Search NASA⌕ Search

SEARCH · Search NASA

Results for “Update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Introducing GEOPHIRES v2.0: Updated Geothermal Techno-Economic Simulation Tool

This paper presents an updated version of the geothermal techno-economic simulation tool GEOPHIRES (GEOthermal energy for Production of Heat and electricity ('IR') Economically Simulated). GEOPHIRES combines engineering models of the reservoir, wellbores, and surface plant facilities of a geothermal plant with an economic model to estimate the capital and operation and maintenance costs, lifetime energy production, and overall levelized cost of energy. The available end-use options are electricity, direct-use heat, and cogeneration. The main updates in the new version include conversion of the source code from FORTRAN to Python, the option to import temperature data (e.g., measured or from stand-alone reservoir simulator), updated cost correlations, and more flexibility in selecting the time step and number of injection and production wells. In this paper, we provide an overview of all the updates and two case studies to illustrate the tool's new capabilities.

15 GEOTHERMAL ENERGY↗

PRELIMINARY EVALUATION OF REMOVING SNF FROM SHUTDOWN SITES – 2016 UPDATE

An updated evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. This paper provides summary information on the 13 shutdown sites as well detailed information gathered from site visits to San Onofre and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure, (3) an evaluation of the near-site transportation infrastructure and transportation experience, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating SNF data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

gtcc waste, unf, used nuclear fuel, transportation↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - 2016 Update - 17086

An updated evaluation of removing used or spent nuclear fuel (SNF)2 from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating spent nuclear fuel data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 2: 30 Year Anniversary of US DOE-Environmental Management-EM Update

This panel focused on Senior US DOE Managers from Washington, D.C. speaking on the pressing issues facing US DOE EM sites and the 30 year anniversary of DOE - EM. The panel was moderated by Martin Schneider, Longenecker and Associates. Presentations proposed include: 1 - DOE Environmental Management Update From EM-2 (Mark Gilbertson, US DOE EM (USA)); 2 - DOE Environmental Management Update From EM-3 (Jeffrey Griffin, US DOE EM (USA)); 3 - DOE Environmental Management Update From EM-4 (Betsy Connell, US DOE EM (USA)); 4 - DOE Environmental Management Update From EM-5 (Steve Trischman, US DOE EM (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Test Reactor Safety Basis Update for Gas-Cooled Experiments

The Advanced Test Reactor (ATR) supports neutron irradiation of several types of experiments. One such experiment type is referred to as a gas leadout. Gas leadout experiments actively flow gas through the experiment which allows for active temperature control. It also allows for in-situ data of the experiment. For example, fission gas migration through a fuel sample can be monitored via activity of the sweep gas. Historically, ex-pile equipment and fission product monitors were housed in shielded ATR cubicles. Due to other facility updates, cubicle space is no longer available for gas leadout experiment equipment. To support continued operation of gas leadout experiments, ATR completed a safety basis update that supports a new housing for leadout equipment that may process potentially contaminated gas. In addition to the structure and associated equipment, technical safety requirements regarding handling and storage of experiments needed to be revised to support fueled gas leadout experiments and associated outage configurations. The safety basis update addressed the full lifecycle of these experiments, including experiment movement and interim storage, and credible abnormal events such as failures or leaks in contaminated gas tubing in occupied areas. This paper discusses the completed analyses performed to support the safety basis update associated with gas leadout experiments, including thermal-hydraulic evaluation, probabilistic analysis, and dose consequence analyses.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update to the Ground-Water Withdrawals Database for the Death Valley REgional Ground-Water Flow System, Nevada and California, 1913-2003

Ground-water withdrawal estimates from 1913 through 2003 for the Death Valley regional ground-water flow system are compiled in an electronic database to support a regional, three-dimensional, transient ground-water flow model. This database updates a previously published database that compiled estimates of ground-water withdrawals for 1913–1998. The same methodology is used to construct each database. Primary differences between the 2 databases are an additional 5 years of ground-water withdrawal data, well locations in the updated database are restricted to Death Valley regional ground-water flow system model boundary, and application rates are from 0 to 1.5 feet per year lower than original estimates. The lower application rates result from revised estimates of crop consumptive use, which are based on updated estimates of potential evapotranspiration. In 2003, about 55,700 acre-feet of ground water was pumped in the DVRFS, of which 69 percent was used for irrigation, 13 percent for domestic, and 18 percent for public supply, commercial, and mining activities.

58 GEOSCIENCES↗

Lamb shift in muonic hydrogen-I. Verification and update of theoretical predictions

Research Highlights: > The QED theory of muonic hydrogen energy levels is verified and updated. > Previously obtained results of Pachucki and Borie are confirmed. > The influence of the vacuum polarization potential onto the Bethe logarithm is calculated nonperturbatively. > A model-independent estimate of the Zemach moment correction is given. > Parametrically, the observed discrepancy of theory and experiment is shown to be substantial and large. - Abstract: In view of the recently observed discrepancy of theory and experiment for muonic hydrogen [R. Pohl et al., Nature 466 (2010) 213], we reexamine the theory on which the quantum electrodynamic (QED) predictions are based. In particular, we update the theory of the 2P-2S Lamb shift, by calculating the self-energy of the bound muon in the full Coulomb + vacuum polarization (Uehling) potential. We also investigate the relativistic two-body corrections to the vacuum polarization shift, and we analyze the influence of the shape of the nuclear charge distribution on the proton radius determination. The uncertainty associated with the third Zemach moment <r{sup 3}>{sub 2} in the determination of the proton radius from the measurement is estimated. An updated theoretical prediction for the 2S-2P transition is given.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The updated billion-ton resource assessment

This paper summarizes the results of an update to a resource assessment, published in 2005, commonly referred to as the billion-ton study (BTS). The updated results are consistent with the 2005 BTS in terms of overall magnitude. However, in looking at the major categories of feedstocks the forest residue biomass potential was determined to be less owing to tighter restrictions on forest residue supply including restrictions due to limited projected increase in traditional harvest for pulpwood and sawlogs. The crop residue potential was also determined to be less because of the consideration of soil carbon and not allowing residue removal from conventionally tilled corn acres. The energy crop potential was estimated to be much greater largely because of land availability and modeling of competition among various competing uses of the land. Generally, the scenario assumptions in the updated assessment are much more plausible to show a billion-ton resource, which would be sufficient to displace 30% or more of the country s present petroleum consumption.

09 BIOMASS FUELS↗

Parameter estimation with maximal updated densities

A recently developed measure-theoretic framework solves a stochastic inverse problem (SIP) for models where uncertainties in model output data are predominantly due to aleatoric (i.e., irreducible) uncertainties in model inputs (i.e., parameters). The subsequent inferential target is a distribution on parameters. Another type of inverse problem is to quantify uncertainties in estimates of “true” parameter values under the assumption that such uncertainties should be reduced as more data are incorporated into the problem, i.e., the uncertainty is considered epistemic. A major contribution of this work is the formulation and solution of such a parameter identification problem (PIP) within the measure-theoretic framework developed for the SIP. The approach is novel in that it utilizes a solution to a stochastic forward problem (SFP) to update an initial density only in the parameter directions informed by the model output data. In other words, this method performs “selective regularization” only in the parameter directions not informed by data. Further, the solution is defined by a maximal updated density (MUD) point where the updated density defines the measure-theoretic solution to the PIP. Another significant contribution of this work is the full theory of existence and uniqueness of MUD points for linear maps with Gaussian distributions. Data-constructed Quantity of Interest (QoI) maps are also presented and analyzed for solving the PIP within this measure-theoretic framework as a means of reducing uncertainties in the MUD estimate. We conclude with a demonstration of the general applicability of the method on two problems involving either spatial or temporal data for estimating uncertain model parameters. The first problem utilizes spatial data from a stationary partial differential equation to produce a MUD estimate of an uncertain boundary condition. The second problem utilizes temporal data obtained from the state-of-the-art ADvanced CIRCulation (ADCIRC) model to obtain a MUD estimate of uncertain wind drag coefficients for a simulated extreme weather event near the Shinnecock Inlet located in the Outer Barrier of Long Island, NY, USA.

42 ENGINEERING↗

Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology

A key decision for nuclear facilities is evaluating the need for an update of an existing seismic hazard analysis in light of new data and information that has become available since the time that the analysis was completed. We introduce the newly developed risk-informed Seismic Hazard Periodic Review Methodology (referred to as the SHPRM) and present how a Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 probabilistic seismic hazard analysis (PSHA) was performed in an implementation of this new methodology. The SHPRM offers a defensible and documented approach that considers both the changes in seismic hazard and engineering-based risk information of an existing nuclear facility to assess the need for an update of an existing PSHA. The SHPRM has seven evaluation criteria that are employed at specific analysis, decision, and comparison points which are applied to seismic design categories established for nuclear facilities in United States. The SHPRM is implemented using a SSHAC Level 1 study performed for the Idaho National Laboratory, USA. The implementation focuses on the first six of the seven evaluation criteria of the SHPRM which are all provided from the SSHAC Level 1 PSHA. Finally, to illustrate outcomes of the SHPRM that do not lead to the need for an update and those that do, the example implementations of the SHPRM are performed for nuclear facilities that have target performance goals expressed as the mean annual frequency of unacceptable performance at 1x10 -4 , 4x10 -5 and 1x10 -5 .

58 GEOSCIENCES↗

Update 1.1 to “pysimm: A python package for simulation of molecular systems”, (PII: S2352711016300395)

This update of the pysimm application programming interface, pysimm 1.1, provides both infrastructural as well as functional updates. Moreover, improvements to the random walk application that allow it to construct polymers with controlled tacticity are highlighted. Additions to the forcefield module include an update to enable working with the family of CHARMM forcefields and automated typing with the CHARMM generalized forcefield (CGenFF). Finally, new detailed examples demonstrating new features are also provided.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Diagnostic and Prognostic Biomarkers in ovarian cancer and the potential roles of cancer stem cells – An updated review

Highlights: • Current updated potential prognostic and diagnostic biomarkers in ovarian cancer. • Potential importance of cancer stem cells in tumorigenesis and metastasis. • Signature biomarkers improve the prediction of survival in cancer patients. Ovarian carcinomas relate to highest death rate in gynecologic malignancies as absence of symptoms shield the disease in the early stage. Current evidences have been devoted to discovering early effective screening mechanism prior to the onset of clinical symptoms. Therefore, biomarkers are the crucial tools that are capable of predicting progression, risk stratification and overall therapeutic benefit to fight against this deadly disease. Although recent studies have revealed serum protein markers, CA-125, HE4, mesothelin etc. have higher sensitivity and specificity at the early stages of the cancer; the critical questions arise regarding the applicability and reproducibility of genomic profiling across different patient groups. Hence, our hypothesis is that the panels of signature biomarkers will be much more effective to improve the diagnosis and prediction of patient survival outcome with high sensitivity and specificity. Ovarian cancer is heterogeneous in nature and contain a sub-population of stem cell-like characteristics that has the ability to grow as anchorage-independent manner and subsequently is able to metastasize. Highly tumorigenic and chemotherapy-resistant cancer stem cells (CSCs)-specific biomarkers therefore reflects the interesting possibilities to be targeted to minimize the high frequency of relapse and resistance to drugs. Several putative ovarian CSC markers such as CD24, CD44, CD133, SSEA have already been proposed in recent studies, yet, a large panel of updated biomarkers have high clinical relevance to define the prospective isolation of viable circulating CSCs. Therefore, this review highlights current evidence based updated ovarian cancer specific prognostic and diagnostic biomarkers and potential importance of CSCs in context of tumorigenicity and metastatic activity for fundamental biological and clinical implications.

60 APPLIED LIFE SCIENCES↗

Delayed Slater determinant update algorithms for high efficiency quantum Monte Carlo

Within ab initio Quantum Monte Carlo simulations, the leading numerical cost for large systems is the computation of the values of the Slater determinants in the trial wavefunction. Each Monte Carlo step requires finding the determinant of a dense matrix. This is most commonly iteratively evaluated using a rank-1 Sherman-Morrison updating scheme to avoid repeated explicit calculation of the inverse. The overall computational cost is therefore formally cubic in the number of electrons or matrix size. To improve the numerical efficiency of this procedure, we propose a novel multiple rank delayed update scheme. This strategy enables probability evaluation with application of accepted moves to the matrices delayed until after a predetermined number of moves, K . The accepted events are then applied to the matrices en bloc with enhanced arithmetic intensity and computational efficiency via matrix-matrix operations instead of matrix-vector operations. Here this procedure does not change the underlying Monte Carlo sampling or its statistical efficiency. For calculations on large systems and algorithms such as diffusion Monte Carlo where the acceptance ratio is high, order of magnitude improvements in the update time can be obtained on both multi- core CPUs and GPUs.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Sandia NCS Benchmark Suite Updates

The Sandia Nuclear Criticality Safety (NCS) program’s benchmark suite was recently updated. This suite is used to ensure that NCS calculations using computer-based neutron transportation codes have an established baseline comparison of calculated versus known experimental results. The Evaluated Nuclear Data File (ENDF) version used for the MCNP models in the suite was changed from ENDF/B-VII.1 to ENDF/B-VIII.0. Additionally, relevant thermal scattering law data libraries (TSLs) were updated. The sensitivity of the calculational bias of each benchmark model to these changes is discussed. Implementation of the ENDF/B-VIII.0 library and updated TSLs results in improvements to bias distribution in the intermediate enriched uranium, plutonium, and mixed uranium–plutonium (IEU, PU, and MIX) fissionable material benchmark categories, but a small bias increase in low- and high-enriched uranium categories (LEU and HEU, respectively). The results also highlight the sensitivity of the benchmarks, with average lethargy of neutrons causing fission energies (EALF) in the intermediate energy range to ENDF/B library changes. The most numerous bias changes were observed in the thermal energy region when transitioning from ENDF/B-VII.1 to ENDF/B-VIII.0. In conclusion, most of the unique bias changes observed in MCNP 6.3.0 between the two nuclear data libraries were in the LEU-COMP-THERM evaluation subset.

ICSBEP↗

THE CALIFORNIA PLANET SURVEY IV: A PLANET ORBITING THE GIANT STAR HD 145934 AND UPDATES TO SEVEN SYSTEMS WITH LONG-PERIOD PLANETS

We present an update to seven stars with long-period planets or planetary candidates using new and archival radial velocities from Keck-HIRES and literature velocities from other telescopes. Our updated analysis better constrains orbital parameters for these planets, four of which are known multi-planet systems. HD 24040 b and HD 183263 c are super-Jupiters with circular orbits and periods longer than 8 yr. We present a previously unseen linear trend in the residuals of HD 66428 indicative of an additional planetary companion. We confirm that GJ 849 is a multi-planet system and find a good orbital solution for the c component: it is a 1 M {sub Jup} planet in a 15 yr orbit (the longest known for a planet orbiting an M dwarf). We update the HD 74156 double-planet system. We also announce the detection of HD 145934 b, a 2 M {sub Jup} planet in a 7.5 yr orbit around a giant star. Two of our stars, HD 187123 and HD 217107, at present host the only known examples of systems comprising a hot Jupiter and a planet with a well constrained period greater than 5 yr, and with no evidence of giant planets in between. Our enlargement and improvement of long-period planet parameters will aid future analysis of origins, diversity, and evolution of planetary systems.

79 ASTRONOMY AND ASTROPHYSICS↗

Basis for the ICRP’s updated biokinetic model for systemic astatine

The International Commission on Radiological Protection (ICRP) recently updated its biokinetic models for workers in a series of reports called the OIR (occupational intakes of radionuclides) series. A new biokinetic model for astatine (At), the heaviest member of the halogen family, was adopted in OIR Part 5 (ICRP in press). Occupational intakes of radionuclides: Part 5). Furthermore, this paper provides an overview of available biokinetic data for At; describes the basis for the ICRP's updated model for At; and tabulates dose coefficients for intravenous injection of each of the two longest lived and most important At isotopes, 211 At and 210 At. At-211 (T 1/2 = 7.214 h) is a promising radionuclide for use in targeted α-particle therapy due to several favourable properties including its half-life and the absence of progeny that could deliver significant radiation doses outside the region of α-particle therapy. At-210 (T 1/2 = 8.1 h) is an impurity generated in the production of 211 At in a cyclotron and represents a potential radiation hazard via its long-lived progeny 210 Po (T 1/2 = 138 days). Tissue dose coefficients for injected 210 At and 211 At based on the updated model are shown to differ considerably from values based on the ICRP's previous model for At, particularly for the thyroid, stomach wall, salivary glands, lungs, spleen, and kidneys.

61 RADIATION PROTECTION AND DOSIMETRY↗

Constraints on a φCDM model from strong gravitational lensing and updated Hubble parameter measurements

We constrain the scalar field dark energy model with an inverse power-law potential, i.e., V(φ) ∝ φ{sup −α} (α > 0), from a set of recent cosmological observations by compiling an updated sample of Hubble parameter measurements including 30 independent data points. Our results show that the constraining power of the updated sample of H(z) data with the HST prior on H{sub 0} is stronger than those of the SCP Union2 and Union2.1 compilations. A recent sample of strong gravitational lensing systems is also adopted to confine the model even though the results are not significant. A joint analysis of the strong gravitational lensing data with the more restrictive updated Hubble parameter measurements and the Type Ia supernovae data from SCP Union2 indicates that the recent observations still can not distinguish whether dark energy is a time-independent cosmological constant or a time-varying dynamical component.

79 ASTRONOMY AND ASTROPHYSICS↗

Update on decaying and annihilating heavy dark matter with the 6-year IceCube HESE data

In view of the IceCube's 6-year high-energy starting events (HESE) sample, we revisit the possibility that the updated data may be better explained by a combination of neutrino fluxes from dark matter decay and an isotropic astrophysical power-law than purely by the latter. We find that the combined two-component flux qualitatively improves the fit to the observed data over a purely astrophysical one, and discuss how these updated fits compare against a similar analysis done with the 4-year HESE data. We also update fits involving dark matter decay via multiple channels, without any contribution from the astrophysical flux. We find that a DM-only explanation is not excluded by neutrino data alone. Finally, we also consider the possibility of a signal from dark matter annihilations and perform analogous analyses to the case of decays, commenting on its implications.

79 ASTRONOMY AND ASTROPHYSICS↗