Automating Anomaly Detection for Target systems at Spallation Neutron Source

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory, produces the world’s most intense pulse neutrons beams. An accelerated proton beam is directed into a mercury target to generate neutrons via spallation. The target system accounted for over 40% of the overall downtime of the facility in 2022. Thus, early detection in anomalies in the target systems can enable taking corrective actions to avoid failures and reduce downtime. Fault prognostics and anomaly detection in accelerators, both at SNS and outside, has largely focused on the beam side. This paper presents one the first studies exploring leveraging machine learning to automate the detection of anomalies in the target system. The target system consists of over 30 different interconnected subsystems, and the present work focuses on the mercury process system as a use case. Analyzing data from 28 process variables from 2022 and 2023, tree-based and reconstruction-based algorithms are employed to detect anomalies in archived data. The algorithms detected previously unreported anomalies, several of which were deemed alert worthy by human experts, particularly those found by reconstruction-based algorithms. Using data from each production run in the accelerator increased the generalizability of the models in time. Efforts are now underway to implement a workflow for incorporating human feedback to update the models and evaluating performance on unseen data. The models will eventually be integrated into the existing System Tracking and Reliability system with a web interface for automated anomaly detection and reporting along with a pathway for incorporating human feedback for model updates.

Raj, Anant [ORNL] (ORCID:0000000306711244)↗

Instrumentation and Control and Human Machine Interface Science and Technology Roadmap in Support of Advanced Reactors and Fuel Programs in the U.S.

The purpose of this paper is to provide an overview of the current status of the Instrumentation, Control and Human Machine Interface (ICHMI) Science and Technology Roadmap (Reference xi) that was developed to address the major challenges in this technical area for the Gen IV and other U.S. Department of Energy (DOE) initiatives that support future deployments of nuclear energy systems. Reliable, capable ICHMI systems will be necessary for the advanced nuclear plants to be economically competitive. ICHMI enables measurement, control, protection, monitoring, and maintenance for processes and components. Through improvements in the technologies and demonstration of their use to facilitate licensing, ICHMI can contribute to the reduction of plant operations and maintenance costs while helping to ensure high plant availability. The impact of ICHMI can be achieved through effective use of the technologies to improve operational efficiency and optimize use of human resources. However, current licensing experience with digital I&C systems has provided lessons learned concerning the difficulties that can be encountered when introducing advanced technologies with expanded capabilities. Thus, in the development of advanced nuclear power designs, it will be important to address both the technical foundations of ICHMI systems and their licensing considerations. The ICHMI roadmap will identify the necessary research, development and demonstration activities that are essential to facilitate necessary technology advancement and resolve outstanding issues.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2019

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2019.

14 SOLAR ENERGY↗