Search NASA⌕ Search

SEARCH · Search NASA

Results for “Vulnerability assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The Compound Risk of Heat and COVID-19 in New York City: Riskscapes, Physical and Social Factors, and Interventions

Climate change is disrupting the fundamental conditions of human life and exacerbating existing inequity by placing further burdens on communities that are already vulnerable. Risk exposure varies by where people live and work. In this article, we examine the spatial overlap of the compound risks of COVID-19 and extreme heat in New York City. We assess the relationship between socio-demographic and natural, built and social environmental characteristics, and the spatial correspondence of COVID-19 daily case rates across three pandemic waves. We use these data to create a compound risk index combining heat, COVID-19, density and social vulnerability. Our findings demonstrate that the compound risk of COVID-19 and heat are public health and equity challenges. Heat and COVID-19 exposure are influenced by natural, built, and social environmental factors, including access to mitigation infrastructure. Socio-demographic characteristics are significant indicators of COVID-19 and heat exposure and of where compound vulnerability exists. Using GIS mapping, we illustrate how COVID-19 risk geographies change across the three waves of the pandemic and the particular impact of vaccinations before the onset of the third wave. We, then, use our compound risk index to assess heat interventions undertaken by the City, identify neighborhoods of both adequate and inadequate coverage and provide recommendations for future interventions.

COVID-19↗

HEMODOSE: A Set of Multi-parameter Biodosimetry Tools

There continues to be important concerns of the possibility of the occurrence of acute radiation syndromes following nuclear and radiological terrorism or accidents that may result in mass casualties in densely populated areas. To guide medical personnel in their clinical decisions for effective medical management and treatment of the exposed individuals, biological markers are usually applied to examine radiation induced biological changes to assess the severity of radiation injury to sensitive organ systems. Among these the peripheral blood cell counts are widely used to assess the extent of radiation induced bone marrow (BM) injury. This is due to the fact that hematopoietic system is a vulnerable part of the human body to radiation damage. Particularly, the lymphocyte, granulocyte, and platelet cells are the most radiosensitive of the blood elements, and monitoring their changes after exposure is regarded as a practical and recommended laboratory test to estimate radiation dose and injury. In this work we describe the HEMODOSE web tools, which are built upon solid physiological and pathophysiological understanding of mammalian hematopoietic systems, and rigorous coarse-grained biomathematical modeling and validation. Using single or serial granulocyte, lymphocyte, leukocyte, or platelet counts after exposure, these tools can estimate absorbed doses of adult victims very rapidly and accurately to assess the severity of BM radiation injury. Some patient data from historical accidents are utilized as examples to demonstrate the capabilities of these tools as a rapid point-of-care diagnostic or centralized high-throughput assay system in a large-scale radiological disaster scenario. HEMODOSE web tools establish robust correlations between the absorbed doses and victim's various types of blood cell counts not only in the early time window (1 or 2 days), but also in very late phase (up to 4 weeks) after exposure.

Hu, Shaowen↗

Natural Hazard Risk Assessments at the Global Scale

Since 1990, natural hazards have led to over 1.6 million fatalities globally, and economic losses are estimated at an average of around USD 260–310 billion per year. The scientific and policy communities recognise the need to reduce these risks. As a result, the last decade has seen a rapid development of global models for assessing risk from natural hazards at the global scale. In this paper, we review the scientific literature on natural hazard risk assessments at the global scale, and we specifically examine whether and how they have examined future projections of hazard, exposure, and/or vulnerability. In doing so, we examine similarities and differences between the approaches taken across the different hazards, and we identify potential ways in which different hazard communities can learn from each other. For example, there are a number of global risk studies focusing on hydrological, climatological, and meteorological hazards that have included future projections and disaster risk reduction measures (in the case of floods), whereas fewer exist in the peer-reviewed literature for global studies related to geological hazards. On the other hand, studies of earthquake and tsunami risk are now using stochastic modelling approaches to allow for a fully probabilistic assessment of risk, which could benefit the modelling of risk from other hazards. Finally, we discuss opportunities for learning from methods and approaches being developed and applied to assess natural hazard risks at more continental or regional scales. Through this paper, we hope to encourage further dialogue on knowledge sharing between disciplines and communities working on different hazards and risk and at different spatial scales.

Philip J. Ward↗

Environmental Justice Needs Assessment for Disasters: Assessing the Landscape and Capacity of Organizations & Communities Working Towards Environmental Justice with Potential to Use NASA Earth Observations to Support Equitable Disaster Management and Risk Reduction

Natural disasters pose an increasing risk to communities worldwide. Marginalized populations, in particular, experience compounding vulnerabilities that contribute to unequal burdens of natural hazards as a result of systemic inequality stemming from historical disenfranchisement, disinvestment, and discriminatory policies such as racial redlining. This project connected with community organizations working at the intersection of environmental justice (EJ) and natural disaster management throughout the United States, to assess how NASA DEVELOP can leverage geospatial science to advance EJ efforts. Our team conducted a landscape analysis, which included a literature review, annotated bibliography, and identification of organizations working in EJ and disasters. We engaged EJ organizations in discussions to understand their current resources, challenges, and geospatial needs to inform how DEVELOP and NASA Applied Sciences can support their EJ and disaster work. Findings were compiled in a synthesis report and visualized in an ArcGIS StoryMap to showcase the work of EJ organizations, provide geospatial resources for them to explore, and provide examples of how remote sensing can be utilized in EJ and disasters work. The knowledge gained and end products created support the integration of EJ in future DEVELOP projects, and the expanded use of Earth observations by communities in support of a more just tomorrow.

Julianne Liu↗

Stress and Aeronautical Team Decision Making: Strengthening the Weak Links

A model that characterizes pilots'decision making in flight will be presented. Elements of the model that appear most vulnerable to stress will be examined in light of accidents and incidents. The model includes two major components: Situation assessment and choice of a course of action. While based on Klein's Recognition-Primed Decision Making, it is tailored to the aviation environment which includes certain features that may be common to other domains: Primarily, aviation is highly proceduralized and options are generally well known. What appears to make decisions difficult are ambiguity, time pressure, and risk. In addition, decisions must often be made while carrying out the standard procedures of flight, including checklists, review of approach plates, standard briefings, and communication with air traffic controllers or cabin crew. The effects of stressors on decision making by pilots with varying levels of expertise will be explored, along with strategies for strengthening the weak links.

Orasanu, Judith↗

Time-on-task decrements in "steer clear" performance of patients with sleep apnea and narcolepsy

Loss of attention with time-on-task reflects the increasing instability of the waking state during performance in experimentally induced sleepiness. To determine whether patients with disorders of excessive sleepiness also displayed time-on-task decrements indicative of wake state instability, visual sustained attention performance on "Steer Clear," a computerized simple RT driving simulation task, was compared among 31 patients with untreated sleep apnea, 16 patients with narcolepsy, and 14 healthy control subjects. Vigilance decrement functions were generated by analyzing the number of collisions in each of six four-minute periods of Steer Clear task performance in a mixed-model analysis of variance and linear regression equations. As expected, patients had more Steer Clear collisions than control subjects (p=0.006). However, the inter-subject variability in errors among the narcoleptic patients was four-fold that of the apnea patients, and 100-fold that of the controls volunteers; the variance in errors among untreated apnea patients was 27-times that of controls. The results of transformed collision data revealed main effects for group (p=0.006), time-on-task (p=0.001), and a significant interaction (p=0.022). Control subjects showed no clear evidence of increasing collision errors with time-on-task (adjusted R2=0.22), while apnea patients showed a trend toward vigilance decrement (adjusted R2=0.42, p=0.097), and narcolepsy patients evidenced a robust linear vigilance decrement (adjusted R2=0.87, p=0.004). The association of disorders of excessive somnolence with escalating time-on-task decrements makes it imperative that when assessment of neurobehavioral performance is conducted in patients, it involves task durations and analyses that will evaluate the underlying vulnerability of potentially sleepy patients to decrements over time in tasks that require sustained attention and timely responses, both of which are key components in safe driving performance.

NASA Discipline Space Human Factors↗

An Overview of the NASA Aviation Safety Program (AVSP) Systemwide Accident Prevention (SWAP) Human Performance Modeling (HPM) Element

An overview is provided of the Human Performance Modeling (HPM) element within the NASA Aviation Safety Program (AvSP). Two separate model development tracks for performance modeling of real-world aviation environments are described: the first focuses on the advancement of cognitive modeling tools for system design, while the second centers on a prescriptive engineering model of activity tracking for error detection and analysis. A progressive implementation strategy for both tracks is discussed in which increasingly more complex, safety-relevant applications are undertaken to extend the state-of-the-art, as well as to reveal potential human-system vulnerabilities in the aviation domain. Of particular interest is the ability to predict the precursors to error and to assess potential mitigation strategies associated with the operational use of future flight deck technologies.

Foyle, David C.↗

HEMODOSE: A Set of Multi-parameter Biodosimetry Tools

After the events of September 11, 2001 and recent events at the Fukushima reactors in Japan, there is an increasing concern of the occurrence of nuclear and radiological terrorism or accidents that may result in large casualty in densely populated areas. To guide medical personnel in their clinical decisions for effective medical management and treatment of the exposed individuals, biological markers are usually applied to examine the radiation induced changes at different biological levels. Among these the peripheral blood cell counts are widely used to assess the extent of radiation induced injury. This is due to the fact that hematopoietic system is the most vulnerable part of the human body to radiation damage. Particularly, the lymphocyte, granulocyte, and platelet cells are the most radiosensitive of the blood elements, and monitoring their changes after exposure is regarded as the most practical and best laboratory test to estimate radiation dose. The HEMODOSE web tools are built upon solid physiological and pathophysiological understanding of mammalian hematopoietic systems, and rigorous coarse-grained biomathematical modeling and validation. Using single or serial granulocyte, lymphocyte, leukocyte, or platelet counts after exposure, these tools can estimate absorbed doses of adult victims very rapidly and accurately. Some patient data in historical accidents are utilized as examples to demonstrate the capabilities of these tools as a rapid point-of-care diagnostic or centralized high-throughput assay system in a large scale radiological disaster scenario. Unlike previous dose prediction algorithms, the HEMODOSE web tools establish robust correlations between the absorbed doses and victim's various types of blood cell counts not only in the early time window (1 or 2 days), but also in very late phase (up to 4 weeks) after exposure

Hu, Shaowen↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

IT Security Support for Spaceport Command and Control System

During the fall 2013 semester, I worked at the Kennedy Space Center as an IT Security Intern in support of the Spaceport Command and Control System under the guidance of the IT Security Lead Engineer. Some of my responsibilities included assisting with security plan documentation collection, system hardware and software inventory, and malicious code and malware scanning. Throughout the semester, I had the opportunity to work on a wide range of security related projects. However, there are three projects in particular that stand out. The first project I completed was updating a large interactive spreadsheet that details the SANS Institutes Top 20 Critical Security Controls. My task was to add in all of the new commercial of the shelf (COTS) software listed on the SANS website that can be used to meet their Top 20 controls. In total, there are 153 unique security tools listed by SANS that meet one or more of their 20 controls. My second project was the creation of a database that will allow my mentor to keep track of the work done by the contractors that report to him in a more efficient manner by recording events as they occur throughout the quarter. Lastly, I expanded upon a security assessment of the Linux machines being used on center that I began last semester. To do this, I used a vulnerability and configuration tool that scans hosts remotely through the network and presents the user with an abundance of information detailing each machines configuration. The experience I gained from working on each of these projects has been invaluable, and I look forward to returning in the spring semester to continue working with the IT Security team.

computer security↗

Mitigating Microbial Contamination Risks in CO 2 Removal Systems for Long-Duration Space Missions

Crewed missions to Mars and beyond pose new challenges for the crew and the technological solutions they depend upon. Crucial considerations in designing the next generation of Environmental Control and Life Support Systems (ECLSS) include enhanced reliability and autonomy, given the challenges of resupply and resource recovery in remote missions. One significant challenge faced in various sectors of the International Space Station and ECLSS is the phenomena of microbial growth, particularly biofilm formation. As such, microbial growth is a critical consideration in the design phase of new ECLSS systems. Two novel CO2 removal systems—Liquid-Amines CO2 Removal (LACR) and Cold-Surface CO2 Deposition (CDep)—are currently under development at the NASA Ames Research Center to meet the needs of extended space travel. In this presentation, the authors aim to make a risk assessment of microbial growth in LACR and CDep through: 1) a comprehensive literature review to identify LACR and CDep components most vulnerable to microbial contamination and 2) wet lab testing commencing with a subscale test of the most susceptible component of CDep. The literature review revealed that the hollow-fiber Liqui-Cel membrane employed in CDep exhibits the highest susceptibility to microbial growth. Our wet lab tests corroborated these findings, as airborne microbes introduced into the membrane led to considerable biomass accumulation. These results indicate a significant risk of microbial invasion into the membranes. To prevent microbial growth in CDep or other CO2 removal systems, proper ECLSS arrangement is essential—a CO2 removal system should remain behind the charcoal-HEPA filters, condensing heat exchanger, and Trace Contaminant Control System. In summary, anticipating potential microbial interactions within ECLSS for remote crewed missions is vital to mission success. It should, therefore, be included as one of the many factors when designing future ECLSS systems to perform reliably and consistently to support astronaut life.

A. Nicolas Whitlock↗

Severe droughts reduce river navigability and isolate communities in the Brazilian Amazon

The Amazon basin is experiencing severe droughts that are expected to worsen with climate change. Riverine communities are especially vulnerable to these extreme events. This study investigates the experiences of Brazilian Amazonian communities during droughts occurring from 2000-2020. We assess the distribution of settlements at risk of prolonged isolation during extreme low-water periods, along with impacts reported in digital news outlets. Using historic time series of river levels from 90 gauges, we look at how long droughts lasted in regions with reported impacts. Results indicate that the droughts in 2005, 2010, and 2016 were the most severe, with over an additional month of low water levels in those years. Such drought events routinely disrupt inland water transport and isolate local populations, limiting access to essential goods (food, fuel, medicine) and basic services (healthcare, education). Given this new reality, Amazon countries must develop long-term strategies for mitigation, adaptation, and disaster response.

Geography↗

San José Urban Development: Quantifying Canopy Cover and Land Surface Temperature in San José to Identify Future Tree Planting Sites

The urban heat island effect refers to the phenomenon of substantially increased temperatures in urban areas compared to their surrounding suburban or rural counterparts. The City of San José’s Department of Parks, Recreation and Neighborhood Services (PRNS) and Department of Transportation (DOT) work to mitigate the UHI effect through urban forestry initiatives. The PRNS and DOT partnered with NASA DEVELOP to identify areas in need of tree plantings. We examined land surface temperature (LST) throughout the city using data from the Thermal Infrared Sensor (TIRS) and TIRS-2 on NASA’s Landsat 8 and 9 satellites from 2013 to 2024. We also assessed canopy cover in parks using LiDAR data collected in 2020 for the United States Geological Survey’s 3D Elevation Program, and measured vegetation greenness using the Normalized Difference Vegetation Index (NDVI) with PlanetScope imagery from 2018 to 2024. We evaluated social and environmental factors that influence the distribution of heat event impacts by creating a heat vulnerability index. We found that heat is concentrated in urban areas and that poor vegetation health is associated with high LST. We also found that socially vulnerable communities are disproportionately located in areas of high environmental risk. These analyses allow the partners to prioritize tree plantings in parks near areas of high social and environmental risk. We determined that Earth observations can be used to inform urban forestry decision making, but because methodologies for using LiDAR to assess canopy cover vary greatly, it is difficult to make comparisons across different canopy cover assessments.

land surface temperature↗

Understanding and responding to earthquake hazards

Advances in understanding of the earthquake cycle and in assessing earthquake hazards is a topic of great importance. Dynamic earthquake hazard assessments resolved for a range of spatial scales and time scales will allow a more systematic approach to prioritizing the retrofitting of vulnerable structures, relocating populations at risk, protecting lifelines, preparing for disasters, and educating the public.

earth science vision distributed spacecraft virtua↗

A Multiple Parameters Biodosimetry Tool with Various Blood Cell Counts - the Hemodose Approach

There continue to be important concerns about the possibility of the occurrence of acute radiation syndromes following nuclear and radiological terrorism or accidents that may result in mass casualties in densely populated areas. To guide medical personnel in their clinical decisions for effective medical management and treatment of the exposed individuals, biological markers are usually applied to examine radiation induced biological changes to assess the severity of radiation injury to sensitive organ systems. Among these the peripheral blood cell counts are widely used to assess the extent of radiation induced bone marrow injury. This is due to the fact that the hematopoietic system is the most vulnerable part of the human body to radiation damage. Particularly, the lymphocyte, granulocyte, and platelet cells are the most radiosensitive of the blood elements, and monitoring their changes after exposure is regarded as a practical and recommended laboratory test to estimate radiation dose and injury. Based upon years of physiological and pathophysiological investigation of mammalian hematopoietic systems, and rigorous coarse-grained bio-mathematical modeling and validation on species from mouse, to dog, monkey, and human, we have developed a set of software tools Hemodose, which can use single or serial granulocyte, lymphocyte, leukocyte, or platelet counts after exposure to estimate absorbed doses of adult victims very rapidly and accurately. Some patient data from historical accidents are utilized as examples to demonstrate the capabilities of these tools as a rapid point-of-care diagnostic or centralized high-throughput assay system in a large-scale radiological disaster scenario. Most significant to the improvement of national and local preparedness of a potential nuclear/radiological disaster, this HemoDose approach establishes robust correlations between the absorbed doses and victim's various types of blood cell counts not only in the early time window (1 or 2 days), but also in the very late phase (up to 4 weeks) after exposure.

Hu, Shaowen↗

NASA Manned Launch Vehicle Lightning Protection Development

Historically, the National Aeronautics and Space Administration (NASA) relied heavily on lightning avoidance to protect launch vehicles and crew from lightning effects. As NASA transitions from the Space Shuttle to the new Constellation family of launch vehicles and spacecraft, NASA engineers are imposing design and construction standards on the spacecraft and launch vehicles to withstand both the direct and indirect effects of lightning. A review of current Space Shuttle lightning constraints and protection methodology will be presented, as well as a historical review of Space Shuttle lightning requirements and design. The Space Shuttle lightning requirements document, NSTS 07636, Lightning Protection, Test and Analysis Requirements, (originally published as document number JSC 07636, Lightning Protection Criteria Document) was developed in response to the Apollo 12 lightning event and other experiences with NASA and the Department of Defense launch vehicles. This document defined the lightning environment, vehicle protection requirements, and design guidelines for meeting the requirements. The criteria developed in JSC 07636 were a precursor to the Society of Automotive Engineers (SAE) lightning standards. These SAE standards, along with Radio Technical Commission for Aeronautics (RTCA) DO-160, Environmental Conditions and Test Procedures for Airborne Equipment, are the basis for the current Constellation lightning design requirements. The development and derivation of these requirements will be presented. As budget and schedule constraints hampered lightning protection design and verification efforts, the Space Shuttle elements waived the design requirements and relied on lightning avoidance in the form of launch commit criteria (LCC) constraints and a catenary wire system for lightning protection at the launch pads. A better understanding of the lightning environment has highlighted the vulnerability of the protection schemes and associated risk to the vehicle, which has resulted in lost launch opportunities and increased expenditures in manpower to assess Space Shuttle vehicle health and safety after lightning events at the launch pad. Because of high-percentage launch availability and long-term on-pad requirements, LCC constraints are no longer considered feasible. The Constellation vehicles must be designed to withstand direct and indirect effects of lightning. A review of the vehicle design and potential concerns will be presented as well as the new catenary lightning protection system for the launch pad. This system is required to protect the Constellation vehicles during launch processing when vehicle lightning effects protection might be compromised by such items as umbilical connections and open access hatches.

McCollum, Matthew B.↗