Pretreated Waste and Melter Feed Composition Variability Testing Using HLW Simulants

This report documents the results of the testing that was performed to fulfill the High Level Waste (HLW) pretreated waste and melter feed product qualification requirements for chemical composition and product loading as described in the Immobilized High Level Waste (IHLW) Wasteform Compliance Plan and the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Contract. Meeting the product quality specifications relies on controlling the melter feed preparation process and the resulting IHLW glass composition. In part, this control depends on the ability of the Melter Feed Preparation Vessel (MFPV) system to homogenize pretreated waste and the melter feed after addition of the glass forming chemicals (GFCs), provide representative sampling of the vessel contents, measure the level over the vessel operating range, and uniformly transfer the vessel contents. A series of tests were conducted on a single scaled down tank, 8 feet in diameter, which was used to represent the WTP HLW MFPV. Prototypic equipment (such as radar level detectors, transfer pumps, agitators, and density probes) was installed in geometrically similar positions to those of the WTP tanks. Other equipment, which is not fully prototypic, was also installed in the tank to fully represent the WTP tank equipment arrangement. In addition, a prototypic autosampler and a hydraulically similar transfer line were installed to represent the WTP tank sampling systems. Testing was performed using simulants that represent the high and low bounds of rheology for the pretreated HLW prior to GFC addition and the HLW melter feed after GFC addition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Filtration Scale-Up Performance

The scale-up performance of sintered stainless steel crossflow filter elements planned for use at the Pretreatment Engineering Platform (PEP) and at the Waste Treatment and Immobilization Plant (WTP) were characterized in partial fulfillment (see Table S.1) of the requirements of Test Plan TP RPP WTP 509. This test report details the results of experimental activities related only to filter scale-up characterization. These tests were performed under the Simulant Testing Program supporting Phase 1 of the demonstration of the pretreatment leaching processes at PEP. Pacific Northwest National Laboratory (PNNL) conducted the tests discussed herein for Bechtel National, Inc. (BNI) to address the data needs of Test Specification 24590-WTP-TSP-RT-07-004. Scale-up characterization tests employ high-level waste (HLW) simulants developed under the Test Plan TP-RPP-WTP-469. The experimental activities outlined in TP-RPP-WTP-509 examined specific processes from two broad areas of simulant behavior: 1) leaching performance of the boehmite simulant as a function of suspending phase chemistry and 2) filtration performance of the blended simulant with respect to filter scale-up and fouling. With regard to leaching behavior, the effect of anions on the kinetics of boehmite leaching was examined. Two experiments were conducted: 1) one examined the effect of the aluminate anion on the rate of boehmite dissolution and 2) another determined the effect of secondary anions typical of Hanford tank wastes on the rate of boehmite dissolution. Both experiments provide insight into how compositional variations in the suspending phase impact the effectiveness of the leaching processes. In addition, the aluminate anion studies provide information on the consequences of gibbsite in waste. The latter derives from the expected fast dissolution of gibbsite relative to boehmite. This test report concerns only results of the filtration performance with respect to scale-up. Test results for boehmite dissolution kinetics and filter fouling are reported elsewhere (see Table S.1). The primary goal of scale-up testing was to examine how filter length influenced permeate flux rates. To accomplish this, the existing cells unit filter system, which employs a 2-ft-long, 0.5-in. (inner) diameter sintered stainless steel filter element, was redesigned to accommodate an 8-ft. sintered stainless steel filter element of the same diameter. Testing was then performed to evaluate the filtration performance of waste simulant slurries. Scale-up testing consisted of two separate series of filtration tests: 1) scale-up axial velocity (AV)/transmembrane pressure (TMP) matrix tests and 2) scale-up temperature tests. The AV/TMP matrix tests examined filtration performance of two different waste simulant slurries in the 8-ft. cells unit filter system. Waste simulant slurry formulations for the 8-ft. scale-up test was selected to match simulant slurries for which filtration performance had been characterized on the 2-ft CUF. For the scale-up temperature tests, the filtration performance at three test temperatures (i.e., 25°C, 40°C, and 60°C) was determined to evaluate if filter flux versus temperature correlations developed using the 2-ft filters were also valid for the 8-ft filters.

36 MATERIALS SCIENCE↗

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities: pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste feed from the Hanford tank farms and separate it into 1) a high-volume, low-activity liquid stream stripped of most solids and radionuclides and 2) a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJMs) that will provide some or all of the mixing in the vessels. This technology was selected for use in so-called “black cell” regions of the WTP, where maintenance capability will not be available for the operating life of the WTP. PJM technology was selected for use in these regions because it has no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. This report contains the results of single and multiple PJM overblow tests conducted in a large, ~13 ft-diameter × 15-ft-tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. These single and multiple PJM overblow tests were conducted using water and a clay simulant to bound the lower and upper rheological properties of the waste streams anticipated to be processed in the WTP. Hydrodynamic pressures were measured at a number of locations in the test vessel using an array of nine pressure sensors and four hydrophones. These measurements were made under normal and limiting vessel operating conditions (i.e., maximum PJM fluid emptying velocity, maximum and minimum vessel contents for PJM operation, and maximum and minimum rheological properties). Test data collected from the PJM overblow tests were provided to Bechtel National, Inc. (BNI) for assessing hydrostatic, dynamic, and acoustic pressure loadings on in-tank structures during 1) single overblows; 2) multiple overlapping overblows of two to four PJMs; 3) simultaneous overblows of pairs of PJMs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Characterization of Boehmite Component Simulant

According to Bechtel National Inc.’s (BNI’s) Test Specification 24590-PTF-TSP-RT-06-006, Rev 0, “Simulant Development to Support the Development and Demonstration of Leaching and Ultrafiltration Pretreatment Processes,” simulants for boehmite, gibbsite, and filtration are to be developed that can be used in subsequent bench and integrated testing of the leaching/filtration processes. These simulants will then be used to demonstrate the leaching process and to help refine processing conditions that may impact safety basis considerations (Smith 2006). This report documents the results of the boehmite simulant development and blended simulant crossflow ultrafiltration leaching completed in accordance with the test plan TP-RPP-WTP-469 Rev 0 (WTP Doc. No. 24590- 101-TSA-W000-0004-182-00001 Rev 00A) prepared and approved in response to the cited test specification. This report also includes the results of the aluminate and anion effect on boehmite dissolution performed in accordance with the test plan TP-RPP-WTP-509, Rev 0 (WTP Doc. No. 24590-101-TSA-W000-0004-72-00019 Rev 00A) prepared and approved in response to the Test Specification 24590-WTP-TSP-RT-07-004, Rev 0 (Sundar 2007).

Russell, Renee L↗

PEP Support Laboratory Leaching and Permeate Stability Tests

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes," of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. A simplified flow diagram of the PEP system is shown in Figure 1.1. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-VSL-T01A and B, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP-VSL-T02A, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before adding caustic.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Integrated Test D Run Report Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes" of the External Flowsheet Review Team (EFRT) issue response plan. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario (Test B and D) has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario (Test A) has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP VSL-00001A and B in the WTP PTF). In Test D, 19M sodium hydroxide (NaOH, caustic) was added to the waste slurry in the UFP VSL T02 vessel after the solids were concentrated to ~20% undissolved solids. The NaOH was added to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by heating to 85°C using direct injection of steam to accelerate the leach process. The main difference of Test D compared to Test B is that the leach temperature is 85°C for 24 hrs as compared to 100°C for 12 hours. The other difference is the Test D simulant had Cr in the simulant from the start of processing and Test B had Cr added to adjust the simulant composition after aluminum leaching. Following the caustic leach, the UFP-VSL-T02A vessel contents are cooled using the vessel cooling jacket. The slurry was then concentrated to 17 wt% undissolved solids and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Simulant Shakedown/Functional Testing

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes." The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3-8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. In both scenarios, following the caustic leach, the slurry was then concentrated to 17 wt% and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consumer Preferences and Willingness to Pay for Potting Mix with Biochar

Biochar is a co-product of advanced biofuels production from feedstocks including food, agricultural, wood wastes, or dedicated energy crops. Markets for soil amendments using biochar are emerging, but little is known about consumer preferences and willingness to pay (WTP) for these products or the depth of the products’ market potential for this product. This research provides WTP estimates for potting mix amended with 25% biochar, conditioned on consumer demographics and attitudes about product information labeling. Data were collected with an online survey of 577 Tennessee home gardeners. WTP was elicited through a referendum contingent valuation. Consumer WTP for an 8.81 L bag of 25% biochar potting mix is $8.52; a premium of $3.53 over conventional potting mix. Demographics and attitudes toward biofuels and the environment influence WTP. Biochar amounts demanded are projected for the study area’s potential market. Optimal prices, profits, and market shares are estimated across different marginal costs of producing biochar potting mix.

09 BIOMASS FUELS↗

Scaled Testing to Evaluate Pulse Jet Mixer Performance in Waste Treatment Plant Mixing Vessels

The Waste Treatment and Immobilization Plant (WTP) at Hanford is being designed and built to pre-treat and vitrify the waste in Hanford’s 177 underground waste storage tanks. Numerous process vessels will hold waste at various stages in the WTP. These vessels have pulse jet mixer (PJM) systems. A test program was developed to evaluate the adequacy of mixing system designs in the solids-containing vessels in the WTP. The program focused mainly on non-cohesive solids behavior. Specifically, the program addressed the effectiveness of the mixing systems to suspend settled solids off the vessel bottom, and distribute the solids vertically. Experiments were conducted at three scales using various particulate simulants. A range of solids loadings and operational parameters were evaluated, including jet velocity, pulse volume, and duty cycle. In place of actual PJMs, the tests used direct injection from tubes with suction at the top of the tank fluid. This gave better control over the discharge duration and duty cycle and simplified the facility requirements. The mixing system configurations represented in testing varied from 4 to 12 PJMs with various jet nozzle sizes. In this way the results collected could be applied to the broad range of WTP vessels with varying geometrical configurations and planned operating conditions. Data for “just-suspended velocity”, solids cloud height, and solids concentration vertical profile were collected, analyzed, and correlated. The correlations were successfully benchmarked against previous large-scale test results, then applied to the WTP vessels using reasonable assumptions of anticipated waste properties to evaluate adequacy of the existing mixing system designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STATUS OF THE DEVELOPMENT OF IN-TANK/AT-TANK SEPARATIONS TECHNOLOGIES FOR FOR HIGH-LEVEL WASTE PROCESSING FOR THE U.S. DEPARTMENT OF ENERGY

Within the U.S. Department of Energy's (DOE) Office of Technology Innovation and Development, the Office of Waste Processing manages a research and development program related to the treatment and disposition of radioactive waste. At the Savannah River (South Carolina) and Hanford (Washington) Sites, approximately 90 million gallons of waste are distributed among 226 storage tanks (grouped or collocated in 'tank farms'). This waste may be considered to contain mixed and stratified high activity and low activity constituent waste liquids, salts and sludges that are collectively managed as high level waste (HLW). A large majority of these wastes and associated facilities are unique to the DOE, meaning many of the programs to treat these materials are 'first-of-a-kind' and unprecedented in scope and complexity. As a result, the technologies required to disposition these wastes must be developed from basic principles, or require significant re-engineering to adapt to DOE's specific applications. Of particular interest recently, the development of In-tank or At-Tank separation processes have the potential to treat waste with high returns on financial investment. The primary objective associated with In-Tank or At-Tank separation processes is to accelerate waste processing. Insertion of the technologies will (1) maximize available tank space to efficiently support permanent waste disposition including vitrification; (2) treat problematic waste prior to transfer to the primary processing facilities at either site (i.e., Hanford's Waste Treatment and Immobilization Plant (WTP) or Savannah River's Salt Waste Processing Facility (SWPF)); and (3) create a parallel treatment process to shorten the overall treatment duration. This paper will review the status of several of the R&D projects being developed by the U.S. DOE including insertion of the ion exchange (IX) technologies, such as Small Column Ion Exchange (SCIX) at Savannah River. This has the potential to align the salt and sludge processing life cycle, thereby reducing the Defense Waste Processing Facility (DWPF) mission by 7 years. Additionally at the Hanford site, problematic waste streams, such as high boehmite and phosphate wastes, could be treated prior to receipt by WTP and thus dramatically improve the capacity of the facility to process HLW. Treatment of boehmite by continuous sludge leaching (CSL) before receipt by WTP will dramatically reduce the process cycle time for the WTP pretreatment facility, while treatment of phosphate will significantly reduce the number of HLW borosilicate glass canisters produced at the WTP. These and other promising technologies will be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Recommendations from the One System Comparative Evaluation of the Hanford Tank Farms and Waste Treatment Plant Safety Bases

A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25 recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full Focus Needed on Finishing Hanford's Waste Treatment Plant - 12196

The United States Department of Energy's (US DOE's) Hanford Nuclear Site has 177 underground waste storage tanks located 19 to 24 km (12 to 15 miles) from the Columbia River in south-central Washington State. Hanford's tanks now hold about 212,000 cu m (56 million gallons) of highly radioactive and chemically hazardous waste. Sixty-seven tanks have leaked an estimated 3,785 cu m (1 million gallons) of this waste into the surrounding soil. Further releases to soil, groundwater, and the Columbia River are the inevitable result of the tanks continuing to age. The risk from this waste is recognized as a threat to the Northwest by both State and Federal governments. US DOE and Bechtel National, Inc., are building the Waste Treatment and Immobilization Plant (WTP) to treat and vitrify (immobilize in glass) the waste from Hanford's tanks. As is usual for any groundbreaking project, problems have arisen that must be resolved as they occur if treatment is to take place as specified in the court-enforceable Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) and the Consent Decree, entered into by US DOE, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology (Ecology). At times, US DOE's approach to solving these critical issues seems to have caused undue wastes of time, energy, and, ultimately, public funds. Upon reviewing the history of Hanford's tank waste treatment project, Ecology hopes that constructive criticism of past failures and praise of successes will inspire US DOE to consider changing practices, be more transparent with regulatory agencies and the public, and take a 'lean production' approach to successfully completing this project. All three Tri-Party Agreement agencies share the goal of completing WTP on time, ensuring it is operational and in compliance with safety standards. To do this, Ecology believes US DOE should: - Maintain focus on the primary goal of completing the five major facilities of WTP. - Construct a supplemental low-activity waste (LAW) vitrification facility for the two-thirds balance of LAW that will not be treated by the vitrification facility under construction. - Prepare infrastructure for waste feed from the tanks and facilities to handle the WTP waste streams. To support this project track, Ecology expedites dangerous waste permitting by using a design-build approach to integrate WTP into the Resource Conservation and Recovery Act permit for Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated sampling and data flow for Hanford vitrification - 15337

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear facility being designed, built, and commissioned for the U.S. Department of Energy (DOE) by Bechtel National, Inc. and its subcontractor URS Corporation. The WTP facilities are under construction to complete the design and construction, as well as planning to support the startup, commissioning, and operation for vitrifying the radioactive waste stored in aging underground tanks at the Hanford Site. The work progress includes development of waste feed acceptance and qualification program, including methodologies for processing feed batches. Qualification data from staged feed samples will support the verification that waste acceptance criteria (WAC) and processability requirements are met. This verification is required to ensure safe operation of WTP processes for vitrifying the waste, while establishing specific campaign and batch sheets to comply with glass form acceptance requirements. Sampling and data integration are critical for process control and monitoring of the feed through unit operations. Data collection begins with process knowledge of staged feed for determining the required WAC analyses and testing for unit operations. The waste feed qualification data form the baseline information for WTP operation. The qualification data will be tracked and compared with sample analyses at different steps in vitrification operation. All aspects of data life cycle will be managed by the WTP Plant Engineering organization. The data management approach is established in this manner to allow maintaining campaign traceability through glass production records, while safely processing the corresponding feed campaigns and complying with permitting requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing the interfaces for successful waste treatment operations at the river protection project - 15347

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize(vitrify) approximately 432 million liters (114 million gallons) of high level radioactive waste (after all single-shell retrievals are accomplished). The tank operating contractor (TOC) is charged with delivering feed, with preconditioning if required. Other Hanford contractors are charged with providing utilities and other services and waste disposal facilities. In all, four DOE contractors, two DOE offices along with DOE headquarters, and two Washington state regulators play essential roles in enabling successful treatment operations eliminate the radioactive and hazardous waste threats to the public and the environment. DOE has decided that the appropriate approach is to proceed with operations at the WTP's Low-Activity Waste (LAW) vitrification facility ahead of completing the WTP Pretreatment and High Level Waste (HLW) waste vitrification facilities, This paper outlines the approach that is being taken to ensure that all the functions, reviews, and approvals needed for radioactive operations are achieved to allow successful feed delivery, startup, and operations of the WTP in a direct feed to LAW mode. A massive effort is needed to be successful and a One System organization, jointly managed and staffed by WTP and TOC personnel is tasked with achieving the integration, coordination, tracking, and reporting necessary for the endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress updates for the Hanford waste treatment and immobilization plant project - 15593

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In recent years, the project has encountered issues that affected project design completion, especially in the Pretreatment and High-Level Waste Facilities. These included technical issues, changes in requirements, changes in funding, weaknesses in the nuclear supply chain, identification of new hazards, and new information about the tank waste. The combination of these issues led to a suspension of construction of the Pretreatment Facility and a partial suspension of construction of the High-Level Waste Facility in mid-2012. Since then, the WTP Project has made significant progress in establishing and implementing a strategy for resolving these issues. This strategy focuses on resuming full production work in a sequence that fully supports the DOE plan for a phased approach for starting treatment of the Hanford tank waste, beginning with the low-activity waste streams. Concurrent with the technical and programmatic issues, the DOE Office of River Protection has made numerous changes in the processes it uses to manage and oversee the WTP Project. These changes have had a beneficial impact on the progress the project has made in establishing a path forward for resuming production activities, and on planning for the necessary contract and baseline changes needed to complete the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Fluid Dynamics Simulations of Glass Vitrification Refractory Coupon Tests

The Waste Treatment and Immobilization Plant (WTP) at the Hanford site is nearing the start of the Direct-Feed Low-Activity Waste (DFLAW) operations. DFLAW is destined to convert a pretreated low activity waste portion of the 56 million gallons of tank waste into a stable solid glass. In the subsequent decade completion of the high-level waste (HLW) facility is anticipated. Sustained operational missions of both LAW and HLW melter facilities are expected over multiple decades. In high-temperature glass melters, the refractory lining corrodes over time, which could potentially be an issue for longer term operations, this refractory corrosion is higher at the level of the glass-air interface due to surface tension driven flow. The glass viscosity, melt pool temperature, and glass chemical composition can impact the rate at which the refractory corrodes. This rate is important to quantify for the various waste glasses to be produced at the WTP since the integrity of the refractory should not be a limiting factor affecting the lifetime of the melter. To this end, a series of glasses representative of the first batches of waste glass produced by the WTP will be melted in small-scale crucibles with Monofrax® K-3 coupons inserted. The corrosion of the K-3 will be measured in the melt and at the meltline (or neckline). A model for the corrosion rate will be constructed and implemented into a previously developed framework for a computational fluid dynamics (CFD) model of the full-scale WTP. To assist with experimental design and validate the implementation of the model in the full-scale melter, CFD simulations of the small-scale crucible tests were performed. The bubbling that occurs in the small-scale crucible is initially validated here with a model that uses silicone oil at room temperature. The viscosity of the oil ranges from 1 to 100 Pa•s, which corresponds to operating glass pool temperatures near 1150 °C down to idling temperatures near 950 °C. The simulation results show good agreement with the bubble sizes that form during experiments. CFD modeling of the crucible setup was used to determine bubbling characteristics to match the range of near-wall velocities expected in the full-scale WTP. This study presents the initial CFD modeling results, corrosion testing plan, and some preliminary corrosion samples with an outline for the next steps for the development of the corrosion model.

Abboud, Alexander W. [Idaho National Lab]↗