Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Rocket-Based Combined-Cycle Propulsion Technology for Access-to-Space Applications

NASA's Office of Aero-Space Technology (OAST) established three major goals, referred to as, "The Three Pillars for Success". The Advanced Space Transportation Program Office (ASTP) at the NASA's Marshall Space Flight Center (MSFC) in Huntsville, Ala. focuses on future space transportation technologies under the "Access to Space" pillar. One of the main activities over the past three years has been on advancing the hydrogen fueled rocket-based combined cycle (RBCC) technologies. The RBCC effort that was completed early this year was the initial step leading to flight demonstrations of the technology for space launch vehicle propulsion. Aerojet and Boeing-Rocketdyne designed, built and ground tested their RBCC engine concepts. In addition, ASTROX, Georgia Institute of Technology, McKinney Associates, Pennsylvania State University (PSU), and University of Alabama in Huntsville conducted supporting activities. The RBCC activity included ground testing of components (e.g., injectors, thrusters, ejectors and inlets) and integrated flowpaths. Inlet testing was performed at the Lewis Research Center's 1 x 1 wind tunnel. All direct connect and free-jet engine testing were conducted at the GASL facilities on Long Island, New York. Testing spanned the Mach range from sea level static to Mach 8. Testing of the rocket-only mode, simulating the final phase of the ascent mission profile, was also performed. The originally planned work on these contracts was completed in 1999. Follow-on activities have been initiated for both hydrogen and hydrocarbon fueled RBCC concepts. Studies to better understand system level issues with the integration of RBCC propulsion with earth-to-orbit vehicles have also been conducted. This paper describes the status, progress and future plans of the RBCC activities funded by NASA/MSFC with a major focus on the benefits of utilizing air-breathing combined-cycle propulsion in access-to-space applications.

Hueter, Uwe↗

Intelligent Systems Technologies for Ops

As NASA supports International Space Station assembly complete operations through 2020 (or later) and prepares for future human exploration programs, there is additional emphasis in the manned spaceflight program to find more efficient and effective ways of providing the ground-based mission support. Since 2006 this search for improvement has led to a significant cross-fertilization between the NASA advanced software development community and the manned spaceflight operations community. A variety of mission operations systems and tools have been developed over the past decades as NASA has operated the Mars robotic missions, the Space Shuttle, and the International Space Station. NASA Ames Research Center has been developing and applying its advanced intelligent systems research to mission operations tools for both unmanned Mars missions operations since 2001 and to manned operations with NASA Johnson Space Center since 2006. In particular, the fundamental advanced software development work under the Exploration Technology Program, and the experience and capabilities developed for mission operations systems for the Mars surface missions, (Spirit/Opportunity, Phoenix Lander, and MSL) have enhanced the development and application of advanced mission operation systems for the International Space Station and future spacecraft. This paper provides an update on the status of the development and deployment of a variety of intelligent systems technologies adopted for manned mission operations, and some discussion of the planned work for Autonomous Mission Operations in future human exploration. We discuss several specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station, and supporting the current Autonomous Mission Operations Project for the mission operation support of the future human exploration programs.

Smith, Ernest E.↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Discrete Element Modeling (DEM) of Triboelectrically Charged Particles: Revised Experiments

In a previous work, the addition of basic screened Coulombic electrostatic forces to an existing commercial discrete element modeling (DEM) software was reported. Triboelectric experiments were performed to charge glass spheres rolling on inclined planes of various materials. Charge generation constants and the Q/m ratios for the test materials were calculated from the experimental data and compared to the simulation output of the DEM software. In this paper, we will discuss new values of the charge generation constants calculated from improved experimental procedures and data. Also, planned work to include dielectrophoretic, Van der Waals forces, and advanced mechanical forces into the software will be discussed.

Hogue, Michael D.↗

Building intelligent systems - Artificial intelligence research at NASA Ames Research Center

The basic components that make up the goal of building autonomous intelligent systems are discussed, and ongoing work at the NASA Ames Research Center is described. It is noted that a clear progression of systems can be seen through research settings (both within and external to NASA) to Space Station testbeds to systems which actually fly on the Space Station. The starting point for the discussion is a 'truly' autonomous Space Station intelligent system, responsible for a major portion of Space Station control. Attention is given to research in fiscal 1987, including reasoning under uncertainty, machine learning, causal modeling and simulation, knowledge from design through operations, advanced planning work, validation methodologies, and hierarchical control of and distributed cooperation among multiple knowledge-based systems.

Friedland, Peter↗

Building intelligent systems: Artificial intelligence research at NASA Ames Research Center

The basic components that make up the goal of building autonomous intelligent systems are discussed, and ongoing work at the NASA Ames Research Center is described. It is noted that a clear progression of systems can be seen through research settings (both within and external to NASA) to Space Station testbeds to systems which actually fly on the Space Station. The starting point for the discussion is a truly autonomous Space Station intelligent system, responsible for a major portion of Space Station control. Attention is given to research in fiscal 1987, including reasoning under uncertainty, machine learning, causal modeling and simulation, knowledge from design through operations, advanced planning work, validation methodologies, and hierarchical control of and distributed cooperation among multiple knowledge-based systems.

Friedland, P.↗

OPEX propagation measurements and studies

With the launch of the telecommunications Olympus satellite a new area began for the Olympus Propagation Experiments (OPEX) group. The years of preparations are now paying off - the experiments are underway and the co-operative effort is now turning its attention to the processing and analysis of data and to the interpretation of results. The aim here is to give a short review of the accomplishments made since NAPEX 13 and the work planned for the future. When ESA's Olympus was launched in summer of 1989 it carried a payload producing three unmodulated beacons at 12.5, 19.8, and 29.7 GHz. The main purpose of these beacons is to enable scientists to carry out long term slant path propagation experiments at these frequencies. The OPEX group, which was set up under ESA auspices in 1980, had been preparing for this event very carefully. The specifications for the equipment to be used and the elaboration of standard procedures for data processing and analysis have been worked out jointly. Today the OPEX community includes approximately 30 groups of experimenters. Immediately after achieving platform stability at the orbital location at 341 degrees east, ESA performed the In-Orbit Tests. Most measurements were carried out in Belgium using terminals specially developed for this purpose. A summary of the test results is given.

Arbesser-Rastburg, Bertram↗

Planetary Protection Policy and Technology Developments for the Crewed Exploration of Mars

As part of planning for potential future crewed exploration of Mars, NASA is developing its planetary protection policy for crewed missions, building on concepts developed within the international space exploration community. COSPAR (The Committee on Space Research), together with participating space agencies, has over the last several years organized and held interdisciplinary meetings to consider next steps in addressing knowledge gaps for planetary protection for the first human missions to Mars. Beginning with these workshop discussions as a base, NASA has held follow-on planning activities to identify the necessary steps to be accomplished to close those knowledge gaps. Significant overlap was identified between the planetary protection needs, including; microbial monitoring requirements for crew health and medical systems; studies of the microbiome of the built environment; environmental control and life support system (ECLSS) venting and disinfection strategies; waste management, and; planetary surface operations. In many cases, efforts to mature exploration systems for Mars that are occurring in other technology domains can be leveraged with minor changes to address planetary protection gaps as well. In other cases, work planned for testing on ISS as an analog for Mars transit, or on the lunar surface as an analog for Mars surface operations, can be used to close gaps in current planetary protection capabilities. This presentation provides a status update on the findings of the COSPAR Meetings on this topic to date, together with NASA’s responses in terms of agency-level plans and activities.

James N Benardini↗

Computer aided system engineering for space construction

This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

Racheli, Ugo↗

Studies of Planet Formation using a Hybrid N-body + Planetesimal Code

The goal of our proposal was to use a hybrid multi-annulus planetesimal/n-body code to examine the planetesimal theory, one of the two main theories of planet formation. We developed this code to follow the evolution of numerous 1 m to 1 km planetesimals as they collide, merge, and grow into full-fledged planets. Our goal was to apply the code to several well-posed, topical problems in planet formation and to derive observational consequences of the models. We planned to construct detailed models to address two fundamental issues: 1) icy planets - models for icy planet formation will demonstrate how the physical properties of debris disks, including the Kuiper Belt in our solar system, depend on initial conditions and input physics; and 2) terrestrial planets - calculations following the evolution of 1-10 km planetesimals into Earth-mass planets and rings of dust will provide a better understanding of how terrestrial planets form and interact with their environment. During the past year, we made progress on each issue. Papers published in 2004 are summarized. Summaries of work to be completed during the first half of 2005 and work planned for the second half of 2005 are included.

Kenyon, Scott J.↗

Solidification under zero gravity: A Long Duration Exposure Facility (LDEF) experiment for an early space shuttle mission

Project planning for two series of simple experiments on the effect of zero gravity on the melting and freezing of metals and nonmetals is described. The experiments will be performed in the Long Duration Exposure Facility, and their purpose will be to study: (1) the general morphology of metals and nonmetals during solidification, (2) the location of ullage space (liquid-vapor interfaces), and (3) the magnitude of surface tension driven convection during solidification of metals and nonmetals. The preliminary design of the experiments is presented. Details of the investigative approach, experimental procedure, experimental hardware, data reduction and analysis, and anticipated results are given. In addition a work plan and cost analysis are provided.

Bailey, J. A.↗

Comparison of Measured and Calculated Dose Rates for Ring Injection Dump Exchange at Spallation Neutron Source

According to the accelerator operation plan, the beam-stop and the proton beam window (PBW) assemblies of the existing Ring Injection Dump RID are replaced with fresh assemblies, when they have reached their end-of-life. End of-life is determinate by the stainless-steel beam-stop window having accumulated 10 dpa radiation damage. The exchange process took place during facility maintenance period that started in March 2023. Each of the spent assembles were put into specially designed storage containers temporarily residing near the RID building.The spent beam-stop is predicted to be the part of highest activation that has been removed in Spallation Neutron Source (SNS). The exchange processes require good work planning to minimize radiation exposure to personal. For each exchange step the residual dose rate distribution is calculated and the peak values are identified. This paper gives some examples of calculated vs measured doses during beam-stop assembly exchange.

Popova, Irina I.↗

NASA ETM Modeling and Simulation Upper E Traffic Management Meeting December 2020

This is a slide set to be used as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of the past accomplishments, current project structure, and a simulation roadmap for planned work ahead.

NASA ETM modeling and simulation↗

Techno-Economic Analysis of Photovoltaics and Battery Storage for Maine [Slides]

Maine GEO was interested in a small-scale pilot using REopt to expand on previous resilience efforts and better understand the most useful information to gather from facilities to maximize the efficacy of the analysis. The pilot began with identification of three pilot facilities from the existing Maine Community Resilience Partnership (MCRP) cohort, selection of the facilities prioritizing: social vulnerability, community led planning work and commitment to ongoing work. The technical assistance focused on working with identified facilities to help scope the project and identify their goals and then provide technical specifications on optimal energy generation and storage strategies for each community. At the conclusion of the project, participating facilities received a REopt analysis report, including optimal generation and storage strategies to address identified goals and next steps and considerations for implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Offshore Wind Energy Validation Experiment Hierarchy

This paper provides a summary of planning work for experiments that will be necessary to address the long-term model validation needs required to meet offshore wind energy deployment goals. Conceptual experiments are identified and laid out in a validation hierarchy for both wind turbine and wind plant applications. Instrumentation needs that will be required for the offshore validation experiments to be impactful are then listed. The document concludes with a nominal vision for how these experiments can be accomplished.

17 WIND ENERGY↗

ETM: Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of industry's position on operation intent and negotiation strategies in ETM airspace, applications of that position as captured through use cases, and a simulation roadmap for NASA's planned work ahead into CY21.

Upper E↗

Advanced Perovskite Solar Cells and Modules

The “Advanced perovskite Cells and Modules” research project was the final agreement focused on enhancing perovskite solar cell (PSC) technologies funded by the US Department of Energy's Solar Energy Technologies Office. The project was designed to address three crucial areas in PSC development: stability, manufacturability, and efficiency. The project was then structured around three main tasks, each targeting one of these strategic goals. The team of experienced researchers in these materials worked collaboratively to address the targets outlined in the technical work plan. building on existing PSC research while also exploring promising new concepts arising in the field. An overview of each primary task is summarized below: Task 1 Stability: This first task, aims to identify material characteristics and metrics that can help predict the primary degradation mechanisms impacting PSC stability. This involved developing specific device tests based on hypotheses regarding mechanisms impacting stability, including fast failure procedures to speed up PSC development and improvement. Various strategies to enhance stability, like incorporating additives, post-treatments, novel contact materials etc. were developed using this fast feedback approach. The relationships between indoor and outdoor stresses were also validated. Task 2 Manufacturability: This second task, focused on creating a scalable production process for PSCs. Initially the objective is to establish a best-known method for a 182 cm2 minimodule. However, given resource limitations, these metrics were modified to focus on the other goal of outlined in the TWP. Specifically, this task worked to demonstrate the transferability of this best-known method to another research institution. Work scope in this area was expanded to material purity and understanding of reagent/process relationships. Examination of other difficulties in PSC production and potential solutions for large-scale production were also evaluated. Given challenges observed in process transfer, work to develop data infrastructure and recording tools for processing of material and devices was then also prioritized in this task. Task 3 Efficiency: This task was focused on improvements to PCE, while still considering Task 1 and Task 2 goal. The efforts targeted a PCE greater than 22% with a T95 exceeding 1000 hours at 25°C in a nitrogen environment for lab-scale devices (approximately 0.1 cm2 devices) across a range of solar-relevant perovskite compositions, including wide-gap (around 1.7 eV) and low-gap (around 1.3 eV) materials, using standard metal contacts. This work then provides a foundation for MHP-based tandem efforts undertaken in other projects and the All-MHP tandem efforts outlined in this projects TWP. Work in this project emphasized disseminating its findings through peer-reviewed publications (PRP), conference presentations, and industrial collaborations. Significant products were produced in all these areas, over 53 peer reviewed publications, 32 conference presentations and industrial investment based on NLR assistance on precompetitive challenges. The team also developed significant intellectual property and awards for their technical excellence, innovations and leadership. The team also leveraged traditional and social media platforms to engage with stakeholders and the public.

14 SOLAR ENERGY↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a recap of the group's history and road ahead, a discussion of industry's initial position on, 'Industry principles for ETM rules of the road: Conflict identification and resolution,' and a simulation roadmap for planned work ahead.

Upper E↗