Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tribes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗

Advancing Energy Justice in Alaska

NREL works with remote and rural communities across Alaska and the world to develop energy and building technologies that enhance culture, strengthen economies, and improve resilience in a changing environment. Alaska and Arctic communities not only face one of the harshest climates on earth; they also pay some of the highest energy and housing costs in the nation. NREL's Alaska Campus collaborates with communities and tribes to develop affordable, culturally appropriate homes and buildings that combine traditional knowledge and twenty-first century technology. Demonstration homes deployed all over Alaska prove out new technologies in energy efficiency, foundations, indoor air quality, and clean energy. Local workforce development is incorporated into every project: new homes are built by local workers, often including the home's future occupant. With the Arctic warming twice as fast as the rest of the planet, coastal erosion and thawing permafrost are wreaking havoc on roads, buildings, and infrastructure across Alaska. With an inclusive approach to R&D, NREL is helping communities adapt to a changing environment and advancing energy justice in the world's extremes.

Alaska housing prototypes↗

Panel Session 116: Waste Management from Remediation of Legacy Sites or Unplanned Releases

Past experiences have shown that there is often a disconnect between Indigenous societies and Western society. This disconnect can be attributed to different value systems between these two group and is not limited to the USA and Canada but also extends into Australia, New Zealand, and the Central Asia Republics (the 'five Stans'). The intent of this Panel Session to give voice to representatives from Indigenous communities, the challenges presented in remediation processes, and potential solutions. Standard risk assessment assumptions developed for Western societies often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. This panel focused on the perspectives of Indigenous societies (e.g., Indian Tribes (US), First Nations (Canada)) related to risk assessment of environmental remediation challenges, including deep geological disposal of HLW and ILW, near-surface disposal of LLW and in-situ entombment of nuclear reactor components, and environmental remediation of abandoned uranium mines and historic wastes. Standard risk assessment assumptions often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. Factoring those into a risk assessment that still meets regulatory requirements and policies such as reasonably anticipated land use at US EPA CERCLA sites can be challenging but has the potential to lead to a site or facility approach that is more accepted. Panelists with presentations: The U.S. Nuclear Regulatory Commission Regulatory Process - A Path for Indigenous Knowledge? (Francis Cameron); Local Community Perceptions and Remediation Projects (Michelle Roberts); Indigenous Perspectives on Risk Assessment (Bob Watts); Navajo Superfund Program: Fundamental Law and Traditional Ecological Knowledge (Dariel Yazzie); Risk Assessment: Two Indigenous Approaches (Whitney Fraser)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geographic Information System Based Emergency Response Training Assessments for DOE Radioactive Materials Transport - 20027

Safety and security are priorities of U.S. Department of Energy (DOE) radioactive materials shipping campaigns. In the more than 70-year history of domestic transport of spent nuclear fuel (SNF), there has never been a transportation-related radiological injury. To support transportation planning, among the tools that DOE uses is the Stakeholder Tool for Assessing Radioactive Transportation (START). START contains geospatial data and transportation route analyses capabilities designed to support a range of DOE transportation planning initiatives. One of those functions is the capability to support emergency response planning and training for State and Tribal jurisdictions located on routes used for DOE shipments of radioactive materials. As part of the Department's commitment to public safety, DOE provides federally-funded radiological response training to emergency responders along DOE radioactive materials transportation corridors through its Transportation Emergency Preparedness Program (TEPP). START contains spatial data representing the locations and emergency-response capabilities of fire departments, police, hospitals, State emergency response centers, and where TEPP-trained personnel are based. The START tool supports State and Tribal users' ability to evaluate emergency-response coverage on active and potential DOE radioactive materials transport routes through their jurisdictions, provide expected response times to reach the scene of an incident, identify equipment available to support a response, and identify the number of response personnel and their respective training levels. In addition, START can be used to identify gaps in coverage along a transportation corridor where additional radiological emergency response training may be needed. This paper describes the data, features, and functionality DOE uses to provide a resource for emergency response training needs assessments for States and Tribes along active and potential routes for transporting radioactive materials, and illustrates its use. It also discusses future plans to integrate TEPP and Federal Emergency Management Agency (FEMA) radiological training data to provide a more comprehensive source of geospatial information on personnel who have received equivalent radiological response training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el↗

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including considerations for planning, proposing, designing, procuring, and funding microgrid projects for resilience.

C2C↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Evaluating and Prioritizing Municipal Buildings for Energy Efficiency and Decarbonization Investment

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort.

buildings↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Incorporating Community Priorities into Electric Vehicle Plans and Projects

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including key steps that can be taken to help entities design effective community engagement processes around clean mobility.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

State-Tribal Collaboration: Utility Programs

This is one of 6 fact sheets for the State/Tribal Collaboration project for Office of Policy. This fact sheets discusses low-income utility programs that can benefit Tribes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS↗

Lessons Learned from the Energy to Communities (E2C) Peer-Learning Cohort on Engaging with Electric Utilities for Successful Local Partnerships

NLR designed and led a six-month peer-learning cohort from July through December 2025 on “Engaging With Electric Utilities for Successful Local Partnerships” as part of the U.S. Department of Energy’s Energy to Communities (E2C) program. Representatives from 15 local and regional governments from across the United States participated in monthly workshops covering best practices for engaging with their utilities to advance their own energy goals. This document shares key takeaways, lessons learned, and resources from the cohort that may be useful to local governments, regional governments, or Tribes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bull Trout and Westslope Cutthroat Trout movement in a dam tailrace

Populations of Bull Trout Salvelinus confluentus and Westslope Cutthroat Trout Oncorhynchus clarkii lewisi in the Pend Oreille Basin have declined, partly due to fragmentation caused by hydropower dams. This study aimed to analyze the movements and behavior of these species downstream of Albeni Falls Dam over two years to inform fishway design. Radiotracking investigations were conducted to monitor 10 adult Bull Trout and 17 adult Westslope Cutthroat Trout from September 2008 to July 2010. Macro and micro detection zones were delineated to study fine- and large-scale movements in the tailrace. Macro zones included the spillway and powerhouse tailrace areas. Micro zones were nested within macro zones to identify regions close to the dam where fishway structures could be built. Both Bull Trout and Westslope Cutthroat Trout exhibited high mobility in the dam tailrace, transitioning between macro detection zones. Seasonal variations influenced their distribution patterns. During the spring freshet migration season, both species were primarily detected at the left powerhouse micro zone. In sedentary periods (fall/winter and summer), fish actively swam throughout the tailrace, displaying search behavior. These behavior observations suggest that potential fishway entrances located near dam concrete would be effective: the area near the left powerhouse was identified as the optimal construction location. This study highlights the feasibility of designing fish passage structures to mitigate population fragmentation and support species recovery.

13 HYDRO ENERGY↗

Performance Comparisons for Artificially Propagated and Wild Pacific Lamprey Juveniles and Larvae

ABSTRACT Artificially propagated Pacific lamprey ( Entosphenus tridentatus ) are produced for restoration and for use in dam passage studies to reduce the demand for wild fish. Such uses require that animals are representative of their wild counterparts. Previous work indicated that this is true for Pacific lamprey larvae and juveniles reared in the hatchery with respect to the length of sustained swimming. However, more subtle differences in behaviour and performance that lamprey need to survive have not been assessed. In this study, artificially propagated and wild fish were compared in laboratory tests under no‐flow conditions to examine light avoidance, burrowing speed, burst swim speed, volitional routine swim speed and time to come to rest. Most larvae burrowed in less than a minute, and we found highly significant differences ( p < 0.001) between artificially propagated and wild larvae burrowing times, a critical escape behaviour. This could have implications for studies of larval entrainment at irrigation diversion canals or in turbine boils at dams. Interestingly, all of the wild juveniles tested came to rest quickly after introduction to the chamber (1.5 min), while artificially propagated lamprey swam robotically near the surface and 48% did not come to rest in the first 10 min (median time to rest = 9.5 min). In contrast, wild juveniles quickly (median = 1.47 min) sought areas near the tank bottom and attached strongly with their oral disc. Such behavioural differences could have important survival consequences for artificially propagated lamprey as they approach turbine intakes, bypass screens and irrigation diversion headgates. This study highlights the need to conduct behavioural assays that examine subtleties of fish behaviour that can be missed with traditional swim tunnel comparisons.

Frick, Kinsey [Fish Ecology Division, Northwest Fi↗