Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Technologies to Mitigate the Presence of Gaseous Elemental Mercury in Waste Disposal Containers

A study was conducted to evaluate sorbent technologies that can mitigate the presence of elemental mercury (Hg⁰) in waste containers for mercury-contaminated debris (MCD). Decontamination and demolition (D&D) activities at the Y-12 National Security Complex (Y-12) and other U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) facilities generate MCD requiring offsite disposal. The debris is packaged in appropriate waste containers and may be temporarily stored onsite prior to transport for treatment and/or disposal. During transportation of loads that had no visible liquid Hg at the point of origin, temperature changes can cause Hg⁰ to evaporate, condense, and form droplets on container walls. Furthermore, vibration during transportation could cause beads of Hg to be released from the debris, container walls, and ceiling, resulting in pools of liquid Hg⁰ on the container floor. Waste acceptance criteria (WAC) limitations for commercial disposal facilities, the Nevada National Security Site (NNSS), and ORR mixed low-level waste landfills prohibit the presence of any free liquids in containers identified as a solid waste form. Potential solutions to mitigate the presence of residual liquids that could be formed through vapor condensation include the use of sorbents or similar materials to capture and stabilize volatile Hg⁰ vapors and thus ensure compliance with landfill WAC requirements. This report summarizes data from small-scale laboratory experiments conducted to evaluate sorbent materials for Hg⁰ vapor suppression and sorption of liquid Hg⁰ that could form under relevant transportation and disposal conditions. A series of experiments was conducted to evaluate commercial sorbent materials and their effectiveness for Hg⁰ sorption across a temperature range from 19.4°C to 60°C. The impact of residual moisture on sorption was investigated under relevant conditions, and leaching tests were performed to assess the stability of Hg⁰ captured sorbent materials. The results provide estimates for sorbent quantities needed for a given Hg⁰ mass loading based on experimental results exposing sorbents to gaseous and liquid Hg⁰ at various mass ratios. Overall, sorbents that were most effective for Hg⁰ vapor suppression were brominated activated carbons, mackinawite-based sorbents coated on vermiculite, and sulfur-modified granular activated carbon. Elevated temperatures and moisture conditions did not result in significant increases of Hg⁰ headspace concentrations, and the materials also demonstrated high sorption capacities for the sorption of liquid Hg⁰.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process and environmental safety of thermochemical conversion of biomass

Biomass presents a promising opportunity for converting waste into valuable energy, fuels, and chemicals through various thermochemical processes, including hydrothermal carbonization, hydrothermal liquefaction, pyrolysis, gasification, and combustion. However, these processes operate under extreme conditions, introducing significant safety hazards that necessitate meticulous management to prevent accidents. This review discusses potential hazards, risk mitigation strategies, and safety management practices, emphasizing the importance of integrated safety measures into the design and operation of these processes. It also highlights the critical need for robust safety engineering and environmental management strategies tailored to each thermo-chemical process. As these processes transition from laboratory to industrial scale, there is an imperative to develop a clear and concise pathway for emerging industries to achieve regulatory compliance, achieve safety certification, and enable effective stewardship of potential fugitive emissions. By addressing safety and environmental concerns, stakeholders can optimize economic benefits, rural development, and achieve sustained domestic energy generation benefits offered by biomass conversion technologies. Further research on plant design optimization, operational safety, environmental evaluation standardization, and innovative waste management solutions will support the safe and effective scaling of these technologies, ultimately contributing to sustainable management and resource recovery.

09 - BIOMASS FUELS↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 129: Perspectives (US and Non-US) on the Use of Risk and Dose Assessment Tools (R9.3)

This panel focused on various dose and risk assessment tools for assessments, Deactivation and Decommissioning, remediation, and closure of sites of chemical and radioactive wastes. Representatives from the US government agencies, non-US countries and their representative regulatory bodies or authorities, as well as performance/risk assessment practitioners compared and contrasted the various guidance from regulatory agencies and authorities on how tools such as the Preliminary Remediation Goals (PRG) calculator, the Dose Compliance Concentrations (DCC) calculator, and Residual Radioactivity (RESRAD) should be used in support of analyses and decisions for environmental cleanup activities. Panelists with presentations: Cumulative Impact Evaluation: Innovative Tools for Evaluation of Groundwater Protection (Alaa Aly); Superfund Evaluation Process for Alternative Risk and Dose Models (with Focus on EPA and DOE Tools) (Stuart Walker); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Analysis Report INV-SAR-79, Revision 0 Chemical and Cement Components 2023 Inventory Estimates

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Mule Deer Monitoring Report for Fiscal Years 2024 and 2026

The U.S. Department of Energy, Hanford Field Office (HFO) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with environmental laws, regulations, and policies governing Department of Energy activities. The vision for the HFOmanaged portion of the Hanford Site, hereby referred to as Central Hanford, focuses not only on the cleanup of nuclear facilities and waste sites but on the protection and restoration of the Hanford Site lands. As the HFO moves toward accomplishing this vision, understanding of the ecological resources present and the need for conservation and/or protection of those resources will be critical for making informed decisions for responsible site stewardship. Ecological monitoring data provides baseline information about the plants, animals, and habitats under HFO stewardship at Central Hanford required for decision-making under the National Environmental Policy Act of 1969 (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act of 1980.

54 ENVIRONMENTAL SCIENCES↗

Environmental Performance Report 2021: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in 2021, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

air quality↗

Environmental Performance Report 2022: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2022, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

air quality↗

Plutonium Oxidation State Distribution in the Presence of WIPP-Relevant Organics and Iron Corrosion Products

The oxidation state and solubility of plutonium (Pu) in high ionic strength synthetic WIPP (Waste Isolation Pilot Plant) brines as a function of pC H+ in the presence and absence of WIPP-relevant organic ligands (EDTA [Ethylenediaminetetraacetic acid], oxalate, citrate, acetate) and iron corrosion products (magnetite and metallic iron) at 𝑇 = 23 ± 2 ∘C was thoroughly studied by long-term batch solubility experiments (between approximately 800-1,100 days) from an undersaturation approach. The oxidation state of Pu in the WIPP environment has been a topic of interest since the initial Compliance Certification Application (CCA). This study aims to investigate the solubility of Pu under the expected WIPP conditions and to determine the oxidation state of the solid phase that will control the solubility. One of the most important results of this study is that the Pu oxidation state was analyzed both from the surface area of the corrosion products and in the precipitated solid. The analysis of the Pu oxidation state on the surface of the iron mineral from the ongoing undersaturated experiments is more relevant to the performance assessment of nuclear waste disposal than short term batch (plutonium-iron phase) experiments. The X-ray Absorption Near-Edge Spectroscopy (XANES) analysis showed that Pu oxidation state is different on the metal surface and in the precipitated solid. Pu(III) is the dominant oxidation state in the metallic iron (Fe 0 ) system in the presence and absence of organics. Pu(IV) is the dominant oxidation state in the magnetite system in the presence and absence of organics. Also, organics stabilize Pu(IV) in the magnetite system. Analysis of Pu in the precipitated solid by Extended X-ray Absorption Fine Structure (EXAFS) analysis showed that Pu formed an inner-sphere complex with iron with minor amounts of PuO 2 present. X-ray diffraction (XRD) results indicate that metallic iron and magnetite did not oxidize in three years in the alkaline and high ionic strength system. Under these conditions (8 < pC H+ < 10 at T = (22 ± 2) °C under nitrogen atmosphere, the solubility of Pu changes by up to three orders of magnitude (10 -5 and 10 -8 M). The spread in solubility is highest at pC H+ = 9. Pu(III) and Pu(IV) showed different solubility behavior in the synthetic WIPP brine. A summary of the data collected in this report will be submitted to Sandia National Laboratories as part of a parameter update report which will outline the changes to the OXSTAT parameter for the 2026 Compliance Recertification Application (CRA-2026). The experiments performed were done according to the U.S. Department of Energy (DOE) approved Test Plan entitled “Effects of Radiolysis, Organic Complexation, and Redox Conditions on the Speciation and Oxidation State Distribution of Pu(III/IV)” (LCO-ACP-25). All data reported were obtained under the Los Alamos National Laboratory-Carlsbad Office (LANL-CO) Quality Assurance Program, which is compliant with the DOE Carlsbad Field Office, Quality Assurance Program Document (CBFO/QAPD).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Time Sensitive Chemical Testing and Reduction at LANL [Slides]

Mission critical operations and other research in the past and present require the use of Time Sensitive Chemicals (TSC). TSC generate additional hazards over time and require routine testing or evaluation for safe usage and storage. in January 2023, testing and evaluation on TSC fell below 50% compliance and multiple containers required controlled destruction, leading to management action.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards Development of a Conceptual Model for Mercury in Bear Creek, Oak Ridge, Tennessee (FY23 Update)

Mercury concentrations in fish in Bear Creek are elevated and comparable to concentrations seen in fish in East Fork Poplar Creek (EFPC) on the Oak Ridge Reservation, even though aqueous inorganic mercury concentrations are orders of magnitude lower in Bear Creek than in EFPC. Acknowledging that the relationship between aqueous and fish tissue mercury concentrations is not linear, and that methylmercury (MeHg) concentrations are likely more related to fish tissue concentrations than aqueous total mercury (Hg T ) concentrations, MeHg production is not easily predicted or controlled. In Bear Creek, where aqueous Hg T concentrations are low, factors other than mercury loading drive the transformation of mercury to MeHg and subsequent trophic transfer to fish. Initial development of a waste disposal facility (Environmental Management Disposal Facility; EMDF) in Bear Creek Valley has begun, and operation of the EMDF has the potential to increase mercury inputs to Bear Creek. Consequently, understanding the factors contributing to elevated MeHg concentrations in water and fish in Bear Creek has increased relevance and importance. This report summarizes data from recent and historical compliance and investigatory studies with an eye toward building a conceptual model to understand the processes affecting mercury transport and transformation in the Bear Creek watershed, as well as to highlight key knowledge gaps in our understanding of these processes that warrant further investigation. The conceptual model will provide a strong technical basis for prioritizing and optimizing potential mitigation actions or best management practices to minimize potential negative effects of the EMDF related to mercury in Bear Creek.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Analytical Services for the Hanford Site Radionuclide NESHAP Program

This document is a summary of the point source analytical requirements used to demonstrate compliance for the Department of Energy (DOE) Hanford Site operations with 40 Code of Federal Regulations (CFR) Part 61, “National Emission Standards for Hazardous Air Pollutants,” (NESHAP) Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities,” and the Washington Administrative Code (WAC) 246-247, “Radiation Protection – Air Emissions.” This reference collects information from multiple source documents and is not intended to create, supersede, replace or over-ride any existing contractual, DOE, federal or state statutes, regulations, compliance agreements, orders, permits, licenses or other requirements. The requirement source document governs where any difference may exist. The Hanford Mission Integration Solutions (HMIS) Environmental organization has been contracted by DOE to manage and report data collected from the sampling and monitoring of radioactive air emissions point sources, colloquially called stacks. The Environmental organization coordinates the analyses and reporting of samples collected at various facilities across the Hanford Site. These facilities operate approximately 52 stacks that require sampling, monitoring or estimating radioactive air emissions. The stacks are operated by Bechtel National, Inc. (BNI), Central Plateau Cleanup Company (CPCCo), Hanford Tank Waste Operations & Closure (H2C), Hanford Laboratory Management and Integration (HLMI), and Pacific Northwest National Laboratory (PNNL). Stack samples from CPCCo, HLMI and H2C facilities are collected by the operating contractor staff, delivered to HMIS, and then shipped to an offsite contracted laboratory for analyses. The field and laboratory sample data uploaded into the Sample Management and Analytical Results Tracking (SMART) database are used to calculate sample volumes and concentrations. Sample concentrations are evaluated for compliance with federal and state regulations, permits, and license requirements. The SMART database also calculates total curies released for sampled point sources and stacks. Point source effluent concentrations and releases are published annually in publicly available reports. The BNI and PNNL operate several DOE-Hanford Field Office (HFO) stacks subject to the requirements of 40 CFR 61, Subpart H and WAC 246-247. The concentrations, curies released and dose modeling evaluation for these stacks are included in the DOE-HFO annual radionuclide NESHAP report. The sample collection, analyses and emissions estimates for these stacks are outside the scope of HMIS contracted responsibilities and not addressed further in this document.

54 ENVIRONMENTAL SCIENCES↗