Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Qualification of the Nippon Instrumentation for use in Measuring Mercury at the Defense Waste Processing Facility

The Nippon Mercury/RA-3000 system installed in 221-S M-14 has been qualified for use. The qualification was a side-by-side comparison of the Nippon Mercury/RA-3000 system with the currently used Bacharach Mercury Analyzer. The side-by-side testing included standards for instrument calibration verifications, spiked samples and unspiked samples. The standards were traceable back to the National Institute of Standards and Technology (NIST). The side-by-side work included the analysis of Sludge Receipt and Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples. With the qualification of the Nippon Mercury/RA-3000 system in M-14, the DWPF lab will be able to perform a head to head comparison of a second Nippon Mercury/RA-3000 system once the system is installed. The Defense Waste Processing Facility (DWPF) analyzes receipt and product samples from the Sludge Receipt and Adjustment Tank (SRAT) to determine the mercury (Hg) concentration in the sludge slurry. The SRAT receipt is typically sampled and analyzed for the first ten SRAT batches of a new sludge batch to obtain an average Hg concentration. This average Hg concentration is then used to determine the amount of steam stripping required during the concentration/reflux step of the SRAT cycle to achieve a less than 0.6 wt% Hg in the SRAT product solids. After processing is complete, the SRAT product is sampled and analyzed for mercury to ensure that the mercury concentration does not exceed the 0.45 wt% limit in the Slurry Mix Evaporator (SME). The DWPF Laboratory utilizes Bacharach Analyzers to support these Hg analyses at this facility. These analyzers are more than 10 years old, and they are no longer supported by the manufacturer. Due to these difficulties, the Bacharach Analyzers are to be replaced by new Nippon Mercury/RA-3000 systems. DWPF issued a Technical Task Request (TTR) for the Savannah River National Laboratory (SRNL) to assist in the qualification of the new systems. SRNL prepared a task technical and quality assurance (TT&QA) plan that outlined the activities that are necessary and sufficient to meet the objectives of the TTR. In addition, TT&QA plan also included a test plan that provided guidance to the DWPF Lab in collecting the data needed to qualify the new Nippon Mercury/RA-3000 systems.

47 OTHER INSTRUMENTATION↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (i.e., a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (i.e., a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (i.e., a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam. Thirty potential antifoams were tested as part of this study. A series of tests were developed to help screen out ineffective alternatives including: 1. Spreading testing of superspreaders, 2. Foam column testing with physical simulants, 3. Boiling testing with physical and chemical simulants, 4. Days-only Sludge Receipt and Adjustment Tank (SRAT) process simulations with sludge (containing noble metals and mercury), Precipitate Reactor Feed Tank (PRFT), and Slurry Mix Evaporator Feed Tank (SEFT) simulants in the RC1 Reaction Calorimeter (purchased for antifoam testing), and 5. Around-the-clock SRAT and Slurry Mix Evaporator (SME) process simulations with sludge(containing noble metals and mercury), PRFT, and SEFT simulants in the RC1 Reaction Calorimeter. Evonik Surfynol® MD20, a commercially available defoamer, was relatively effective in controlling foam, while remaining chemically stable in SRAT and SME processing across the pH range of 4 to 13. No degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. In nitric-glycolic acid flowsheet testing, 250 mg/kg Evonik Surfynol® MD20 was needed for foam control compared to 1,625 mg/kg for Antifoam 747, DWPF’s current antifoam. In nitric-formic acid flowsheet testing, 1,125 mg/kg of Evonik Surfynol® MD20 was needed to control foam throughout the SRAT and SME cycles. The commercially available superspreader Momentive™ Y-17112 was even more effective than Evonik Surfynol® MD20 as both a defoamer and an antifoam. Not only was the foam destroyed upon addition but also was less persistent between additions. It was the most effective antifoam in testing using both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. In nitric-glycolic acid flowsheet testing, only 100 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. In nitric-formic acid flowsheet testing, 300 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. Momentive™ Y-17112 is also resistant to hydrolysis as demonstrated by its chemical stability in SRAT and SME processing across the pH range of 4 to 13 and lack of degradation products in offgas or condensate. Both candidates were effective as potential replacements for Antifoam 747, with Y-17112 demonstrating superior foam control. During nitric-glycolic flowsheet testing 50% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. During nitric-formic flowsheet testing 75% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. Foam remediated with Momentive™ Y-17112 was less persistent throughout testing. In addition, no degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. Based on this testing, Momentive™ Y-17112 is clearly superior to Evonik Surfynol® MD20 and Antifoam 747, especially for the nitric-formic acid flowsheet processing; it is recommended that Momentive™ Y-17112 replace Antifoam 747 in DWPF. An antifoam addition strategy is recommended for both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. Implementation of Momentive™ Y-17112 is expected to decrease SRAT and SME boiling times by up to 50%, eliminate the issues resulting from Antifoam 747 degradation products, and minimize foamovers. To validate the effectiveness of these defoaming agents, SRNL recommends irradiation of a SRAT or SME product simulant containing fresh antifoam. The goal of this testing is to determine whether the irradiation causes decomposition of the antifoam that would make it less effective or produce new species in the offgas or slurry. This testing began in April 2020. An evaluation should be completed to determine the thermolytic hydrogen and methane generation rate in downstream equipment, including the High-Level Waste evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2024 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2024 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained.1 The April 2024 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2024 (1QFY2024) and the Second Quarter Fiscal Year 2024 (2QFY2024). The following facts pertaining to the WAC are drawn from the analytical results provided in this report. WAC TARGETS and LIMITS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC TARGETS and LIMITS. Nitrosamines were not detected in the SWPF DSS salt solution sample above the instrument detection limits of <1 mg/L. The minimum detection limit (<3.33E-01 pCi/mL) is reported for 94 Nb as determined from the minimum detectable activity associated with the radiochemical method used for this radionuclide. The reported detection limit is above the requested SRMC target minimum detection limit concentration. However, the minimum detection limit reported for the April 2024 semiannual SWPF DSS sample for 94 Nb is lower than the estimated detection limit of 4.38E-01 pCi/mL initially established by SRNL in 2009. Thus, per guidance from SRMC, 2 SRNL continues to achieve as low as practical detection limits for this radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, Scrub, and Strip Test Results for the Salt Waste Processing Facility Caustic Side Solvent Extraction Solvent Sample

An Extraction, Scrub, and Strip (ESS) test was performed on a sample of Salt Waste Processing Facility (SWPF) Caustic-Side Solvent Extraction (CSSX) solvent and salt simulant to determine cesium distribution ratios (D (Cs) ), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D (Cs) measured 13.2, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rheology Of MonoSodium Titanate (MST) And Modified Mst (mMST) Mixtures Relevant To The Salt Waste Processing Facility

The Savannah River National Laboratory performed measurements of the rheology of suspensions and settled layers of treated material applicable to the Savannah River Site Salt Waste Processing Facility. Suspended solids mixtures included monosodium titanate (MST) or modified MST (mMST) at various solid concentrations and soluble ion concentrations with and without the inclusion of kaolin clay or simulated sludge. Layers of settled solids were MST/sludge or mMST/sludge mixtures, either with or without sorbed strontium, over a range of initial solids concentrations, soluble ion concentrations, and settling times.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elemental characterization of crystalline silicotitanate following Hanford tank waste processing

To expedite vitrification of low activity waste at the Hanford Site, a Tank-Side Cesium Removal system is being evaluated. This method utilizes an inorganic ion exchange (IX) media, crystalline silicotitanate (CST), to remove 99.9% of the 137Cs from tank waste supernate. Laboratory scale testing of the ion exchange process has been conducted by Pacific Northwest National Laboratory to evaluate Cs removal with CST in supernates collected from Hanford tanks 241-AP-107 and 241-AW-102 under prototypic plant operating conditions. In an effort to understand the selectivity and partitioning of other analytes toward CST, specifically Resource Conservation and Recovery Act (RCRA) hazardous metals, selected +2 cations, and transuranic elements, a method for the complete dissolution of CST and Cs removal from the digestate was applied to the spent CST post-processing Hanford tank waste. The CST was shown to adsorb a relevant fraction of Ca, Cd, Pb, Sr, and potentially Fe by IX and/or other mechanisms. The spent CST also adsorbed actinides, including U, Pu, Np, and Am. This work discusses digestion of CST and removal of Cs from the digestate allowing effective analysis and provides insight as to what analytes may be competing for IX sites on the CST media.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

White Paper to Justify the Use of Strip Effluent in the Defense Waste Processing Facility During Slurry Mix Evaporator Processing

At the request of Savannah River Remediation (SRR), a white paper was written to assess whether it would be acceptable to process Strip Effluent (SE) in both the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in the Defense Waste Processing Facility (DWPF) for the nitric-glycolic acid flowsheet. Savannah River National Laboratory (SRNL) experimental data and DWPF Sludge Batch 9 (SB9) process data was reviewed, looking at batches which included Precipitate Reactor Feed Tank (PRFT) and/or Strip Effluent Feed Tank (SEFT) feeds that led to long processing times. These batches were reviewed looking for processing problems such as melter feed trips, foamovers, heating rod or steam coil fouling, missed Reduction/Oxidation (REDOX) targets, and other process anomalies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Second Set of Analyses of the Salt Waste Processing Facility (SWPF) Batch 2 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Batch 2 for processing. This document reports the second set of results of the analyses of the Tank 21H qualification sample. Analysis of the Tank 21H SWPF Batch 2 sample indicates that the material contains measured analytes in typical concentrations. This memo along with the previous results memo satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Initial Analyses of the Salt Waste Processing Facility (SWPF) Batch 2 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Batch 2 for processing. This document reports the initial expedited results of the analyses of the Tank 21H qualification sample. Analysis of the Tank 21H SWPF Batch 2 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual color. Further sample results will be reported in a future document. This memo satisfies part of Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

Foam, due to the high gas generation rates of boiling and chemical reaction offgasing, requires control measures to prevent the foam from contaminating the condensate and to facilitate efficient plant operation. Antifoam was utilized to minimize foam production during chemical processing in the DWPF and during High-Level Waste (HLW) evaporation at SRS and Hanford. However, the current antifoam used in the SRS DWPF increases flammability risk during chemical processing (generates three flammable degradation products) and while feeding the melter (can decompose to CO/hydrogen). It is also the likely source of methyl functional groups for the organo-mercury present in the tank farm and excessive mercury in Saltstone. Additionally, the planned startup of Salt Waste Processing Facility (SWPF), with much higher throughput, will challenge DWPF to process at higher gas generation rates. DWPF employs Antifoam 747, a superspreader produced by Momentive Performance Materials, as an antifoaming agent during waste processing. During DWPF chemical processing, antifoam must be effective up to boiling (i.e., up to 103°C) and between a pH of 3-13. Antifoam 747 is most effective at a pH range of 6-8 and degrades as pH deviates. In addition, SRNL identified three flammable antifoam degradation products using mass spectrometer (MS) and fourier transform infrared (FTIR) offgas analyzers during simulations. A new antifoam or a new method to control foam is needed to minimize DWPF processing time and reduce the risk of contamination. In addition, testing should be completed to ensure that other antifoams used in HLW processing do not have similar flammability hazards or cause unintended impacts in downstream processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, scrub, and strip test results for the solvent transfer to salt waste processing facility

The Savannah River National Laboratory (SRNL) prepared approximately 240 gallons of Caustic-Side Solvent Extraction (CSSX) solvent for use at the Salt Waste Processing Facility (SWPF). An Extraction, Scrub, and Strip (ESS) test was performed on a sample of the prepared solvent using a salt solution prepared by Parsons to determine cesium distribution ratios (D(Cs)), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams. This data will be used by Parsons to help qualify the solvent for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D(Cs) measured 15.5, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗