Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Minimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Testing of High S Matrix Glasses to Expand DFHLW Glass Compositional Ranges (Rev.1)

Gaps in glass composition-property data for direct-feed high-level waste (DFHLW) have recently been identified. One such gap is the region of high sulfur solubility since previous, pretreated, high-level wastes contained very little sulfur. Filling this data gap will significantly broaden the range of process flowsheet options including minimal washing and will allow for optimized waste loading in DFHLW glasses. This report summarizes the data collected during the characterization of the DFHLW High S Glass Matrix (HS24). A glass matrix of 50 glass compositions was developed to evenly cover the DFHLW composition region for high sulfur glass. Matrix glasses were designed to expand the composition region outside the current component concentration and property limits so as to reduce uncertainties at the limits. The 50 matrix glasses were fabricated and tested for properties important to the success of DFHLW vitrification including: compositions, canister centerline cooling (CCC) crystallinity and isothermal crystallinity, density, viscosity, electrical conductivity (EC), product consistency test (PCT) response, toxicity, and sulfate solubility. Melter materials corrosion testing is reported elsewhere. These glasses were intentionally designed to have high SO 3 solubilities (0.7 to 2.2 SO 3 wt%) in compositional regions that had not been previously explored. Forty-eight glasses showed the measured SO 3 content retained >80% of the target SO 3 and the densities of all the glasses ranged from 2.49 g·cm -3 to 2.74 g·cm -3 . While the model predicted nepheline formation in 5 glasses, one of the tested 50 CCC glasses formed nepheline, and 35 glasses formed Cr-containing phases such as spinels and eskolaite. Only five glasses were amorphous after CCC treatment where 44 glasses with detectable crystals contained =10 wt% crystals and only one glass had > 10 wt% crystals. None of the glasses exceeded the allowable T 2% for spinel crystal formation at 950 ºC (i.e., no glasses had >2 wt% spinel at 950 ºC) during isothermal crystal fraction tests where 10 glasses showed no crystalline phases at or below 950 ºC. All the glasses (except one which failed being slightly lower than the target) satisfied the SO 3 constraint while 98 glasses did not meet the viscosity constraints and 4 failed the EC constraints. Six quenched (Q) and six CCC glasses failed the Defense Waste Processing Facility (DWPF) Environmental Assessment (EA) glass PCT threshold and 3 Q and 4 CCC failed the PCT design constraint. One glass exceeded the WTP delisting limits for Cr via EPA Method 1311 (i.e., Toxicity Characteristic Leaching Procedure, TCLP). It should be emphasized that some of these glasses were specifically designed to approach or even exceed certain property constraints, as filling data gaps in these regions will provide the greatest benefit for future model development by improving accuracy and reducing uncertainties. These insights will ultimately support the development of more robust glass formulation strategies, enabling higher waste loading, reducing operational risks, and expanding the processing envelope.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Relationship Between the Marginal Probability of Failure for a CPP Test and the Recommended Corrosion Control Requirements for Hanford Double Shell Waste Tanks

The Hanford Site in Washington State currently stores millions of gallons of radioactive waste in underground, carbon steel, double shell tanks (DSTs) that were constructed between 1968 and 1986. A chemistry control and monitoring program has been established mitigate corrosion in order to extend the service life for the DSTs. The current waste temperatures in the DSTs are at historical lows (i.e., typically less than 50 °C). The previous chemistry control requirements were determined for conditions at temperatures significantly higher. SRNL undertook a statistically based investigation of the role of nitrate and halide ion (i.e., chloride and fluoride) induced pitting corrosion. The objective was to develop a comprehensive waste chemistry envelope for the simultaneous minimization of the pitting and SCC risks caused by halide and nitrate ions at the lower temperature conditions. On the basis of these tests, new chemistry control requirements were proposed and have since been implemented for pitting corrosion control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Irradiation Assessment of a Lightweight Industrial Robot - Towards Faster, Safer and Sooner Waste Decommissioning - 20317

Robotic systems have been successfully applied in the nuclear industry for several decades as a safe approach to minimize the exposure dose of human operators. As nuclear waste management and decommissioning gathers pace, there is an emerging interest integrating modern off-the-shelf industrial robots in nuclear robotic systems which make use of complex electronics and software to improve functionality over traditional machines. The use of the industrial robots will significantly increase the pace of development of automated waste management systems at a reduced cost, and although these off-the-shelf robots are proven robust in typical industrial environments, performance in radioactive environments is less clear. This paper investigates the performance degradation of a lightweight industrial robot (KUKA iiwa 7 LBR 800) in a controlled radiation field, aiming to simulate conditions in highly radioactive nuclear waste handling facilities. The degradation of the industrial robot's performance is identified while measuring the air kerma dose-tolerance of sensitive components, via a systematic experimental methodology. The experience from this experiment has demonstrated the significant capabilities of industrial robots, which tolerated a large gamma dose of 164 Gy before a system failure. Future tests are planned, aiming to enable faster, safer and sooner waste management and decommissioning using complex robotic systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pseudo-Hot-Isostatic Pressing (P-HIP)

Researchers at Los Alamos National Laboratory developed a technology to produce high performance ceramic or metal with a combination of major key properties such as versatile-complicated shape, high density, uniform density distribution, and minimal amounts of starting material. The novel pseudo-hot-isostatic-pressing (P-HIP) uses graphite or boron nitride flakes as the stress transmission media to transmit stress instead of the conventional solid graphite punch. The graphite and boron nitride flakes are solid lubricants and can slide among one another to re-distribute the stress from high stress concentration area to the low stress concentration areas, resulting in a self-stress-relief action. This innovative P-HIP enables the manufacturing of complicated shapes with near-net-shape capability while minimizing the energy used and reducing waste. This is a revolutionary breakthrough to the ceramics and powder metallurgy industries.

36 MATERIALS SCIENCE↗

Monte Carlo Simulations in Support of NorthStar Irradiation Facility Commissioning Procedure

NorthStar Medical Radioisotopes LLC is constructing an irradiation facility at which electron accelerators will induce photo-transmutation (i.e., neutron knockout) of molybdenum-100 (Mo-100) to produce medically useful Mo-99. The facility will house two high-intensity electron RhodotronTM accelerators developed by IBA Industrial. The nominal power of each Rhodotron is 125kW at 40 MeV beam energy. The production target is made of metallic molybdenum enriched with Mo-100 isotope. It will be irradiated by electron beams and will itself play a role in electron conversion to intense X-rays. A full description of the NorthStar target as well as the concept of radiation shielding of the facility can be found in our previous report. The NorthStar irradiation facility is under commissioning now. The goal of the present work is to support the commissioning process by: (1) Studying residual radiation and activation to minimize personnel exposure and inform radiation waste management; (2) Using computational fluid dynamics (CFD) of the irradiated target to ensure the facility design is safe and reliable; and (3) Helping to determine radiation protection requirements during operation. Monte Carlo simulations are used for the analyses. Most of the results are presented as 3D arrays representing spatial distribution of values across simulated geometries: radiation energy depositions, ambient doses, residual isotopes accumulated, and residual doses.

07 ISOTOPE AND RADIATION SOURCES↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification - APPS1 Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory inContact with Molten Glasses Designed for Waste Vitrification - VSL Touchpoint Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests. Refractory corrosion is generally reported as physical material loss, measured in units of distance (e.g., inch) or as physical material loss rate, measured in units of distance per time (e.g., inch/day). In post-operational melters, the refractory corrosion is measured directly, sometimes reported as corrosion depth. Crucible tests are used in the laboratory to accelerate the refractory corrosion to facilitate a meaningful measurement in a commensurate amount of time. Crucible tests are particularly useful in understanding refractory corrosion across a large glass composition space, where operational testing would be prohibitive. Some of the critical parameters that are known to influence refractory corrosion by molten glass in a crucible test are temperature, system redox, molten salt phases, glass chemistry, and test duration. The majority of data collected for Monofrax® K-3 (hereafter referred to as K-3) corrosion is from crucible tests, but a small amount comes directly from scaled and production melters. Crucible test data has been collected under varying conditions, whereas data collected from operational melters is relatively fewer and represents conditions specific to the melter campaign. The result is that the published data can be grouped and analyzed in multiple ways, not all of which are readily comparable. The Standard Test Method for Isothermal Corrosion Resistance of Refractories to Molten Glass (ASTM C621) outlines the general guidelines used across industry. That method describes a sealed, static test in which the surface area of the refractory coupon and the volume of glass are fixed. A significant portion of the crucible data pertaining to nuclear waste glasses has been collected in a modified configuration; the most notable differences being the surface area of the refractory coupon to volume of the glass and use of a method for bubbling the melt. To our knowledge, the influence of those parameters on the refractory corrosion has not been quantified. In this work, it was determined that static tests and bubbled tests would be performed. Savannah River National Laboratory (SRNL) was tasked with setting up and performing static testing while PNNL was tasked with setting up and performing bubbled testing. Initial activities were performed to establish laboratory methods that reproduce data comparable to existing data sets of K-3 refractory corrosion by low activity waste (LAW) and high-level waste (HLW) glass compositions. Later activities were focused on refining the test parameters to establish a standard test practice to be used between Laboratories and collecting additional data to be used in the enhanced waste glass model development. This document serves primarily to convey the refractory loss measurement results from corrosion testing of K-3 refractory with waste glass compositions developed for use in the WTP melters. The data will be used in the enhanced property/composition models being developed for waste glass vitrification and melter operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification - HAL24 M1 Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification – VSL Touchpoint Matrix Glasses (Revision 1)

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF).[1] The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthetic Calcium Carbonate Production by Carbon Dioxide (CO 2 ) Mineralization of Industrial Waste Brines

The global scale of CO 2 emission has crossed 36 B tons, and the United State represents 14% of the total emissions. In light of the high cost associated with current CO 2 capture processes ($60-to-150 per ton of CO 2 ), carbon capture and utilization (CCU), wherein CO 2 is converted to beneficial products, provides a pragmatic path to overcome the economic barrier for CO 2 emissions control. In particular, CO 2 mineralization offers an attractive route as it produces high-value mineral carbonates that sequester CO 2 in a stable form. For instance, fine precipitated calcium carbonate, a valuable product with unit price in the range of $230-280/t and a global market projected to reach 99 M tons in 2020, can be produced by capturing CO 2 within aqueous Ca 2+ solution. However, two critical challenges need to be overcome—(i) the need for costly processes such as electrolysis or addition of alkali hydroxides to maintain alkalinity during mineralization, and (ii) the geographic availability of Ca-rich solutions (or brines) which often renders efficient integration with power plants impractical. To simultaneously address these challenges, this project developed two novel routes to enable carbonate production based on efficient CO 2 mineralization. In one variation, the project developed a new alkaline carbonation process to capture CO 2 and produce calcite precipitates from coal ashes. Herein, coal ash is carbonated first in a sodium carbonate solution. The carbonation reaction produces sodium hydroxide and raises the solution pH. This high-pH hydroxide solution is then used for CO 2 capture, which converts the sodium hydroxide solution back to sodium carbonate to repeat the carbonation cycle. The carbonated ash residue is refined with a CO 2 pressure swing step to produce high-purity precipitated calcium carbonate. In another variation, Ca-rich produced water brine serves as the Ca-source to mineralize CO 2 . An H + /Na + ion-exchange cycle was designed to provision alkalinity during mineralization and regenerate the ion-exchange reagent in brines with high salinity. Ca-depleted brines can then be treated within a centralized water treatment facility. Both variations beneficially utilize reject streams—such as coal ashes and brines from oil and gas extraction or CO 2 storage operations—that are available at substantial quantities in the vicinity of coal power plants within the U.S. In addition to technology development, this project included techno-economic and life-cycle analysis to identify technically and economically appropriate solutions for power plants in different geographic locations. Taken together, the project provides a unique route to integrate CO 2 emissions control and waste handling/treatment for coal power plants, while producing a high-value product to offset the economic burden associated with waste management. The developed processes utilize post-desulfurization flue gas from coal-fired power plants as is. The CO 2 conversion reactions are performed in alkaline brines at ambient pressure from the flue gas, thereby minimizing the energy burden. By beneficiation of industrial waste streams with low energy input, the processes offers significant technical advantages in energy and CO 2 footprint over the current paradigm of precipitated calcium carbonate production, which involves calcination of limestone at processing temperatures in excess of 800 °C. Overall, this project developed viable CO 2 mineralization processes while strategically maximizing the economic benefit.

01 COAL, LIGNITE, AND PEAT↗

Circular Economy for Photovoltaics in Service of Energy Transition

The challenge of energy transition is immediate and immense; current projections target 75 TW of photovoltaics (PV) capacity by 2050. While any transition to renewable energy technology is preferable to the current fossil-based system, it is ideal to improve the sustainability of PV to minimize negative environmental and social impacts. Circular economy (CE) has been proposed as a method to improve the sustainability of PV, especially for emerging materials like perovskites. CE is a set of actions, principles, and systems which aim to design out waste and keep products and materials in use, to reduce environmental impacts and enable sustainable development. At the most basic level, CE is "reduce, reuse, recycle", the R-actions, in ranked order. CE of a PV technology can be metricized in a variety of ways, such as the Material Circularity Indicator (Smith and Jones, Ellen MacArthur Foundation, 2019) or recycling rates. Unfortunately, standard CE metrics have several shortcomings for measuring renewable energy technologies in the context of deployment for energy transition (Figge 2018, Saidani 2019): 1) Only measure mass flows; 2) De-prioritization of the use phase in favor of mass circularity when scoring; and 3) Tight focus on a single product scale The use phase and energy flows of PV are key to energy transition, and therefore need to be quantified. Additionally, correlating product-scale to system-scale is necessary for quantifying the environmental impacts of energy transition. Life Cycle Assessment (LCA) can address some of these concerns, but also focuses on a single product scale and has trouble capturing the dynamics of system-scale energy transition, such as the interaction of module lifetime with manufacturing demands for energy transition deployment schedules. Therefore, we developed an open-source Python-based system dynamics model to quantify the mass, energy and carbon impacts of CE R-actions for PV technologies in the energy transition; PV in the CE (PV ICE) (Ovaitt & Mirletz 2021). The tool captures supply chains from material extraction through end of life, incorporating 5 circular end of life pathways. PV ICE takes in any evolving bill of materials, module properties and deployment schedule to support researchers and decision makers with data-backed insights. In this work, we quantify and compare proposed CE sustainable PV module designs and lifecycle management strategies, spanning currently commercialized technologies, government and industry technology targets, and several low Technology Readiness Level (TRL) emerging PV technologies, including perovskites. Our analyses capture the projected evolutions of lifetime, efficiency and material circularity of these PV technologies, as well as their material supply chains. Our analyses emphasize the importance of examining a suite of metrics to identify priorities and tradeoffs, and inform design or lifecycle management decisions holistically. Previous analyses have demonstrated the central importance of PV module lifetime to support energy transition while minimizing impacts. High levels of material circularity (>90%) enable minimizing lifecycle wastes, can reduce virgin material demands if paired with improving efficiency, but demonstrate tradeoffs in energy return on investment. In the fervor of new material and technology development, it is important to remember that CE is not the end goal; decarbonization and energy transition are the end goal. CE should be used in service to improve the sustainability of PV, and R-actions evaluated for their usefulness and efficacy to this end.

carbon↗

Chlorination of HALEU regulus casting dross

A scoping study was performed for chlorinating dross formed during uranium casting operations. Here, the purpose is to minimize the losses of uranium to dross wastes. The dross is primarily a mixture of uranium metal and uranium oxide with a minor fraction of crucible and crucible coating materials. The reaction chemistries were performed in a carrier salt of LiCl-KCl eutectic at 500 °C. The addition of FeCl 2 chlorinated the uranium metal to UCl 3 , by reducing the FeCl 2 to iron metal. After the uranium metal was chlorinated, zirconium metal was added to the salt. The residual FeCl 2 chlorinated the zirconium metal to ZrCl 4 , by reducing the FeCl 2 to iron metal. In turn, the ZrCl 4 chlorinated the uranium oxide to UCl 3 , by converting the ZrCl 4 to zirconium oxide. The effectiveness of the chlorination reactions was qualitatively verified by cyclic voltammograms that indicated the presence or absence of FeCl 2 and UCl 3 in the salt.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aerogel from Sustainably Grown Bacterial Cellulose Pellicles as a Thermally Insulative Film for Building Envelopes

Improving building energy performance requires the development of new highly insulative materials. An affordable retrofitting solution comprising a thin film could improve the resistance to heat flow in both residential and commercial buildings and reduce overall energy consumption. Here, we propose cellulose aerogel films formed from pellicles produced by the bacteria Gluconacetobacter hansenii as insulation materials. We studied the impact of the density and nanostructure on the aerogels’ thermal properties. A thermal conductivity as low as 13 mW/(K·m) was measured for native pellicle-based aerogels that were dried as-is with minimal post-treatment. The use of waste from the beer brewing industry as a solution to grow the pellicle maintained the cellulose yield obtained with standard Hestrin-Schramm media, making our product more affordable and sustainable. In the future, our work can be extended through further diversification of food wastes as the substrate sources, facilitating higher potential production and larger applications.

36 MATERIALS SCIENCE↗

Solubility behavior and thermodynamic modeling of sodium monosulfoaluminate (“U‐phase”) in cementitious systems

Abstract The “U‐phase,” a sodium‐containing (alumino‐ferrite‐monosubstituent) AFm phase, has been observed to form in sodium‐enriched highly alkaline cementitious systems, for example, of relevance to nuclear waste, and saline industrial brine management. But, minimal information is available of the U‐phase's (e.g., solubility or thermodynamic properties) due to its limited stability and its tendency to transform into ettringite or monosulfoaluminate. Herein, the U‐phase was systematically synthesized at four temperatures (5, 15, 25, and 50°C) and fully characterized in terms of its thermochemical properties. The average composition of the synthesized U‐phase (4CaO·Al 2 O 3 ·1.85SO 3 ·0.85Na 2 O·12H 2 O) deviates slightly from typical disclosures in the literature. The solubility product of the U‐phase formation was measured from conditions of oversaturation. The measured thermodynamic data accurately predicted experimental observations of U‐phase formation in cementitious environments. In general, it was noted that the U‐phase forms and persists (i.e., remains stable) at pH > 13.7 and [Na + ] concentrations superior to 1 mol/L.

Materials Science↗

In-Situ Calibrated Digital Process Twin Models for Resource Efficient Manufacturing

The chief objective of manufacturing process improvement efforts is to significantly minimize process resources such as time, cost, waste, and consumed energy while improving product quality and process productivity. This paper presents a novel physics-informed optimization approach based on artificial intelligence (AI) to generate digital process twins (DPTs). The utility of the DPT approach is demonstrated in the case of finish machining of aerospace components made from gamma titanium aluminide alloy (γ-TiAl). This particular component has been plagued with persistent quality defects, including surface and sub-surface cracks, which adversely affect resource efficiency. Previous process improvement efforts have been restricted to anecdotal post-mortem investigation and empirical modeling, which fail to address the fundamental issue of how and when cracks occur during cutting. In this work, the integration of in-situ process characterization with modular physics-based models is presented, and machine learning algorithms are used to create a DPT capable of reducing environmental and energy impacts while significantly increasing yield and profitability. Based on the preliminary results presented here, we report an improvement in the overall embodied energy efficiency of over 84%, 93% in process queuing time, 2% in scrap cost, and 93% in queuing cost has been realized for γ-TiAl machining using our novel approach.

42 ENGINEERING↗