Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tank 4”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

141 records · Page 8

Techno-economic Analysis of the Cryogenic Flux Capacitor Compared to Other forms of Hydrogen Production and Storage

The Cryogenic Flux Capacitor (CFC) is a cold, dense energy storage core that is being studied in the cryo-compressed, about 300 bar and 80K, region of gaseous hydrogen (GH2) storage and liquid hydrogen (LH2) region near the normal boiling point. The hydrogens storage is improved by physically bonding the molecules within the nanoscale pores of the aerogel composite blanket material. The process of bonding or debonding is governed by principles of physical adsorption (physisorption) and thermodynamics. The large surface area afforded by the nanoporous aerogel (~1,000 m2/g) allows its storage performance to easily exceed capacities of high-pressure GH2 storage for an equivalent volume. With the integrated aerogel, subscale tests have shown that storage is increased by about 49% over a simple tank filled with GH2 at the same operating temperature and pressure. For LH2 conditions, the CFC is shown to operate at equivalent densities. For the techno-economic analysis (TEA), the source of hydrogen is compared between onsite steam methane reforming (SMR) and onsite solar photovoltaic (PV) panels providing power to electrolyzers to produce GH2. The TEA compares pure hydrogen burning in a combined cycle gas turbine (CCGT) to hydrogen fuel cells with an overall net power output of 650 MW. The SMR system uses natural gas as an input and includes a carbon capture and storage (CCS) system. The levelized cost of electricity is developed based on the capital cost and operating cost of the systems. Sensitivities are discussed around the cost of natural gas, ranging from 1.93 USD per MMBTU to 6.75 USD per MMBTU, and carbon dioxide disposal, ranging from 7 USD per tonne to 10 USD per tonne. For comparison to the conventional CCGT baseline, a baseload scenario is adopted with 85% capacity factor. The results of the study show that onsite hydrogen generation from SMR is about 1 to 3 USD per kg over the life of the plant and the PV hydrogen production produces at 4 to 5 USD per kg. The cost of storage for CFC is compared to other systems, including high-pressure GH2 and atmospheric LH2. The system is shown to provide the lowest costs for all these options at the grid scale, due to its higher capacity than high-pressure GH2 and ability to operate at 80K, receiving refrigeration from liquid nitrogen systems reducing capital and operating costs when compared LH2 storage systems. SMR is competitive with CCGT at the gas prices, both of which have lower LCOE than the PV system. When accounting for variability in gas prices, the PV and electrolyzer system is less sensitive to these changes and provides the lowest LCOE across the whole range.

08 HYDROGEN↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cryogenic aspects of a 20 MW class low-temperature superconducting generator for the renewables industry

In this paper we give a progress update on the cryogenic design for cooling a 20 MW class, partially superconducting generator with stationary field coils for offshore wind renewables industry [1-2]. This is a continuation of an earlier program on a 10 MW system dating back ten years. Whereas this new power rating increase leads to a radial diameter expansion of the superconducting field coils from 4 to > 9.5 m, it maintains the axial length. We show the design based on this scaled up with enlarged diameter. The field coil size increase asks for higher cooling power that leads to a bigger cold box size to accommodate the cryocoolers. In the design, as many as 8 cryocoolers can be accessed and serviced from the nacelle that houses the main cryogenic components. A typical thermal load balance sheet with all components is given and compared against the available cryocooler cooling power at different operating conditions. Due to the cryocoolers’ local point of contact cooling within the nacelle, the temperature gradient of the thermal shield that fully encloses the cold mass with its embedded field coils needs to be balanced out to minimize the heat burden on the field coils. This requires additional analytical efforts and implementation of further design features. The extended nacelle houses the cold box with its cryogenic infrastructure. The interface for the envisaged cryogenic pushbutton closed-loop circulating system remains invisible, requires no handling of cryogenic liquids and is hermetically closed. The field coil diameter increase also leads to a greater initial helium gas storage volume. In addition, it requires higher initial room temperature fill pressure within the toroidal helium vapor storage tanks and in cooling tubes connecting to the cryocoolers. The toroidal helium gas tanks are thermally coupled with the thermal shield so that helium convection inside the storage tank can improve heat transfer and reduce the temperature gradient of the thermal shield. Besides those heat transfer challenges, additional mechanical strain within this large structure is exerted on the torque tubes during initial cooldown and when energizing field coils. Some of those design challenges are quite unexpected, leading to novel workarounds in order to maintain the chosen cooling strategy. Finally, we assess those design limitations in view of further cryogenic scalability with emphasis on manufacturability and assembly.

cryogenics↗

Petrophysical and geomechanical properties of gas hydrate-bearing sediments recovered from Alaska North Slope 2018 Hydrate-01 Stratigraphic Test Well

Knowledge of petrophysical and geomechanical properties of gas hydrate-bearing sediments are essential for predicting reservoir response due to gas production from gas hydrate reservoirs. That information will be critical parameters for designing production well completion such as specification of depressurization pump, water storage tank, and mesh size of sand screen. In December 2018, Stratigraphic Test Well Hydrate-01 was drilled in the western part of the Prudhoe Bay Unit, Alaska North Slope as part of the technical planning effort for a future long-term production test by collaborative team of DOE/NETL, USGS, and MH21-S (Boswell et al., 2020, Collett et al., 2020, Okinaka et al., 2020). Data set of logging-while-drilling (LWD) were acquired (Haines et al., 2020, Suzuki et al., 2019) and core sampling depth was determined on-site.Side-wall pressure coring was conducted to recover gas hydrate-bearing sediments from two reservoir sections named Unit-B and Unit-D. A total of 34 cores were successfully recovered by 5 runs of a wire-line deployed pressure corer (CoreVault® System - Halliburton). Core analysis scheme of this project are shown in Figure 1. All cores were quenched in liquid nitrogen while at high pressure in the laboratory of Stratum Reservoir, LLC. at Anchorage (Figure 1, a)). And the cores were removed from the pressure corer autoclave with temperature support of dry ice and stored under liquid nitrogen at atmospheric pressure. 19 damaged cores were processed to index property measurements directly such as grain size, grain density. 4 of another 17 cores were depressurized and trimmed for making a plug to analyze petrophysical properties of host sediments. Unsteady-state permeability test was conducted to obtain relative water permeability to gas and core scale NMR T2 distribution measurement was performed for evaluating pore size distribution at Houston (Figure 1, b)). Remained high quality 13 cores were preserved with gas hydrate for advanced laboratory analysis. National Institute of Advanced Industrial Science and Technology, as a part of the Japanese National Hydrate Research Program (MH21-S, funded by Ministry of Economy, Trade and Industry), received the samples at Sapporo, Japan for advanced core analysis. High-resolution X-ray CT was used to analyze the quality of the samples, which showed undisturbed lithological layers. Cores were lathed into cylindrical shape and distributed for multi property measurements (Figure 1, c)).<p>As a result, sediment from Unit-D is categorized as silty sand at ~37% porosity with ~80% gas hydrate saturation. An average hydration number n = 6.16 was measured by Raman spectroscopy. An average intrinsic permeability of ~400 mD and in situ effective permeability (with hydrate) on the order of ~10 mD. The Unit B recovered cores consisted of well sorted sand at ~40% porosity with ~95% gas hydrate saturation. An average intrinsic permeability of ~1 Darcy and in situ effective permeability on the order of ~30 mD was measured for the Unit B cores. There was a small permeability reduction due to porosity loss with increasing effective stress that simulated consolidation behavior along with depressurization in the highly permeable sandy sediment. The apparent minimum change in porosity and permeability may be caused by the low compressibility of quartz sand grains in the recovered cores. XRD and thermal conductivity analysis also suggested high quartz content. Triaxial compression tests established internal friction angles based on the Mohr-Coulomb's failure criterion, which are 40° for hydrate-bearing sediment and 29.8° for hydrate free sediment.</p>

Yoneda, Jun↗

Evaluation of High Level Waste Sludge Processing Behavior

The U.S. Department of Energy’s (DOE) Hanford Site has 177 underground storage tanks that contain wastes from past nuclear fuel reprocessing and waste-management operations. Over 20% of this waste is in the form of an insoluble sludge that will require slurry modification before its transfer to the Waste Treatment and Immobilization Plant (WTP). Specific WTP acceptance criteria for waste feed delivery describe the physical and chemical characteristics of the waste that must be met before the waste is transferred to the WTP. One challenging requirement relates to the undissolved solids (UDS) composition in a waste feed because the waste contains solid particles that settle, and their concentration and relative proportion can change during the transfer of the waste in individual batches. A key uncertainty is the ability to transfer and mix wastes with large variations in UDS concentrations and resulting settling rates. To address this uncertainty, a number of small scale mixing and settling tests have been conducted to determine the mobilization performance of variable chemistry simulants. Comparison of the size and density of the particulate for each simulant to that of southeast area Hanford sludge was made using metrics for particle mobilization, suspension, settling, and pipeline transfer where dependance on particle size and density may be different, including: 1. Settling velocity, 2. Critical shear stress for erosion, 3. Just-suspended impeller speed, and 4. Pipeline critical transport velocity. Existing high-level waste sludge data has shown the effect that increasing Al concentration has on resulting settled solids. This differential settling of particles in the sludge has the possibility of resulting in solids segregation during feed preparation and uneven particle distribution during pipeline transportation or mixer jet pump operations. Understanding the predictive capabilities of HLW solids settling and transport as well as potential remedies for addressing disparate sludge behaviors can help provide technical guidance during HLW flowsheet planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Colloidal Behavior of Plutonium Oxide in Concentrated Electrolyte Solutions

The Hanford Site in Washington State manages legacy high-level radioactive waste streams that display major chemistry and engineering challenges, including the high salt levels and pH values that correspond to conditions under which many classical concepts describing chemical reactivity cannot be applied. One particular challenge that needs to be tackled at Hanford is that Pu concentrations, [Pu], in the soluble phases of the tank wastes are higher than expected based on the solubility of crystalline PuO2, which is widely accepted to be caused by the formation of PuO2 colloid, consisting of nano- to submicron-sized particles (PuO2 NPs). Fundamental research underpinning the behavior of PuO2 NPs under conditions not only relevant to the Hanford tank waste but at high ionic strength in general is needed to reliably predict the chemical reactivity of PuO2 NPs and develop engineering solutions to safely and efficiently process high-level radioactive waste into forms suitable for long-term storage. In this work, we study the behavior of PuO2 NPs (particle size ~100 nm) under high ionic strength conditions by reacting it with highly concentrated (up to 5 M) salt solutions. We explore different electrolyte compositions to elucidate the impact of different anions (NO3-, Cl-, ClO4-, SO42-, C2O42-, CO32-) on the stability of PuO2 NP in the acidic and alkaline pH regime. PuO2 NP aggregation and precipitation as function electrolyte concentration is tracked by a combination of liquid scintillation counting, dynamic light scattering for determination of particle size distributions, and zeta potentials as a proxy for particle charge. At acidic pH, electrolytes containing non-coordinating anions, such as NaNO3, NaCl, and NaClO4 mostly stabilize PuO2 NPs over a large electrolyte concentration range, showing only subtle differences in their reactivity. Other electrolyte anions show a more pronounced effect on the PuO2 NP stability: SO42-, binds directly to the particles’ surface, reverses the particle charge, and precipitates the PuO2 NPs efficiently even at intermediate sulfate concentrations (>0.1 M). In contrast, C2O42- is found to lead to high [Pu] in solution, in the milli-molar range, even at mildly acidic pH (~4). Thermodynamic modeling of the dissolved Pu concentrations using PHREEQC is unable to predict the observed [Pu] in the acidic pH regime, supporting the influence of colloids in maintaining elevated [Pu]. It is noteworthy that the current thermodynamic databases do not include constants for colloidal Pu phases and cannot accurately predict many of the high ionic strength solutions relevant to this work. The mechanisms and models responsible for these observations will need further investigation in the future. At high pH values (~12), PuO2 NPs exhibits classical sol-gel chemistry, meaning that upon destabilization of the colloidal sol, for example by addition of concentrated NaOH, highly porous and viscid PuO2 coagulates are formed that consist of a three-dimensional network likely held together by physical interactions. The PuO2 NP coagulate shows no significant reversibility of the aggregation when contacted with concentrated brines; however, PuO2 NPs can be efficiently resuspended in solution by addition of diluted electrolytes, alkaline solutions containing high amounts of carbonate, or simple addition of water. Especially carbonate is shown to stabilize PuO2 NPs in solution at high pH, characterized by stable colloidal suspensions that are resistant against sedimentation during centrifugation. Thermodynamic modeling of the carbonate system was able to predict an increasing dissolved Pu concentration with increasing carbonate concentration. However, the model was profoundly sensitive to the fixed redox potential and does not include any thermodynamic constants for colloidal Pu species.

Neumann, Julia↗

Evaluation of the Potential for Precipitation of Solids during Storage of Non-Aluminum SNF Solutions

Non-aluminum clad spent nuclear fuels (NASNF) stored in the L-Area basin will be dissolved in H-Canyon using the 6.3D electrolytic dissolver. The solutions will be stored in either the hot or warm canyon until the preparation of a sludge batch for the Defense Waste Processing Facility. Spent nuclear fuel solutions could be stored for 1-2 years before transfer to the H-Area Tank Farm depending on the interval between sludge batches. The solution level in the storage tanks will be maintained; therefore, precipitation of solids due to evaporation is not an issue. However, the precipitation of solids from completely dissolved SNF due to solution instabilities has been observed during intermediate storage of solutions generating hydrated oxides.The presence of fissile material in these solids is generally associated with zirconium molybdate, which is known to act as a host lattice for Pu and can carry the actinides upon precipitation. The formation of zirconium molybdate solids which carry fissile material is a potential concern for the storage of NASNF solutions. To address this concern, the Savannah River National Laboratory performed a literature review to identify knowledge gaps which may require experimental work to determine if the formation of solids is a concern during storage of these solutions. Based on the literature review, the precipitation of zirconium molybdate solids from the Campaign 1 NASNF solutions during intermediatestorage is expected. This conclusion is supported by the identification of zirconium molybdate solids found on the H-Canyon 6.1D Dissolver MK-12 insert spacer. The formation of the zirconium molybdate solids is attributed to hydrolysis and radiolytic processes in the nitric acid solution. As the molybdate solids form, U and Pu can substitute for Zr in the crystal lattice resulting in co-precipitation. Generally, the Pu substitutes directly into the crystal lattice during precipitation while the U associated with the molybdate solids more likely absorbs from the solution. The U in the NASNF solutions is present as uranyl nitrate, a 2+ cation which will not substitute as easily into the molybdate crystal lattice for the Zr 4+ ion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary IHLW Formulation Algorithm Description

This report documents the initial algorithm that could be used by the Waste Treatment and Immobilization Plant (WTP) in batching high-level waste (HLW) and glass-forming chemicals (GFCs) in the HLW melter feed preparation vessel (MFPV) (HFP-VSL-00001 and -00005). Not all Hanford tank waste can be accommodated by the models developed for this report and significant expansion of the model boundaries could be achievable to reduce the WTP mission life and total canister production count. The immobilized HLW (IHLW) must meet a series of constraints to be acceptable for disposal in the Monitored Geologic Repository, which are contained in the Specification 1 of the Contract (DOE 2000), the Waste Acceptance Product Specifications (WAPS, DOE 1996), and the Waste Acceptance System Requirements Document (WASRD, DOE 2007). The IHLW Waste Form Compliance Plan (WCP, 24590-HLW-PL-RT-07-0001, Rev 3) specifies that the formulation algorithm will be developed and used to comply with the constraints associated with glass composition and properties. This report is not an engineering calculation, does not provide design input, and is not an engineering study. Algorithm inputs include the chemical analyses of the blended HLW in the HLW blend vessel (HBV) (HLP-VSL-00028, the volume and composition of the MFPV heel, the volume and composition of the MFPV after waste addition, the volume and composition of MFPV batch after GFC addition, the compositions of individual GFCs, and the mass of glass in each canister. In addition to these inputs, uncertainties in the HLW composition and processing parameters are included in the algorithm. Using the above inputs, the algorithm calculates the following outputs: 1) the volume of HLW to be transferred from the HBV to the MFPV, 2) the mass of each GFC for addition to the MFPV, 3) the composition of the glass that will be produced along with uncertainties, and 4) the predicted properties, with associated uncertainties, of the resulting IHLW. The algorithm uses the property-composition models to calculate properties with associated uncertainties and compares them with various constraints to ensure that a processable feed is formulated and a compliant IHLW is produced. The GFC additions are determined using an optimization approach to provide high confidence that the HLW glass will meet all product quality requirements and key processing constraints. For most HLW batches there are many possible glass compositions that meet all constraints. In these cases, the glass composition is optimized for a series of target component concentrations and target property values. The algorithm also incorporates process measurement and product quality uncertainties, based on the work of Piepel et al. (2005). Estimates of the various process and measurement uncertainties that affect glass compositions and predicted glass properties have been previously reported (Piepel et al. 2005, 2006) and the impacts of these estimated uncertainties on the IHLW composition envelope that meets product quality and processing-related properties with sufficient confidence were evaluated. The details of work performed to date to develop this initial GFC addition and batching algorithm are summarized in Sections 4 and 5. An example data set is used to illustrate the calculations of the algorithm summarized in Section 6. Finally, in Section 7, there is a statement of the required work to achieve a final operational IHLW formulation control algorithm. This report is not an engineering calculation, does not provide design input, and is not an engineering study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Harnessing Carbon: A Review of Current Technologies for Transform-ing Methane into Value-added Products

The concern over greenhouse gases, methane (CH 4 ) and carbon dioxide (CO 2 ), is increasing rapidly. There have been strides to find solutions to this global issue but there is not a clear path to a successful end goal. The concentration of CH 4 and CO 2 in the atmosphere has increased significantly over the last 60 years, methane is a great source of concern due to its ability to trap a high amount of heat in the atmosphere. These greenhouse gases contribute to global warming which has caused changes in the environment, including the melting of ice caps, and altered weather patterns. This review investigates biotechnology that has promising potential to aid in the mitigation of the negative effects methane has on the environment by exploring microorganisms, specifically methanotrophs, for their ability to convert methane into secondary value-added products that can be used for a wide range of applications. Methane as a feedstock could provide financial benefits due to the vast amount of methane available from sources like landfills, wastewater treatment plants, and agricultural sites. Furthermore, this review will look at the prospects of bioreactor technology and the potential for more environmentally friendly plastics, such as polyhydroxyalkanoate (PHA), to shy away from traditional petroleum-based plastics. The continuous advancement of bioreactor technology is crucial to mitigating greenhouse gas emissions.

36 MATERIALS SCIENCE↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benzenesulfonamide Derivatives as Complexants and Extractants for Addressing the Mercury Problem at the Savannah River Site

Mercury (Hg) is a major global pollutant arising from both natural and anthropogenic sources. Its widespread use in medicinal and industrial applications makes it a common chemical exposure and environmental pollutant. It can exist in several forms which include: Metallic mercury (Hg{sup 0}), mercurous (Hg{sub 2}{sup 2+}), mercuric salts (Hg{sup 2+}), and organic mercury (e.g. CH{sub 3}Hg{sup +}), with the latter being the most toxic of all the species. Due to mercury's high toxicity, new approaches towards its detection has received significant attention in the scientific community. Mercury exposure at the Savannah River Site (SRS) has been a recent concern especially with increasing amounts of organic mercury in the saltstone. It originates mainly from its use as an acidic dissolution catalyst of aluminum cladding from target fuels within the uranium and plutonium processing operations [1]. It is present to an amount of about 60 metric tons in the high-level waste (HLW) tanks. Organic Mercury species have been found in low activity waste (LAW) at the site that eventually ends up in the saltstone. Therefore, there is a need for: i) Converting organic mercury to other less toxic forms and ii) Complexation and removal of Hg prior of disposal of LAW in saltstone. Various methods have been developed for selective sensing of mercury in the presence of other toxic metals. These methods include using ligands that can form organo-soluble metal complexes with different optical and spectroscopic properties that can be used for toxic metal sensing. In 2005, our group pioneered an ion-exchange extraction method, in which o-phenylenediamine-derived disulfonamides were used to complex and selectively extract and sense Pb{sup 2+} from aqueous solutions into an organic phase [2,3]. Herein, a disulfonamide and a bis-dansylamide have been shown to extract, complex and sense Hg(II). Ligand 1: The crystal structure of the disulfonamide-Hg complex confirms the complexation of Hg(II) with the ligand. Complexation was corroborated by the {sup 1}H-NMR spectra obtained after contacting solutions of various concentrations of Hg{sup 2+} with 2 mM ligand in chloroform. Distinct resonances are observed at Hg/L ratio of 0.5 that are also observed for the isolated 1:2 complex. In the presence of excess mercury, new resonances, as well as the movement of Et{sub 3}N resonances indicate the formation of a different Hg-sulfonamide-triethylamine complex, presumably having 1:1 Hg:L stoichiometry. The electronic spectra of aqueous phases after extraction show that there was no free ligand absorption at 0.5 eq of Hg, indicating a complete complexation. Complexation was also confirmed by the UV-visible titrations with Hg{sup 2+} at constant ligand concentration. pH-dependent extraction carried out shows that extraction of Hg(II) by ligand 1 was over 90% for most alkaline pHs. Ligand 2: The crystal structure of the Ligand 2 complex formed with Hg(OAc){sub 2} shows a remarkable coordination pattern with 4:2 metal:ligand stoichiometry. The fluorescent bis-dansyl disulfonamide derivative was found to complex and sense HgCl{sub 2} and Hg(OAc){sub 2} by demonstrating fluorescence quenching upon Hg(II) addition in comparison with other metals (Zn(II), Cd(II), Pb(II)). No were observed for Cu(II), Ag(I) and Co(II). We have shown the complexation of Hg(II) by a disulfonamide and a bis-dansyl disulfonamide ligand using several spectroscopic methods. Ligand 1 was able to extract mercury into chloroform and form a complex in the presence of excess mercury by synergistic complexation with triethylamine acting as a co-ligand. X-ray and NMR both confirm a 1:2 HgL{sub 2} stoichiometry. Ligand 2 can be used for sensing of Hg(II) as fluorescence quenching was observed after addition of Hg(II)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-Optimized Cold Climate Heat Pump Development and Field Test

Cold climate heat pumps (CCHPs) expand the heat pump market to climates where heating demand is dominant. They can achieve more than 70% energy savings compared with electric resistance heating and operate at lower cost than using tank-stored propane to fuel a furnace. A high-efficiency heat pump with a heating seasonal performance factor (HSPF)—as defined by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI 2008)—greater than 10.0 would be more efficient than gas heating in terms of source energy. However, developing a cost-effective CCHP involves some challenges. A typical single-speed, air-source heat pump (ASHP) with an HSPF of 7.7 Btu/Wh does not work well under cold outdoor temperature conditions typical of cold climate locations for four major reasons: 1. Discharge temperature is too high—The low suction pressure and high compression pressure ratio at low ambient temperatures causes high compressor discharge temperatures in excess of the maximum limit for many of the compressors on the market. Furthermore, system charge of a heat pump is usually optimized in the cooling mode, which leads to overcharge conditions in the heating mode, further increasing the discharge temperature. 2. Heating capacity is insufficient if sized to meet the building design cooling load— Heating capacity of a single-speed heat pump decreases with ambient temperature. The heating capacity at -13°F (-25°C) typically decreases to 20%–40% of the rated heating capacity at 47°F (8.3°C) (~equivalent to the rated cooling capacity at 95°F [35°C]). Therefore, a single-speed heat pump, typically sized to match the building design cooling load, cannot provide adequate heating capacity to match the building heating load at low ambient temperatures. The capacity deficit is filled by inefficient resistance heat, thus lowering the system efficiency and significantly increasing power demand. 3. Cyclic loss is significant if sized to meet the building design heating load—If a single-speed heat pump is sized to meet the heating load, it will be significantly oversized relative to the cooling load in many cold climates. This will cause excessive on/off cyclic loss during the cooling and heating operations at moderately low ambient temperatures. Thus, capacity modulation capability (e.g., using a variable-speed or multi-stage compressor) is necessary for a CCHP, which uses its full capacity to meet the peak heating load and partial capacity to meet the cooling and part-load heating loads. 4. Coefficient of performance (COP) is low—Heating COP degrades significantly at low ambient temperatures owing to the large temperature difference between the heat source and sink. A target CCHP should be sized to meet the building design heating load while minimizing the cyclic loss for the cooling and heating operations at moderate ambient temperatures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recovery of Oxpure 612C-50 Coconut Carbon Particles Using Bump Arrays

Cyanide is used to leach gold from crushed ore (solid matrix) into a gold cyanide solution. The gold is extracted from the cyanide solution by adsorption onto activated carbon. The gold extraction process occurs when the activated coconut carbon is placed into tanks that contain the gold cyanide solution either in a batch process or into a continuous flow circuit. The coconut carbon is then removed from the solution for gold recovery. The use of the mesofluidic separation system (a deterministic lateral displacement system) can significantly reduce costs and waste generated from the process of removing the coconut carbon from the solution. In the coconut carbon recovery process used at many gold mines in Nevada, the gold is attached to carbon particles that are still in the cyanide liquor. The mesofluidic system can rapidly remove the gold bearing carbon particles from the cyanide liquor quickly and with no operating costs. The benefits include: • Reduce operational costs related to filtration and hydro-cyclones • Reduced acid usage for the elution gold stripping phase as only 25% of the fluids will follow the carbon particles to the final express lane when two mesofluidic systems are used in series This alternative particle removal techniques would be advantageous. A promising technique for removing larger particles from slurries is mesofluidic separation, similar to deterministic lateral displacement arrays or “bump” arrays [1] but operates at much larger flow rates. As described by Pease, et al. [2], “Bump arrays in deterministic lateral displacement devices separate large particles from small particles using arrays of staggered posts. Large particles, defined as those with radii larger than the distance between the edge of a post and the stagnation streamline from the next downstream post, must bump toward one side of the device, whereas particles smaller than this distance slalom from entrance to exit without net lateral displacement.” Unlike filters or sieves, the posts in the arrays that cause separation do not block or occlude particle flow but work because particles go around the posts. Unlike hydrocyclones separation, separation is not driven by particle density, because gravitational forces are unimportant to mesofluidic separation. Burns, et al., and Pease, et al., have shown that particles may be separated from complex suspensions, under turbulent flow conditions, and at industrially important flow rates [3-5]. They have also recently shown that mesofluidic devices may be arranged in series to increase separation performance [6]. In this paper, we evaluate the mesofluidic system for the separation of commercial OxPure GR 612 Charred Coconut shell particles as a proof of principle test for the rapid separation using the 1500 micron cut mesofluidic separator. We first describe the experimental system and conditions. We then present the experimental results. [1] Huang, L.R., E.C. Cox, R.H. Austin, J.C. Sturm. 2004. Continuous particle separation through deterministic lateral displacement. Science, 304, 987–990. https://doi.org/10.1126/science.1094567. [2] Pease L.F., J.A. Bamberger, C.A. Burns, and M.J. Minette. 2021. Large Particle Separation from Non-Newtonian Slurries using Bump Arrays. In Proceedings of the ASME 2021 Fluids Engineering Division Summer Meeting FEDSM2021-65904, V003T08A023. New York, New York: ASME. doi:10.1115/FEDSM2021-65904 [3] Burns C.A., T.G. Veldman, J. Serkowski, R.C. Daniel, X.-Y. Yu, M.J. Minette, L.F. Pease. 2021. Mesofluidic separation versus dead-end filtration. Separation and Purification Technology, 254, 117256. https://doi.org/10.1016/j.seppur.2020.117256. [4] Pease L.F., J.E. Serkowski, T.G. Veldman, J. Williams, X.-Y. Yu, M.J. Minette, J.A. Bamberger, C.A. Burns. 2021. Can Bump Arrays Separate Particles from Turbulent Flows?. In Proceedings of the ASME 2021 Fluids Engineering Division Summer Meeting FEDSM2021-67696, V003T08A024. New York, New York: ASME. doi:10.11

mesofluidic separation, slurry, bump array↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗