129 records · Page 8

Demonstration Assessment of LED Roadway Lighting: Philadelphia, PA

For this demonstration assessment, 10 different groups of LED luminaires were installed at three sites in Philadelphia, PA. Each of the three sites represented a different set of conditions, most importantly with regard to the incumbent HPS luminaires, which were nominally 100 W, 150 W, and 250 W. The performance of each product was evaluated based on manufacturer data, illuminance calculations, field measurements of illuminance, and the subjective impressions of both regular and expert observers. Most, but not all, of the LED luminaires had a higher rated luminous efficacy compared to the HPS product they were replacing. Some provided more lumens than their HPS counterpart, whereas others emitted fewer, and they drew between 10% and 40% less power. All of the LED luminaires had improved color rendering and a higher CCT. Field illuminance measurements were taken at each site, but the large difference in pole spacing for each area limited the usefulness of that dataset for comparing performance. However, it did reveal that the difference in measured and calculated illuminance was up to approximately 40%, and that the HPS luminaires were more likely to provide lower illuminance than predicted by calculations. In order to compare luminaire performance, supplemental calculations were performed using a single representative model of each of the three sites. These calculations showed that the delivered illuminance from the LED luminaires was generally similar to the baseline HPS luminaires. On average, the LED luminaires were predicted to provide 24% higher initial illuminance on the roadway surface, but 13 % less on the bicycle lanes and 11% less on the adjacent sidewalks. Based on the lumen depreciation factor applied to each luminaire type, the difference in predicted maintained illuminance would change. Two of the three HPS luminaires and seven of the ten LED luminaires were predicted not to meet at least one of the maintained illuminance design criteria. These results are dependent on both the lumen output and luminous intensity distribution characteristics of the luminaires. Importantly, the LED systems were designed with the intent of providing performance similar to the HPS luminaires, rather than to meet illuminance criteria. Despite lower input power for the LED luminaires, energy cost savings are not currently possible for Philadelphia because they have yet to reach an agreement for a new tariff for LED street lighting with the local utility, a situation that is common throughout the country. Even with a new tariff, energy savings alone are unlikely to result in a reasonable payback period given current LED efficacy levels. However, additional cost savings from reduced maintenance could make widespread luminaire replacement cost effective. In particular, the LED luminaires installed at one of the three sites—where the luminaires were mounted on an elevated rail track—were less susceptible the premature failure from strong vibrations. Two sets of subjective evaluations were collected: one included local residents and passersby, whereas the other was completed by lighting professionals. In general, there were only small deviations in the perception of the luminaires, and it would be difficult to select any products that were clearly superior to the others in the same category. Nonetheless, both groups generally viewed the demonstration LED lighting favorably, especially compared to the typical HPS luminaires used in Philadelphia.

GATEWAY↗

Regional Analysis of Building Distributed Energy Costs and CO2 Abatement: A U.S. - China Comparison

The following paper conducts a regional analysis of the U.S. and Chinese buildings? potential for adopting Distributed Energy Resources (DER). The expected economics of DER in 2020-2025 is modeled for a commercial and a multi-family residential building in different climate zones. The optimal building energy economic performance is calculated using the Distributed Energy Resources Customer Adoption Model (DER CAM) which minimizes building energy costs for a typical reference year of operation. Several DER such as combined heat and power (CHP) units, photovoltaics, and battery storage are considered. The results indicate DER have economic and environmental competitiveness potential, especially for commercial buildings in hot and cold climates of both countries. In the U.S., the average expected energy cost savings in commercial buildings from DER CAM?s suggested investments is 17percent, while in Chinese buildings is 12percent. The electricity tariffs structure and prices along with the cost of natural gas, represent important factors in determining adoption of DER, more so than climate. High energy pricing spark spreads lead to increased economic attractiveness of DER. The average emissions reduction in commercial buildings is 19percent in the U.S. as a result of significant investments in PV, whereas in China, it is 20percent and driven by investments in CHP. Keywords: Building Modeling and Simulation, Distributed Energy Resources (DER), Energy Efficiency, Combined Heat and Power (CHP), CO2 emissions 1. Introduction The transition from a centralized and fossil-based energy paradigm towards the decentralization of energy supply and distribution has been a major subject of research over the past two decades. Various concerns have brought the traditional model into question; namely its environmental footprint, its structural inflexibility and inefficiency, and more recently, its inability to maintain acceptable reliability of supply. Under such a troubled setting, distributed energy resources (DER) comprising of small, modular, electrical renewable or fossil-based electricity generation units placed at or near the point of energy consumption, has gained much attention as a viable alternative or addition to the current energy system. In 2010, China consumed about 30percent of its primary energy in the buildings sector, leading the country to pay great attention to DER development and its applications in buildings. During the 11th Five Year Plan (FYP), China has implemented 371 renewable energy building demonstration projects, and 210 photovoltaics (PV) building integration projects. At the end of the 12th FYP, China is targeting renewable energy to provide 10percent of total building energy, and to save 30 metric tons of CO2 equivalents (mtce) of energy with building integrated renewables. China is also planning to implement one thousand natural gas-based distributed cogeneration demonstration projects with energy utilization rates over 70percent in the 12th FYP. All these policy targets require significant DER systems development for building applications. China?s fast urbanization makes building energy efficiency a crucial economic issue; however, only limited studies have been done that examine how to design and select suitable building energy technologies in its different regions. In the U.S., buildings consumed 40percent of the total primary energy in 2010 [1] and it is estimated that about 14 billion m2 of floor space of the existing building stock will be remodeled over the next 30 years. Most building?s renovation work has been on building envelope, lighting and HVAC systems. Although interest has emerged, less attention is being paid to DER for buildings. This context has created opportunities for research, development and progressive deployment of DER, due to its potential to combine the production of power and heat (CHP) near the point of consumption and delivering multiple benefits to customers, such as cost

25 ENERGY STORAGE↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗