At least 145 records · Page 8

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Representing Flexible, Energy-Constrained Technologies in Utility Planning Tools

Capacity expansion models are widely used by power system researchers, planners, and policy analysts to evaluate alternative power system investment scenarios. With the increasing deployment of wind and solar in the US, there has been much focus on improving the representations of variable generation (VG) technologies within capacity expansion models. Models that capture the variable net-load profiles and larger reserve requirements associated with high penetration VG systems represent an improvement to classic capacity expansion models, but fall short of capturing the complexities associated with storage technologies, such as battery energy storage (BES) and concentrating solar power with thermal energy storage (CSP with TES). While difficult to model in a capacity expansion setting, these technologies are potentially competitive sources of flexibility with the intriguing characteristics of being able to absorb VG that would otherwise be curtailed and directly contribute to renewable energy goals, respectively. In this paper we present methods for accurately representing these technologies in a large-scale capacity expansion model with high electrical and geospatial resolution. VG modeling techniques, including novel methods for capturing curtailment due to unit commitment and other hourly dispatch phenomena, are also reviewed. Modeling for a region in the southwestern United States demonstrates the economic relevance of being able to explicitly trade off the costs and capabilities of energy-constrained technologies, especially BES, against other resources in the near-term, in time to make plans for the coming decade

24 POWER TRANSMISSION AND DISTRIBUTION↗

Market-Based Indian Grid Integration Study Options: Preprint

The Indian state of Gujarat is forecasting solar and wind generation expansion from 16% to 32% of installed generation capacity by 2015. Some states in India are already experiencing heavy wind power curtailment. Understanding how to integrate variable generation (VG) into the grid is of great interest to local transmission companies and India's Ministry of New and Renewable Energy. This paperdescribes the nature of a market-based integration study and how this approach, while new to Indian grid operation and planning, is necessary to understand how to operate and expand the grid to best accommodate the expansion of VG. Second, it discusses options in defining a study's scope, such as data granularity, generation modeling, and geographic scope. The paper also explores how Gujarat'smethod of grid operation and current system reliability will affect how an integration study can be performed.

14 SOLAR ENERGY↗

Wholesale Electricity Market Design with Increasing Levels of Renewable Generation: Incentivizing Flexibility in System Operations

This paper discusses the importance and challenges of incentivizing flexibility during short-term operations of the bulk power system due to the increasing variability and uncertainty from growing penetrations of variable generation (VG). Operational flexibility can refer to many aspects of a resource's capability to support the power system, such as the speed, range, and duration of power output, as well as the ability to autonomously respond to frequency or voltage changes. Inefficient utilization of existing flexibility, or unwillingness of resources to provide flexibility, can compromise system reliability by not meeting the changing net load, and it can also lead to higher costs when an inefficient use of flexibility resources occurs. There are many existing characteristics of market design that incentivize flexibility in some manner. How they incentivize the provision of flexibility as well as the level of flexibility is still debated. We explore some of these existing market designs, as well as new market mechanisms, such as pay-for-performance regulating reserve and flexible ramping products, that aim to explicitly incentivize the provision of more flexibility to the system, particularly as a result of increasing VG penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

Overview of Wholesale Electricity Markets

This chapter provides a comprehensive review of four key electricity markets: energy markets (day-ahead and real-time markets); ancillary service markets; financial transmission rights markets; capacity markets. It also discusses how the outcomes of each of these markets may be impacted by the introduction of high penetrations of variable generation. Furthermore, the chapter examines considerations needed to ensure that wholesale market designs are inclusive of emerging technologies, such as demand response, distributed generation, and distributed storage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Parameterizing the Variability and Uncertainty of Wind and Solar in CEMs

We present current and improved methods for estimating the capacity value and curtailment impacts from variable generation (VG) in capacity expansion models (CEMs). The ideal calculation of these variability metrics is through an explicit co-optimized investment-dispatch model using multiple years of VG and load data. Because of data and computational limitations, existing CEMs typically approximate these metrics using a subset of all hours from a single year and/or using statistical methods, which often do not capture the tail-event impacts or the broader set of interactions between VG, storage, and conventional generators. In our proposed new methods, we use hourly generation and load values across all hours of the year to characterize the (1) contribution of VG to system capacity during high load hours, (2) the curtailment level of VG, and (3) the reduction in VG curtailment due to storage and shutdown of select thermal generators. Using CEM model outputs from a preceding model solve period, we apply these methods to exogenously calculate capacity value and curtailment metrics for the subsequent model solve period. Preliminary results suggest that these hourly methods offer improved capacity value and curtailment representations of VG in the CEM from existing approximation methods without additional computational burdens.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incentivizing Flexibility in System Operations

Defining flexibility has been a challenge that a number of industry members and researchers have attempted to address in recent years. With increased variability and uncertainty of variable generation (VG), the resources on the system will have to be more flexible to adjust output, so that power output ranges, power ramp rates, and energy duration sustainability are sufficient to meet the needs of balancing supply with demand at various operational timescales. This chapter discusses whether existing market designs provide adequate incentives for resources to offer their flexibility into the market to meet the increased levels of variability and uncertainty introduced by VG in the short-term operational time frame. It presents a definition of flexibility and discusses how increased levels of VG require increased needs for flexibility on power systems. Following this introductory material, the chapter examines how existing market designs ensure that resources have the right incentives to provide increased flexibility, and then discusses a number of emerging market design elements that impact flexibility incentives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effective Grid Utilization: A Technical Assessment and Application Guide, April 2011 - September 2012

In order to more fully integrate renewable resources, such as wind and solar, into the transmission system, additional capacity must be realized in the short term using the installed transmission capacity that exists today. The U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory Transmission and Grid Integration Group supported this study to assemble the history ofregulations and status of transmission technology to expand existing grid capacity. This report compiles data on various transmission technology methods and upgrades for increased capacity utilization of the existing transmission system and transmission corridors. The report discusses the technical merit of each method and explains how the method could be applied within the current regulatorystructure to increase existing transmission conductor and/or corridor capacity. The history and current state of alternatives to new construction is presented for regulators, legislators, and other policy makers wrestling with issues surrounding integration of variable generation. Current regulations are assessed for opportunities to change them to promote grid expansion. To supportconsideration of these alternatives for expanding grid capacity, the report lists relevant rules, standards, and policy changes.

14 SOLAR ENERGY↗

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Term Resource Adequacy, Long-Term Flexibility Requirements, and Revenue Sufficiency

Variable generation (VG) can reduce market prices over time and also the energy that other suppliers can sell in the market. The suppliers that are needed to provide capacity and flexibility to meet the long-term reliability requirements may, therefore, earn less revenue. This chapter discusses the topics of resource adequacy and revenue sufficiency - that is, determining and acquiring the quantity of capacity that will be needed at some future date and ensuring that those suppliers that offer the capacity receive sufficient revenue to recover their costs. The focus is on the investment time horizon and the installation of sufficient generation capability. First, the chapter discusses resource adequacy, including newer methods of determining adequacy metrics. The chapter then focuses on revenue sufficiency and how suppliers have sufficient opportunity to recover their total costs. The chapter closes with a description of the mechanisms traditionally adopted by electricity markets to mitigate the issues of resource adequacy and revenue sufficiency and discusses the most recent market design changes to address these issues.

24 POWER TRANSMISSION AND DISTRIBUTION↗