Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transfer trajectory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The first libration-point satellite - Mission overview and flight history

On August 12, 1978, a scientific spacecraft called International Sun-Earth Explorer-3 (ISEE-3) was launched towards the interior sun-earth libration point, L1. The spacecraft was placed into a 'halo orbit' around the L1 point on November 20, 1978, thus becoming the first libration-point satellite. During its 100-day transfer trajectory, ISEE-3 lingered in a region where the gravitational effects of the sun and the earth are comparable, leading to some interesting tradeoffs concerning the maneuver strategy for halo-orbit insertion. Following orbit insertion, stationkeeping maneuvers were required to maintain the delicate equilibrium in the halo orbit. Details are presented for all of the velocity change maneuvers that were executed prior to the completion of the first halo orbit on May 14, 1979. Orbit selection, trajectory design, and the scientific objectives of the ISEE-3 mission are also discussed.

Farquhar, R. W.↗

Contingency plans for the ISEE-3 libration-point mission

During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

Dunham, D. W.↗

The ESA mission to Comet Halley

The Europeon Space Agency's approximately Giotto mission plans for a launch in July 1985 with a Halley encounter in mid-March 1986 4 weeks after the comet's perihelion passage. Giotto carries 10 scientific experiments, a camera, neutral, ion and dust mass spectrometers, a dust impact detector system, various plasma analyzers, a magnetometer and an optical probe. The instruments are described, the principles on which they are based are described, and the experiment key performance data are summarized. The launch constraints the helicentric transfer trajectory, and the encounter scenario are analyzed. The Giotto spacecraft major design criteria, spacecraft subsystem and the ground system are described. The problem of hypervelocity dust particle impacts in the innermost part of the coma, the problem of spacecraft survival, and the adverse effects of impact-generated plasma aroung the spacecraft are considered.

Reinhard, R.↗

International solar polar mission: The vector helium magnetometer

The functional requirements for the vector helium magnetometer (VHM) on the Solar Polar spacecraft are presented. The VHM is one of the two magnetometers on board that will measure the vector magnetic field along the Earth to Jupiter transfer trajectory, as well as in the vicinity of Jupiter and along the solar polar orbit following the Jupiter encounter. The interconnection between these two magnetometers and their shared data processing unit is illustrated.

Source record↗

Mission and vehicle sizing sensitivities

Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low Earth orbit to one mission mode and mission opportunity. Data are presented to show the requirements for Earth-Mars opposition and conjunction class roundtrip flyby and stopover mission opportunities available during the time period from year 1997 to year 2045. The interplanetary space vehicle consists of a spacecraft and a space vehicle acceleration system. Propellant boil-off for the various mission phases is given for the Lox/LH (Liquid Oxygen/Liquid Hydrogen) propulsion systems. Mission abort information is presented for the 1999 Venus outbound swingby trajectory, transfer profile.

Archie C Young↗

Mars Mission profile options and opportunities

Mars Mission profile options and mission requirements data are presented for Earth-Mars opposition and conjunction class round-trip flyby and stopover mission opportunities. The opposition class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition class mission. The conjunction class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low Earth orbit to one mission profile option and mission opportunity to another.

Young, Archie C.↗

The Ninevah Mission: A design summary for an unmanned mission to Venus, volume 1

The design summary for an unmanned mission to the planet Venus, with code name Ninevah, is presented. The design includes a Hohmann transfer trajectory analysis, propulsion trade study, an overview of the communication and instrumentation systems, power requirements, probe and lander analysis, and a weight and cost analysis.

Source record↗

Mars Mission profile options and opportunities

Mars Mission profile options and mission requirements data are presented for earth-Mars opposition and conjuction class round-trip flyby and stopover mission opportunities. The opposition class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition-class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition-class mission. The conjuction-class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low earth orbit to one mission profile option and mission opportunity to another.

Young, Archie C.↗

Giotto Extended Mission (GEM)

The primary objectives of the Giotto Extended Mission (GEM), are to determine the composition and physical state of the Grigg Skjellerup Comet's nucleus; to determine the processes that govern the composition and distribution of neutral and ionized species in the cometary atmosphere. Giotto consists of a single European Space Agency (ESA) spacecraft that was launched in 1985 from Center Spatial Guyanis in French Guiana on an Ariane launch vehicle. After a successful launch into geostationary orbit and a heliocentric transfer trajectory, the spacecraft successfully encountered Halley's Comet in 1986. One month after encountering Halley's Comet, Mar. 1986, the spacecraft was placed in hibernation in a heliocentric orbit slightly less than 1 AU. Between Feb. and Jul. 1990 the spacecraft was successfully reactivated, checked out, and placed on a trajectory course to intercept comet Grigg Skjellerup. The spacecraft has been in hibernation since Jul. 1990. Information is presented in tabular form in the following areas: coverage goals, Deep Space Network Support, frequency assignments, telemetry, command, and tracking support responsibility.

Wilkins, D. E. B.↗

Nuclear thermal rocket propulsion application to Mars missions

Options for vehicle configurations are reviewed in which nuclear thermal rocket (NTR) propulsion is used for a reference mission to Mars. The scenario assumes an opposition-class Mars transfer trajectory, a 435-day mission, and the use of a single nuclear engine with 75,000 lbs of thrust. Engine parameters are examined by calculating mission variables for a range of specific impulses and thrust/weight ratios. The reference mission is found to have optimal values of 925 s for the specific impulse and thrust/weight ratios of 4.0 and 0.06 for the engine and total stage ratios respectively. When the engine thrust/weight ratio is at least 4/1 the most critical engine parameter is engine specific impulse for reducing overall stage weight. In the context of this trans-Mars three-burn maneuver the NTR engine with an expander engine cycle is considered a more effective alternative than chemical/aerobrake and other propulsion options.

Emrich, W. J., Jr.↗

Galileo: Challenges enroute to Jupiter

The Galileo spacecraft is now on its three-year direct Earth-to-Jupiter transfer trajectory. Jupiter arrived (Probe entry) is scheduled for 2:05 pm PST, December 7, 1995. The Galileo Probe will be the first human-made object to enter the atmosphere of an outer planet, while the Orbiter will be the first artificial satellite of an outer planet. A two-year Jupiter orbital mission is planned. Following launch on October 18, 1989, Galileo spent just over three years executing its Venus-Earth-Earth Gravity Assist (VEEGA) mission phase to achieve the heliocentric energy necessary to reach Jupiter. Midway through its Earth-to-Earth leg, on October 29, 1991, Galileo became the first spacecraft to encounter an asteroid. Six months earlier in April 1991, the spacecraft's high-gain antenna (HGA) failed to deploy properly. The special guidance, navigation, and control (GN&C) problems associated with a 20-month campaign of maneuvers to free the stuck antenna and successfully perform the asteroid encounter without it are described. The overall mission and spacecraft status are also reported.

O'Neil, William J.↗

Optimum transfer to a large-amplitude halo orbit for the Solar and Heliospheric Observatory (SOHO) spacecraft

The Solar and Heliospheric Observatory (SOHO), built by the European Space Agency to study the Sun as part of the International Solar-Terrestrial Physics (ISTP) Program, will be launched in July 1995 into a transfer trajectory that terminates in a large-amplitude halo orbit. The spacecraft will enter the halo orbit by performing one insertion maneuver at a specified point on the halo orbit. The position on the halo orbit that requires the least fuel for the insertion maneuver is identified using the planar, circular restricted three-body problem as a model. Fuel costs for halo orbit insertion at other points in the orbit are also identified. Practical trajectories incorporating all significant accelerations are discussed. The use of a lunar swingby to avoid any insertion maneuver is mentioned.

Stalos, S.↗

The Solar and Heliospheric Observatory (SOHO) Mission: An Overview of Flight Dynamics Support of the Early Mission Phase

The SOHO spacecraft was successfully launched by an Atlas 2AS from the Eastern Range on December 2, 1995. After a short time in a nearly circular parking orbit, the spacecraft was placed by the Centaur upper stage on a transfer trajectory to the L1 libration point where it was inserted into a class 1 Halo orbit. The nominal mission lifetime is two years which will be spent collecting data from the Sun using a complement of twelve instruments. An overview of the early phases of Flight Dynamics Facility support of the mission is given. Maneuvers required for the mission are discussed, and an evaluation of these maneuvers is given with the attendent effects on the resultant orbit. Thruster performance is presented as well as real time monitoring of thruster activity during maneuvers. Attitude areas presented are the star identification process and role angle determination, momentum management, operating constraints on the star tracker, and guide star switching. A brief description of the two Heads Up displays is given.

Short, R.↗

Fast Interplanetary Missions with Low-Thrust Propulsion Systems

A simple family of indirect-transfer trajectories between circular orbits is used to evaluate the mass ratio required to complete round-trip interplanetary missions using low-thrust propulsion systems. These trajectories, although not optimum, yielded very substantial reductions in total round-trip time for Mars missions with moderate increases in initial weight. For a powerplant specific weight a of 10 pounds per kilowatt of jet power, trip times were reduced from 1200 to 600 days, for a typical manned mission, with an initial weight increase of a factor of two. Comparison with a nuclear rocket with 1000-second specific impulse indicated that the electric-propulsion system required less initial weight for trip times as low as 550 days with alpha equal to 10 and as low as 400 days with alpha equal to 5 pounds per kilowatt. Further weight reductions would be expected with more nearly optimum trajectories.

Moeckel, W. E.↗

Human Mars Mission: SEP Architecture Crew Taxi Propulsion Stage Study and Design and Technology for Reaction and Control System

The Mars exploration is a candidate pathway to expand human presence and useful activities in the solar system. There are several propulsion system options being considered to place the Mars payload on its inter-planetary transfer trajectory. One propulsion option is the use of Solar Electric Propulsion (SEP) to spiral out with the Mars payload from an initial Low Earth Orbit (LEO) to an elliptical High Earth Orbit (HEO). This report, presented in annotated facing page format, describes the work completed on the design of a crew taxi propulsion stage used in conjunction with the SEP. Transportation system/mission analysis topics covered in this report include sub-system analysis, trajectory profile description, mass performance and crew taxi stage sizing, stage configuration, stage cost, and Trans-Mars Injection (TMI) launch window. The high efficiency of SEP is used to provide the major part of the TMI propulsion maneuver. Orbital energy is continuously added over a period of approximately twelve months. The SEP and Mars payload follow a spiral trajectory from an initial LEO to a final elliptical HEO. A small chemical stage is then used to provide the final part of the TMI. The now unloaded SEP returns to LEO to repeat another spiral trajectory with payload to HEO. The spiral phase of the SEP's trajectory takes several months to reach HEO, thus significantly increasing the exposure time of the crew to zero-gravity. In order to minimize the long zero-gravity effects, a high thrust chemical stage delivers the crew to the SEP's HEO. The crew rendezvous with the Mars payload in HEO. After a checkout period the Mars payload with the crew is injected onto a Trans-Mars Trajectory by a small chemical stage.

Young, Archie↗

Human Mars Mission: SEP Architecture, Crew Taxi Propulsion Stage Study and Design and Technology for Reaction and Control System

The Mars exploration is a candidate pathway to expand human presence and useful activities in the solar system. There are several propulsion system options being considered to place the Mars payload on its interplanetary transfer trajectory. One propulsion option is the use of Solar Electric Propulsion (SEP) to spiral out with the Mars payload from an initial Low Earth Orbit (LEO) to an elliptical High Earth Orbit (HEO). This report, presented in annotated facing page format, describes the work completed on the design of a crew taxi propulsion stage used in conjunction with the SEP. Transportation system/mission analysis topics covered in this report include sub-system analysis, trajectory profile description, mass performance and crew taxi stage sizing, stage configuration, stage cost, and Trans-Mars Injection (TMI) launch window. The high efficiency of SEP is used to provide the major part of the TMI propulsion maneuver. Orbital energy is continuously added over a period of approximately twelve months. The SEP and Mars payload follow a spiral trajectory from an initial LEO to a final elliptical HEO. A small chemical stage is then used to provide the final part of the TMI. The now unloaded SEP returns to LEO to repeat another spiral trajectory with payload to HEO. The spiral phase of the SEP's trajectory takes several months to reach HEO, thus significantly increasing the exposure time of the crew to zero-gravity. In order to minimize the long zero-gravity effects, a high thrust chemical stage delivers the crew to the SEP's HEO. The crew rendezvous with the Mars payload in HEO. After a checkout period the Mars payload with the crew is injected onto a Trans-Mars Trajectory by a small chemical stage.

Young, Archie↗

Orbit Determination Issues for Libration Point Orbits

Libration point mission designers require knowledge of orbital accuracy for a variety of analyses including station keeping control strategies, transfer trajectory design, and formation and constellation control. Past publications have detailed orbit determination (OD) results from individual libration point missions. This paper collects both published and unpublished results from four previous libration point missions (ISEE (International Sun-Earth Explorer) -3, SOHO (Solar and Heliospheric Observatory), ACE (Advanced Composition Explorer) and MAP (Microwave Anisotropy Probe)) supported by Goddard Space Flight Center's Guidance, Navigation & Control Center. The results of those missions are presented along with OD issues specific to each mission. All past missions have been limited to ground based tracking through NASA ground sites using standard range and Doppler measurement types. Advanced technology is enabling other OD options including onboard navigation using seaboard attitude sensors and the use of the Very Long Baseline Interferometry (VLBI) measurement Delta Differenced One-Way Range (DDOR). Both options potentially enable missions to reduce coherent dedicated tracking passes while maintaining orbital accuracy. With the increased projected loading of the DSN (Deep Space Network), missions must find alternatives to the standard OD scenario.

Beckman, Mark↗

Orbit Determination Issues for Libration Point Orbits

Libration point mission designers require knowledge of orbital accuracy for a variety of analyses including station keeping control strategies, transfer trajectory design, and formation and constellation control. Past publications have detailed orbit determination (OD) results from individual notation point missions. This paper collects both published and unpublished results from four previous notation point missions (ISEE-3, SOHO, ACE and MAP) supported by Goddard Space Flight Center's Guidance, Navigation & Control Center. The results of those missions are presented along with OD issues specific to each mission. All past missions have been limited to ground based tracking through NASA ground sites using standard marine and Doppler measurement types. Advanced technology is enabling other OD options including onboard navigation using onboard attitude sensors and the use of the Very Long Baseline Interferometry (VLBI) measurement Delta Differenced One-Way Range (DDOR). Both options potentially enable missions to reduce coherent dedicated tracking passes while maintaining orbital accuracy. With the increased projected loading of the DSN, missions must find alternatives to the standard OD scenario.

Beckman, Mark↗