Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission System Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

What Is Power System Curtailment?

Curtailment is the intentional reduction of instantaneous power from non- dispatchable variable renewable energy (VRE) resources like wind and solar photovoltaics relative to what would naturally be available from the wind and the sun. This curtailed energy is the difference between the total available energy and actual production. This fact sheet provides a summary of curtailment in power systems and presents selected insights into specific ways in which curtailment is implemented by a selection of System Operators.

curtailment↗

Specifying angular reference for robust three-phase state estimation

While the phase angle of any of the bus voltages can be chosen as the angular reference in the state estimation formulation of positive sequence networks, the same approach does not readily extend to three-phase network state estimation problem. It is commonly assumed that there is at least one bus where the bus voltages are perfectly balanced with phase angles displaced ±120° and these balanced three phase voltages are used as the three-phase reference in solving the three-phase state estimation problem. This assumption may be quite realistic in transmission networks, and for distribution networks with a strong transmission system connection. However, it might not be realistic to assume existence of a perfectly balanced reference bus in today’s distribution systems with ever increasing penetration of renewable sources or for isolated operation of microgrids. In this paper, a novel state estimation formulation will be presented which facilitates correct solution irrespective of the existence of buses with perfectly balanced voltages. The new formulation is general, and lends itself to bad data processing. It yields accurate results in any three-phase power system irrespective of its operating conditions (balanced or highly unbalanced), configuration (isolated microgrid, connected to transmission system, etc.) and whether or not it contains any synchronous generators. The performance of the method is validated using the IEEE 123 bus three-phase system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Federated Cyber-Transmission-Distribution Testbed Architecture for the Resiliency Analysis

With the ongoing automation driven by the push toward the smart electric grid and the advancement in associated cyber infrastructure, the interaction between physical [electric transmission and distribution (T&D) systems], cyber (communication, automation, and control), and human (grid operators and decision-makers) is increasingly becoming more complex. This creates the requirement of analyzing the effect of the transmission system on the distribution system and vice versa with consideration of the additional complexity of the cyber infrastructure. Such an integrated testbed will also help with resiliency analysis, where resiliency refers to the ability of the system to continue serving energy to the critical loads even with limited extreme contingencies. Interaction of the physical power grid with the cyber layer can be effectively modeled using real-time (RT) simulator for developing and validating various operational and control algorithms. Testbeds using RT simulators with multiple capabilities have been developed at different institutions. Still, no single existing testbed can offer full scalability while simultaneously meeting high fidelity requirements for resiliency experimentation. Co-simulating federated testbed assets can provide a scalable experimentation platform that can be leveraged for verification and validation. In this article, an architecture is developed for federated cyber-physical testbed. A local federation with two real-time simulators is developed: real-time digital simulator (RTDS) and OPAL-RT have been interfaced using VILLAS framework for end-to-end testing. Also, a real-time linear predictor is developed and integrated here to address the communication latency impact on geographically allocated federated RT simulation. Finally, resiliency analysis tools are formulated and utilized for T&D systems. Finally as an illustrative use case, the resiliency of a T&D test system is simulated, and the results are analyzed. A 179-bus Western Electricity Coordinating Council (WECC) transmission system is developed using OPAL-RT/ HYPERSIM, and a modified IEEE 13 node feeder system is modeled in RTDS/RSCAD and interfaced for resiliency analysis.

42 ENGINEERING↗

Robust Distributed State Estimator for Interconnected Transmission and Distribution Networks (Final Report RPPR-1)

This project’s objective is to develop a combined transmission and distribution state estimator which accounts for very large system size and model complexity (by way of distributing the computations) and large number of solar PV units connected to the distribution system on multiple feeders. The project not only provides a robust formulation and solution to this problem but also tests the solution by implementing it on a well-established large utility system. It introduces several improvements with respect to the state of the art in existing state estimation software: (a) The developed state estimator (SE) allows robust and accurate monitoring of bidirectional flows in distribution systems which result due to the distributed energy sources which are not observable and thus not incorporated in generation dispatch; (b) Large utility systems with tens of thousands of transmission buses and hundreds of thousands of distribution nodes are difficult to model as a single integrated system. This shortcoming is addressed by developing a “scalable distributed computational framework” which allows splitting the ultra large system models into several small subsystems and coordinating their solution by a robust and practical state estimation formulation; (c) Measurement errors irrespective of their locations are detected and removed by the developed state estimator. Historically, transmission and distribution systems were analyzed and operated as two independent systems. Given the non-transposed short feeder sections, unevenly loaded phases, strictly radial configuration and unidirectional power flows in the absence of remote generation, distribution system analysis was customized to account for these characteristics. However, some of these assumptions are no longer valid (non-radial configuration, bidirectional power flows) and thus distribution system analysis should be revisited. Furthermore, in the past, the interaction between the transmission and distribution systems was quite passive, where distribution substations were modeled as lumped loads in the transmission system model. With substantial generation injected by renewable generation located in the distribution systems, such modeling will no longer be accurate. The developed state estimator facilitates proper monitoring of the interactions between the transmission and distribution systems and enables smart dispatch of these units which are made observable by the state estimator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model analysis of remotely controlled rendezvous and docking with display prediction

Manual control of rendezvous and docking (RVD) of two spacecraft in low earth orbit by a remote human operator is discussed. Experimental evidence has shown that control performance degradation for large transmission delays (between spacecraft and operations control center) can be substantially improved by the introduction of predictor displays. An intial Optimal Control Model (OCM) analysis of RVD translational and rotational perturbation control was performed, with emphasis placed on the predictive capabilities of the combined Kalman estimator/optimal predictor with respect to control performance, for a range of time delays, motor noise levels and tracking axes. OCM predictions are then used as a reference for comparing tracking performance with a simple predictor display, as well as with no display prediction at all. Use is made here of an imperfect internal model formulation, whereby it is assumed that the human operator has no knowledge of the system transmission delay.

Milgram, P.↗

New Technologies for Power System Operation and Analysis, 1st Edition

New Technologies for Power System Operation and Analysis considers the very latest developments in renewable energy integration and system operation, including electricity markets and wide-area monitoring systems and forecasting. Helping readers quickly grasp the essential information needed to address renewable energy integration challenges, this new book looks at basic power system mathematical models, advanced renewable integration and system optimizations from transmission and distribution system sides. Sections cover wind, solar, gas and petroleum, making this a useful reference for all engineers interested in power system operation.

electricity markets↗

Multi-Stage and Multi-Timescale Robust Co-Optimization Planning for Reliable and Sustainable Power Systems. Final Report

In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Features Of Cavity Flow And Acoustics Of Stratospheric Observatory For Infrared Astronomy

The stratospheric observatory for infrared astronomy (SOFIA) is a 2.5 meter aperture Cassegrain telescope with a Nasmyth focus that will be housed in an open cavity in the Boeing 747-SP aircraft and operated at altitudes around 41,000 feet for infrared (IR) viewing of celestial events of astronomical nature. At these altitudes the IR viewing capability of SOFIA far exceeds that of any ground based system. To minimize IR transmission losses, SOFIA will operate with an open cavity. Such an open cavity during flight creates several challenging aerodynamic and aeroacoustic design problems. Foremost of these are: the shear layer over the cavity may cause unwanted resonance if the cavity is untreated; this might give rise to excessive sound pressure levels (SPL) in the cavity and thus affect the unsteady loads on the telescope; the unsteady flow within the cavity produces large dynamic loads and moments that will impact the pointing accuracy of the telescope; the open cavity and the shear layer control devices produce additional drag that will affect directly the time of flight of the mission; the aft location of the cavity down stream of port wing will affect the the flow on the aircraft control surfaces and thus the stability of the aircraft. Also, the highly turbulent shear layer over the cavity and the temperature gradients and 'hot spots' within the cavity can produce a wave front error of the image when it reaches the focal plane of the recorder.

Srinivasan, G. R.↗

Practical Event Location Estimation Algorithm for Power Transmission System Based on Triangulation and Oscillation Intensity

Event location in power systems is quite essential information for system operators to enhance control-room situational awareness capability. Therefore, it is of great importance to develop an event location estimation algorithm for transmission systems with high accuracy. With the development of wide-area measurement system (WAMS) such as FNET/GridEye, and the synchrophasor measurement devices (SMDs) such as frequency disturbance recorders (FDRs), the synchronous measurement data including frequency, voltage amplitude and phase angle can be collected and used for event location estimation. First, the phase angle and rate of change of frequency (RoCoF) trajectories are respectively used for determining two sets of wave arrival time associated with each FDR. Then, a convolutional neural network (CNN) is utilized to determine the wave arrival order to select the more suitable set of wave arrival times for a given case and to perform corresponding modifications. Next, the oscillation intensity associated with each FDR is determined based on phase angle trajectories in the center of inertia (COI) coordinate system. Finally, the multiple criteria for event location estimation are represented. In conclusion, case studies and comparisons between the proposed and previous algorithms using actual and confirmed cases in U.S. power systems are performed to demonstrate the effectiveness and improvement of the proposed algorithm in practical applications.

frequency disturbance recorder (FDR)↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulation of Cross-Border Renewable Energy Trading in South Asia [Slides]

India's national renewable energy zones for wind power and solar photovoltaics (PV) could become regional green power resources if South Asian countries liberalize their rules for cross-border energy trading (CBET). Similarly, Nepal's wealth of hydropower could be more valuable to Nepal and its neighbors with greater market integration. These are the findings of a study by the U.S. National Renewable Energy Laboratory (NREL) that tested trading scenarios for wind power, solar power, and hydropower among Bangladesh, India, Nepal, and Sri Lanka. The NREL study found that wheeling power through India's interstate transmission system (ISTS) could be just as efficient operationally as building new high-voltage direct current (HVDC) lines from the renewable energy zones directly to the importing country. This means that CBET integration could substitute for new long-distance HVDC transmission - which could cost billions of dollars - while delivering to all participating countries the same benefits for renewable energy development and decarbonization.

13 HYDRO ENERGY↗

Cross-Border Electricity Trading and Renewable Energy Zones

India's national renewable energy zones for wind power and solar photovoltaics (PV) could become regional green power resources if South Asian countries liberalize their rules for cross-border energy trading (CBET). Similarly, Nepal's wealth of hydropower could be more valuable to Nepal and its neighbors with greater market integration. These are the findings of a study by the U.S. National Renewable Energy Laboratory (NREL) that tested trading scenarios for wind power, solar power, and hydropower among Bangladesh, India, Nepal, and Sri Lanka. The NREL study found that wheeling power through India's interstate transmission system (ISTS) could be just as efficient operationally as building new high-voltage direct current (HVDC) lines from the renewable energy zones directly to the importing country. This means that CBET integration could substitute for new long-distance HVDC transmission - which could cost billions of dollars - while delivering to all participating countries the same benefits for renewable energy development and decarbonization.

14 SOLAR ENERGY↗

Issues concerning centralized versus decentralized power deployment

The results of a study of proposed lunar base architectures to identify issues concerning centralized and decentralized power system deployment options are presented. The power system consists of the energy producing system (power plant), the power conditioning components used to convert the generated power into the form desired for transmission, the transmission lines that conduct this power from the power sources to the loads, and the primary power conditioning hardware located at the user end. Three power system architectures, centralized, hybrid, and decentralized, were evaluated during the course of this study. Candidate power sources were characterized with respect to mass and radiator area. Two electrical models were created for each architecture to identify the preferred method of power transmission, dc or ac. Each model allowed the transmission voltage level to be varied at assess the impact on power system mass. The ac power system models also permitted the transmission line configurations and placements to determine the best conductor construction and installation location. Key parameters used to evaluate each configuration were power source and power conditioning component efficiencies, masses, and radiator areas; transmission line masses and operating temperatures; and total system mass.

Metcalf, Kenneth J.↗

Deep Reinforcement Learning-Based Control of Energy Storage for Interarea Oscillation Damping

With the increasing electricity consumption and lack of transmission investment, today's power systems are operated much closer to their limits, raising concerns of inter-area oscillations that deteriorate the system stability. Here, this article presents a novel energy storage placement and control approach for enhanced damping of interarea oscillations. Combining the residual analysis and dominant mode analysis, we are able to identify the advantageous locations for placing energy storage that achieve improved damping performance. To overcome the challenges, such as fixed control parameters and insufficient damping, we propose to use a deep reinforcement learning-based approach for energy storage control. A state-of-the-art guided surrogate-gradient-based evolutionary strategy is used to train a learning agent in a robust, efficient, and reproducible manner. Parallel computing is also adopted to speed up the training process. The proposed strategy has been tested on both medium and large-scale systems. The proposed methods have demonstrated their effectiveness in mitigating various interarea oscillations within a timeframe of 20 s, thereby averting system collapse and enhancing power grid stability effectively.

25 ENERGY STORAGE↗

Multibus-based parallel processor for simulation

A Multibus-based parallel processor simulation system is described. The system is intended to serve as a vehicle for gaining hands-on experience, testing system and application software, and evaluating parallel processor performance during development of a larger system based on the horizontal/vertical-bus interprocessor communication mechanism. The prototype system consists of up to seven Intel iSBC 86/12A single-board computers which serve as processing elements, a multiple transmission controller (MTC) designed to support system operation, and an Intel Model 225 Microcomputer Development System which serves as the user interface and input/output processor. All components are interconnected by a Multibus/IEEE 796 bus. An important characteristic of the system is that it provides a mechanism for a processing element to broadcast data to other selected processing elements. This parallel transfer capability is provided through the design of the MTC and a minor modification to the iSBC 86/12A board. The operation of the MTC, the basic hardware-level operation of the system, and pertinent details about the iSBC 86/12A and the Multibus are described.

Ogrady, E. P.↗

Satellite Power Systems /SPS/ - Overview of system studies and critical technology

Systems studies and critical technology issues for the development and evaluation of Satellite Power Systems (SPS) for the photovoltaic generation of electrical energy and its transmission to earth are reviewed. Initial concept studies completed in 1976 and system definition studies initiated in the same year have indicated the technical feasibility of SPS and identified challenging issues to be addressed as part of the SPS Concept Development and Evaluation Program. Systems considered in the study include photovoltaic and solar thermal power conversion configurations employing klystron or solid state microwave generators or lasers for power transmission, and power transmission options, system constructability and in-orbit and ground operations. Technology investigations are being performed in the areas of microwave power transmission, structure/controls interactions and the behavior of key materials in the space/SPS environment. Favorable results have been obtained in the areas of microwave phase distribution and phase control, dc-RF conversion, antenna radiating element, and no insurmountable problems have been discovered in any of the investigations to date.

Manson, S. V.↗