Evaluation of scheduling techniques for payload activity planning

Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

Bullington, Stanley F.

Anti-reflection Coatings on Large Area Glass Sheets

The first quarter of a one-year program designed to research and perfect a method of producing antireflective coatings on large glass sheets through the use of sodium silicate hardened by exposure to acid is reported. The requirements for a linear motion device used to produce uniform sodium silicate films were determined. A search for a commercially available device is underway. Sodium silicate solutions of varying concentrations were prepared. Determinations of the physical properties relevant to film thickness are in progress. In addition, material costs are being recorded for later use in a cost analysis of the method. All tasks of the project are proceeding according to schedule. Of the tasks, only the sodium silicate solution preparation is complete.

Pastirik, E.

Schedule Risk Assessment

Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

Smith, Greg

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Astronauts, unlike Mission Control, are not expert planners, however, and determining simple strategies and heuristics that enable them to schedule successfully can increase the range of problems they can solve successfully. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedules, and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. Participants conducting naturally learn to schedule activities with the most constraints first, while participants vary in heuristics in the rescheduling task.

self-scheduling

Towards a Measure of Situation Awareness for Space Mission Schedulers

The success of space flight missions relies on support provided to astronauts through specialist knowledge of ground-based personnel. One of the many essential tasks that ground personnel provide is the scheduling of flight crew daily activities. Future long duration exploration missions will require astronauts to assume planning and scheduling responsibilities in order to facilitate increased autonomy from ground support. Although situation awareness is critical to the scheduling task, a sufficient measure for this domain has not been developed. This paper documents the approach and process by which the authors developed a framework for measuring situation awareness in space mission schedulers and presents the measure applications’ initial results.

human factors in spaceflight

Towards a Measure of Situation Awareness for Space Mission Schedulers

The success of space flight missions relies on support provided to astronauts through specialist knowledge of ground-based personnel. One of the many essential tasks that ground personnel provide is the scheduling of flight crew daily activities. Future long duration exploration missions will require astronauts to assume planning and scheduling responsibilities in order to facilitate increased autonomy from ground support. Although situation awareness is critical to the scheduling task, a sufficient measure for this domain has not been developed. This paper documents the approach and process by which the authors developed a framework for measuring situation awareness in space mission schedulers and presents the measure applications’ initial results.

human factors in spaceflight

Scheduling real-time, periodic jobs using imprecise results

A process is called a monotone process if the accuracy of its intermediate results is non-decreasing as more time is spent to obtain the result. The result produced by a monotone process upon its normal termination is the desired result; the error in this result is zero. External events such as timeouts or crashes may cause the process to terminate prematurely. If the intermediate result produced by the process upon its premature termination is saved and made available, the application may still find the result unusable and, hence, acceptable; such a result is said to be an imprecise one. The error in an imprecise result is nonzero. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. This problem differs from the traditional scheduling problems since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result. Consequently, the amounts of processor time assigned to tasks in a valid schedule can be less than the amounts of time required to complete the tasks. A meaningful formulation of this problem taking into account the quality of the overall result is discussed. Three algorithms for scheduling jobs for which the effects of errors in results produced in different periods are not cumulative are described, and their relative merits are evaluated.

Liu, Jane W. S.

Are accidents scheduled

Two major sets of safety problems associated with project scheduling are examined. The first set involves problems resulting from the improper scheduling of the safety tasks. The second involves problems which result from inadequate attention to scheduling of those project tasks which lead to tests and operations and includes condensed schedules, modified schedules, schedule workarounds, eliminated portions of the schedules and strung out schedules.

Childs, C.

Priority-BF: A Task Manager for Priority-Based Scheduling

The increasing demand for computational resources, particularly in High-Performance Computing environments, necessitates to rethink how we handle job scheduling strategies. This work addresses the challenge of managing concurrent jobs with differing priorities on overloaded parallel systems, where strict QoS constraints are often difficult for users to define. Our solution relies on a qualitative description of priorities and pulls from two key approaches: the Easy-BF algorithm and the Conservative Backfilling algorithms. This solution improves the response time for high-priority jobs by 50% without affecting the overall system utilization. We show its applicability in several critical scenarios such as High-Performance Computing (HPC) resource management and in-situ computing.

Gainaru, Ana [ORNL]

Space Chicken: A Historical Look at How the Critical Path Changes over a Mission’s Development

The critical path in schedule analysis defines the series of tasks that have no schedule slack leading to the delivery of a system. The critical path for NASA science missions, which typically runs through a spacecraft subsystem or a scientific instrument, is dynamic and changes over the development lifetime of a project. Often the critical path at the start of preliminary design will be through a specific spacecraft subsystem while the final, delivered critical path item is often a scientific instrument that is delivered late. The research for this paper looks at the postulated critical path at different milestones, and the actual critical path item at final delivery, for a variety of NASA science missions to understand what elements are impacting the delivery schedule the most. Recommendations are made based on these quantitative results relative to what elements should potentially be considered more often in early development schedules to more robustly plan for development issues.

Bitten, Robert

TASKILLAN II - Pilot strategies for workload management

This study focused on the strategies used by pilots in managing their workload level, and their subsequent task performance. Sixteen licensed pilots flew 42 missions on a helicopter simulation, and were evaluated on their performance of the overall mission, as well as individual tasks. Pilots were divided in four groups, defined by the presence or absence of scheduling control over tasks and the availability of intelligence concerning the type and stage of difficulties imposed during the flight. Results suggest that intelligence supported strategies that yielded significant higher performance levels, while scheduling control seemed to have no impact on performance. Both difficulty type and the stage of difficulty impacted performance significantly, with strongest effects for time stresss and difficulties imposed late in the flight.

Segal, Leon D.

Lessons Learned from Deploying an Analytical Task Management Database

Defining requirements, missions, technologies, and concepts for space exploration involves multiple levels of organizations, teams of people with complementary skills, and analytical models and simulations. Analytical activities range from filling a To-Be-Determined (TBD) in a requirement to creating animations and simulations of exploration missions. In a program as large as returning to the Moon, there are hundreds of simultaneous analysis activities. A way to manage and integrate efforts of this magnitude is to deploy a centralized database that provides the capability to define tasks, identify resources, describe products, schedule deliveries, and generate a variety of reports. This paper describes a web-accessible task management system and explains the lessons learned during the development and deployment of the database. Through the database, managers and team leaders can define tasks, establish review schedules, assign teams, link tasks to specific requirements, identify products, and link the task data records to external repositories that contain the products. Data filters and spreadsheet export utilities provide a powerful capability to create custom reports. Import utilities provide a means to populate the database from previously filled form files. Within a four month period, a small team analyzed requirements, developed a prototype, conducted multiple system demonstrations, and deployed a working system supporting hundreds of users across the aeros pace community. Open-source technologies and agile software development techniques, applied by a skilled team enabled this impressive achievement. Topics in the paper cover the web application technologies, agile software development, an overview of the system's functions and features, dealing with increasing scope, and deploying new versions of the system.

O'Neil, Daniel A.

Characterization of concurrent processing

Computer architectures designed for concurrent processing are characterized by the number of processing elements, ensemble speed, random access memory, input/output routes, and modes of operation. The important attributes of processing tasks are then identified, and some processing stratagems are examined. It is shown that the greater the complexity of a given task, the wider the range of possible stratagems which can accomplish the task. For relatively simple tasks, the optimum stratagem can be found by analytical reasoning. For more complex tasks, however, optimum scheduling techniques may have to be employed for the assignment of segments of the task to the available processing elements.

Utku, S.

Astronaut Office Scheduling System Software

AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

Brown, Estevancio

Crew Autonomy Scheduling: Scheduling Performance Pilot Study

The purpose of this pilot study is to quantify crew performance in self-scheduling through Playbook, a mobile-based scheduling and planning tool. By investigating human performance within the task of self-scheduling, we can further develop countermeasures that can mitigate deficient scheduling performance, and evaluate changes as a result of these countermeasures. Moreover, this research can advise the development of standards and guidelines for autonomous crews in future missions. In human spaceflight today, the task of planning crew member’s schedules falls to Ops Planners. It takes many weeks to plan due to the complex impact each day-to-day activity can have on other activities, crew members, and resources. These impacts are measured as constraints, and these constraints can result in temporal, ordering, or resource requirements. As future spaceflight missions span longer distances and the latency of communication between the crew and Mission Control Center (MCC) increases, the need for crew members to work independently from MCC will also increase. This results in a need for crew members to be able to autonomously plan and adjust their own schedules.

planning

Expert system for on-board satellite scheduling and control

An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

Barry, John M.

Efficient parallel architecture for highly coupled real-time linear system applications

A systematic procedure is developed for exploiting the parallel constructs of computation in a highly coupled, linear system application. An overall top-down design approach is adopted. Differential equations governing the application under consideration are partitioned into subtasks on the basis of a data flow analysis. The interconnected task units constitute a task graph which has to be computed in every update interval. Multiprocessing concepts utilizing parallel integration algorithms are then applied for efficient task graph execution. A simple scheduling routine is developed to handle task allocation while in the multiprocessor mode. Results of simulation and scheduling are compared on the basis of standard performance indices. Processor timing diagrams are developed on the basis of program output accruing to an optimal set of processors. Basic architectural attributes for implementing the system are discussed together with suggestions for processing element design. Emphasis is placed on flexible architectures capable of accommodating widely varying application specifics.

Carroll, Chester C.