Search NASA⌕ Search

SEARCH · Search NASA

Results for “audit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

Post-Challenger evaluation of space shuttle risk assessment and management

As the shock of the Space Shuttle Challenger accident began to subside, NASA initiated a wide range of actions designed to ensure greater safety in various aspects of the Shuttle system and an improved focus on safety throughout the National Space Transportation System (NSTS) Program. Certain specific features of the NASA safety process are examined: the Critical Items List (CIL) and the NASA review of the Shuttle primary and backup units whose failure might result in the loss of life, the Shuttle vehicle, or the mission; the failure modes and effects analyses (FMEA); and the hazard analysis and their review. The conception of modern risk management, including the essential element of objective risk assessment is described and it is contrasted with NASA's safety process in general terms. The discussion, findings, and recommendations regarding particular aspects of the NASA STS safety assurance process are reported. The 11 subsections each deal with a different aspect of the process. The main lessons learned by SCRHAAC in the course of the audit are summarized.

Source record↗

Nuclear reactor power as applied to a space-based radar mission

The SP-100 Project was established to develop and demonstrate feasibility of a space reactor power system (SRPS) at power levels of 10's of kilowatts to a megawatt. To help determine systems requirements for the SRPS, a mission and spacecraft were examined which utilize this power system for a space-based radar to observe moving objects. Aspects of the mission and spacecraft bearing on the power system were the primary objectives of this study; performance of the radar itself was not within the scope. The study was carried out by the Systems Design Audit Team of the SP-100 Project.

Jaffe, L.↗

Alternate space station freedom configuration considerations to accommodate solar dynamic power

The results of a technical audit of the Space Station Freedom Program conducted by the Program Director was announced in early 1989 and included a proposal to use solar dynamic power generation systems to provide primary electrical energy for orbital flight operations rather than photovoltaic solar array systems. To generate the current program baseline power of 75 kW, two or more solar concentrators approximately 50 feet in diameter would be required to replace four pairs of solar arrays whose rectangular blanket size is approximately 200 feet by 30 feet. The photovoltaic power system concept uses solar arrays to generate electricity that is stored in nickel-hydrogen batteries. The proposed concept uses the solar concentrator dishes to reflect and focus the Sun's energy to heat helium-xenon gas to drive electricity generating turbines. The purpose here is to consider the station configuration issues for incorporation of solar dynamic power system components. Key flight dynamic configuration geometry issues are addressed and an assembly sequence scenario is developed.

Deryder, L. J.↗

A model of security monitoring

A model of security monitoring is presented that distinguishes between two types of logging and auditing. Implications for the design and use of security monitoring mechanisms are drawn from this model. The usefulness of the model is then demonstrated by analyzing several different monitoring mechanisms.

Bishop, Matt↗

Aeropropulsion facilities configuration control: Procedures manual

Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

Lavelle, James J.↗

Software quality assurance plan for GCS

The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

Duncan, Stephen E.↗

Space Station Freedom - Status of the U.S. segment

An overview of the Space Station Freedom program is given. The results of a technical audit of the U.S. program, and the reorganization taking place at NASA HQ are discussed. Some areas resolved in the past year such as the type of power to be delivered to each pressurized module and the definition of common payload interfaces within all modules are reviewed. The utility of the Space Station Freedom is emphasized.

Bartoe, John David F.↗

A model of security monitoring

A model of security monitoring is presented that distinguishes between two types of logging and auditing. Implications for the design and use of security monitoring mechanisms are drawn from this model. The usefulness of the model is then demonstrated by analyzing several different monitoring mechanisms.

Bishop, Matt↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

Evaluation of advanced microelectronics for inclusion in MIL-STD-975

The approach taken by NASA and JPL (Jet Propulsion Laboratory) in the development of a MIL-STD-975 section which contains advanced technology such as Large Scale Integration and Very Large Scale Integration (LSI/VLSI) microelectronic devices is described. The parts listed in this section are recommended as satisfactory for NASA flight applications, in the absence of alternate qualified devices, based on satisfactory results of a vendor capability audit, the availability of sufficient characterization and reliability data from the manufacturers and users and negotiated detail procurement specifications. The criteria used in the selection and evaluation of the vendors and candidate parts, the preparation of procurement specifications, and the status of this activity are discussed.

Scott, W. Richard↗

Improving software quality - The use of formal inspections at the Jet Propulsion Laboratory

The introduction of software formal inspections (Fagan Inspections) at JPL for finding and fixing defects early in the software development life cycle are reviewed. It is estimated that, by the year 2000, some software efforts will rise to as much as 80 percent of the total. Software problems are especially important at NASA as critical flight software must be error-free. It is shown that formal inspections are particularly effective at finding and removing defects having to do with clarity, correctness, consistency, and completeness. A very significant discovery was that code audits were not as effective at finding defects as code inspections.

Bush, Marilyn↗

Aging commuter aeroplanes: Fatigue evaluation and control methods

The risks associated with old aeroplanes arise in the main from the difficulty of obtaining support from the manufacturer and other skilled people, and from a general loss of reliability caused by wear and other deterioration. The loss of reliability is caused by two broad classes of problem. There are those problems which are self evident, and hazardous rather than catastrophic. These are the problem areas where characteristically there have been multiple overhauls, repairs, and replacements, and where aging really means the results of repair ineffectiveness that accumulates. The other class of problem is the insidious and potentially catastrophic class. It includes the progressive deterioration of items which are not maintained, and often cannot be maintained because the deterioration cannot be seen. It includes loss of physical properties in adhesives and other organic compounds, corrosion, and the response to repeated loads. This paper deals with a currently unnecessarily troublesome aspect of that response. The present working definition of "commuter aeroplanes" encompasses a wide range of aging types, from the Fairchild F27, through deHavilland Canada Twin Otters to the smaller twin engined Piper and Cessna models. It includes such types as the Lockheed 10, the Beech 18, and the Grumman Mallard. Although we must remain concerned about those types which have been certificated under a design standard or operational rule which embodies the elementary fail-safe concept and which have not been subjected to a subsequent structural audit, this paper is directed, in the first instance, towards types for which fatigue and damage tolerance evaluation was not required as a condition of certification. It will be seen, however, that the principles are robust enough for more general application.

Aging Aircraft↗

Teamwork for Oversight of Processes and Systems (TOPS). Implementation guide for TOPS version 2.0, 10 August 1992

As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.

Strand, Albert A.↗

AXAF FITS standard for ray trace interchange

A standard data format for the archival and transport of x-ray events generated by ray trace models is described. Upon review and acceptance by the Advanced X-ray Astrophysics Facility (AXAF) Software Systems Working Group (SSWG), this standard shall become the official AXAF data format for ray trace events. The Flexible Image Transport System (FITS) is well suited for the purposes of the standard and was selected to be the basis of the standard. FITS is both flexible and efficient and is also widely used within the astronomical community for storage and transfer of data. In addition, software to read and write FITS format files are widely available. In selecting quantities to be included within the ray trace standard, the AXAF Mission Support team, Science Instruments team, and the other contractor teams were surveyed. From the results of this survey, the following requirements were established: (1) for the scientific needs, each photon should have associated with it: position, direction, energy, and statistical weight; the standard must also accommodate path length (relative phase), and polarization. (2) a unique photon identifier is necessary for bookkeeping purposes; (3) a log of individuals, organizations, and software packages that have modified the data must be maintained in order to create an audit trail; (4) a mechanism for extensions to the basic kernel should be provided; and (5) the ray trace standard should integrate with future AXAF data product standards.

Hsieh, Paul F.↗

ACTS data center

Viewgraphs on ACTS Data Center status report are included. Topics covered include: ACTS Data Center Functions; data flow overview; PPD flow; RAW data flow; data compression; PPD distribution; RAW Data Archival; PPD Audit; and data analysis.

Syed, Ali↗

Universal first-order reliability concept applied to semistatic structures

A reliability design concept was developed for semistatic structures which combines the prevailing deterministic method with the first-order reliability method. The proposed method surmounts deterministic deficiencies in providing uniformly reliable structures and improved safety audits. It supports risk analyses and reliability selection criterion. The method provides a reliability design factor derived from the reliability criterion which is analogous to the current safety factor for sizing structures and verifying reliability response. The universal first-order reliability method should also be applicable for air and surface vehicles semistatic structures.

Verderaime, V.↗

Annual report to the Chairman and Ranking Minority Members, House and Senate Committees on Appropriations. Status of open recommendations: Improving operations of federal departments and agencies

Each year, GAO's work contributes to many legislative and executive branch actions that result in significant financial savings and other improvements in government operations. Some, but not all, are identified through GAO's system for periodically following up to determine the status of actions taken on the recommendations made in its audit and evaluation reports. In fiscal year 1994, GAO made 1,450 recommendations, but, more importantly, about 4,400 GAO recommendations made over the past 5 years have been implemented. This report includes summary information on the status of all GAO recommendations that have not been fully implemented and highlights some of the key ones. This information should help congressional and agency leaders prepare for upcoming appropriations and oversight activities and stimulate further actions to achieve the desired improvements in government operations. In addition to including printed issue area summaries highlighting the ipact of GAO's work and the key open recommendations, this volume includes a set of computer diskettes with details on all open recommendations.

Source record↗