Search NASA⌕ Search

SEARCH · Search NASA

Results for “auditing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

NM 502 Road Safety Audit Report

The Texas A&M Transportation Institute (TTI) and the Los Alamos National Laboratory - Parking and Transportation Services (LANL) have been working in close collaboration to seek solutions for parking, traffic operations, traffic safety, and transit issues facing LANL. NM 502 is a main route for employee traffic entering the lab as well as traffic in and out of the Los Alamos Townsite. The section of roadway in the vicinity of Camino Entrada is of particular interest as it was the site of two very serious crashes involving the extended LANL family, and it is also the entry point onto NM 502 for Los Alamos County Operations to include the school district and transit vehicles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INFORMATION: Audit Report on The Office of Secure Transportation DC-9 Aircraft Refurbishment

The National Nuclear Security Administration's (NNSA) Office of Secure Transportation (OST) maintains a fleet of seven aircraft to transport sensitive items, equipment and security personnel. Based on increasing requirements for transporting components and security personnel, OST decided to add a heavy transport aircraft to meet the Department's weapons surety and emergency response missions. In 2004, as a replacement following the sale of a portion of its fleet, OST acquired a DC-9 cargo aircraft that had been excessed by the U.S. military. Prior to integrating the DC-9 into its fleet, NNSA ordered a refurbishment of the aircraft. This refurbishment project was to permit the aircraft to be certified to civil air standards so that it could transport passengers for site visits, training and other travel. The NNSA Service Center (Service Center) awarded a contract for the refurbishment of the aircraft in December 2004. In recent years, the Office of Inspector General has addressed a number of issues relating to the Department's aircraft management activities and services. As part of our ongoing review process and because of the national security importance of its fleet of aircraft, we conducted this review to determine whether OST had an effective and efficient aviation management program.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Audit Report "Department of Energy Efforts to Manage Information Technology Resources in an Energy-Efficient and Environmentally Responsible Manner"

The American Recovery and Reinvestment Act of 2009 emphasizes energy efficiency and conservation as critical to the Nation's economic vitality; its goal of reducing dependence on foreign energy sources; and, related efforts to improve the environment. The Act highlights the significant use of various forms of energy in the Federal sector and promotes efforts to improve the energy efficiency of Federal operations. One specific area of interest is the increasing demand for Federal sector computing resources and the corresponding increase in energy use, with both cost and environmental implications. The U.S. Environmental Protection Agency reported that, without aggressive conservation measures, data center energy consumption alone is expected to double over the next five years. In our report on Management of the Department's Data Centers at Contractor Sites (DOE/IG-0803, October 2008) we concluded that the Department of Energy had not always improved the efficiency of its contractor data centers even when such modifications were possible and practical. Despite its recognized energy conservation leadership role, the Department had not always taken advantage of opportunities to reduce energy consumption associated with its information technology resources. Nor, had it ensured that resources were managed in a way that minimized impact on the environment. In particular: (1) The seven Federal and contractor sites included in our review had not fully reduced energy consumption through implementation of power management settings on their desktop and laptop computers; and, as a consequence, spent $1.6 million more on energy costs than necessary in Fiscal Year 2008; (2) None of the sites reviewed had taken advantage of opportunities to reduce energy consumption, enhance cyber security, and reduce costs available through the use of techniques, such as 'thin-client computing' in their unclassified environments; and, (3) Sites had not always taken the necessary steps to reduce energy consumption and resource usage of their data centers, such as identifying and monitoring the amount of energy used at their facilities. We concluded that Headquarters programs offices (which are part of the Department of Energy's Common Operating Environment) as well as field sites had not developed and/or implemented policies and procedures necessary to ensure that information technology equipment and supporting infrastructure was operated in an energy-efficient manner and in a way that minimized impact on the environment. For example, although required by the Department, sites had not enabled computer equipment power management features designed to reduce energy consumption. In addition, officials within Headquarters programs and at the sites reviewed had not effectively monitored performance or taken steps to fully evaluate available reductions in energy usage at their facilities. Without improvements, the Department will not be able to take advantage of opportunities to reduce energy consumption and realize cost savings of nearly $23 million over the next five years at just the seven sites reviewed. We noted that the potential for reduced energy consumption at these sites alone was equivalent to the annual power requirements of over 2,400 homes or, alternatively, removing about 3,000 cars from the road each year. Many of the available energy reduction strategies, such as fully utilizing energy-efficient settings on the many computers used by the Department and its contractors, are 'low hanging fruit' in that they will provide immediate tangible energy savings at little or no cost. Others, such as a shift to thin-client computing, an environment that transfers the processing capabilities from an individual's desk to a shared server environment, will require some level of investment which can, based on available literature, be successfully recovered through reduced acquisition and support costs. In our judgment, given its highly visible leadership in energy issues, aggressive action should be taken to make the Department's information technology operations as energy efficient as possible so that it can serve as a role model for both the Federal and private sector. To its credit, the Department had increased the number of energy-efficient computers purchased in recent years. In addition, the Office of the Chief Information Officer implemented an automated computer shutdown program at Headquarters that was estimated to save up to nearly $400,000 per year. Furthermore, we found that certain sites had initiated actions to review a potential transition to unclassified thin-client computing; however, implementation had not yet been completed. These are positive steps, but additional action is required, and our report contains several recommendations to this end.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audit Report "The Department of Energy's Loan Guarantee Program for Innovative Energy Technologies"

The Energy Policy Act of 2005 authorized the Department of Energy to guarantee loans for new or significantly improved energy production technologies that avoid, reduce, or sequester air pollutants and other greenhouse gases. As of December 2008, Congress authorized the Department to make $42.5 billion in loan guarantees to support innovative energy projects. These guarantees were authorized for up to 80% of the total project costs and were designed to promote the commercial use of innovative technologies. Under the terms of the Act, the loan guarantees are contingent upon reasonable prospect of repayment by the borrower. Consistent with the Energy Policy Act, the Department is responsible for soliciting and evaluating loan applications, approving loan guarantees, and monitoring project and loan guarantee performance. through December 2008, the Department had issued five solicitations for projects that support innovative clean coal technologies, energy efficiency, renewable energy, advanced electricity transmission and distribution, and nuclear and fossil energy projects. These solicitations were issued in three phases with the first in August 2006, and the final in September 2008. Eleven substantially complete applications requesting approximately $8.2 billion in loan guarantees had been received by the Department in response to the first solicitation. The Department had begun the review of applications and was in the process of completing due diligence procedures necessary to evaluate projects received in response to the first solicitation. Under current plans, the Department is to issue its first loan guarantees in the spring of 2009. Because of the importance of this program as part of an effort to address the Nation's most challenging and pressing energy needs; and, the potential risk of loss to the United States taxpayers should default occur, we initiated this review to evaluate the Department's progress in establishing internal and operational controls over its Loan Guarantee Program.

01 COAL, LIGNITE, AND PEAT↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

Internal Audit of a Comprehensive IMRT Program for Prostate Cancer: A Model for Centers in Developing Countries?

Purpose: With improving regional prosperity, significant capital investments have been made to rapidly expand radiotherapy capacity across Southeast Asia. Yet little has been reported on the implementation of adequate quality assurance (QA) in patient management. The objective of this study is to perform an in-depth QA assessment of our definitive intensity-modulated radiotherapy (IMRT) program for prostate cancer since its inception. Methods and Materials: The department's prostate IMRT program was modeled after that of University of California San Francisco. A departmental protocol consisting of radiotherapy volume/dose and hormone sequencing/duration and a set of 18 dose objectives to the target and critical organs were developed, and all plans were presented at the weekly departmental QA rounds. All patients treated with definitive IMRT for nonmetastatic prostate cancer were retrospectively reviewed. Protocol adherence, dosimetry data, toxicities, and outcomes were evaluated. Results: Since 2005, 76 patients received IMRT: 54 with whole-pelvis and 22 with prostate-only treatment. Of the 1,140 recorded dosimetric end points, 39 (3.3%) did not meet the protocol criteria. At QA rounds, no plans required a revision. Only one major protocol violation was observed. Two and two cases of Grade 3-4 acute and late toxicities, respectively, were observed. Five (8.8%) patients developed proctitis, but only one required argon laser therapy. Conclusions: Our comprehensive, practice-adapted QA measures appeared to ensure that we were able to consistently generate conforming IMRT plans with acceptable toxicities. These measures can be easily integrated into other clinics contemplating on developing such a program.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Feature Engineering and Ensemble Methods for Imbalanced ICS Intrusion Detection: Pipeline Audit and Constrained Evaluation

Industries are becoming increasingly connected and are more vulnerable to cyberattacks due to the widened attack surface. Industrial Control Systems (ICS) are among the most critical sectors that malicious actors can target, as such attacks can cause significant operational disruption and physical damage. It is imperative to detect such attacks as early as possible. This paper evaluates constraint-conditioned optimistic performance estimates for traditional ML models in ICS intrusion detection (i.e., estimates obtained under contiguous, non-shuffled temporal evaluation without test-set alteration, but with pre-split feature engineering that may introduce temporal leakage, due to dataset constraints). Our findings are threefold. First, we quantify how iterative feature engineering affects tree-based ensemble performance and examine how pipeline decisions (split strategy, sampling scope, and cleaning policy) can inflate or reduce reported IDS results under constraint-bound evaluation. Second, we compare intrinsic class-imbalance handling across ensemble models. Third, under our current pipeline constraints (including pre-split feature engineering), CatBoost achieves the best performance on Water Storage Tank (accuracy: 0.9831, class-1 F1: 0.9682), while Light- GBM achieves the best performance on Gas Pipeline (accuracy: 0.9618, class-1 F1: 0.9086).

97 MATHEMATICS AND COMPUTING↗

Patient radiation dose audits for fluoroscopically guided interventional procedures

Purpose: Quality management for any use of medical x-ray imaging should include monitoring of radiation dose. Fluoroscopically guided interventional (FGI) procedures are inherently clinically variable and have the potential for inducing deterministic injuries in patients. The use of a conventional diagnostic reference level is not appropriate for FGI procedures. A similar but more detailed quality process for management of radiation dose in FGI procedures is described. Methods: A method that takes into account both the inherent variability of FGI procedures and the risk of deterministic injuries from these procedures is suggested. The substantial radiation dose level (SRDL) is an absolute action level (with regard to patient follow-up) below which skin injury is highly unlikely and above which skin injury is possible. The quality process for FGI procedures collects data from all instances of a given procedure from a number of facilities into an advisory data set (ADS). An individual facility collects a facility data set (FDS) comprised of all instances of the same procedure at that facility. The individual FDS is then compared to the multifacility ADS with regard to the overall shape of the dose distributions and the percent of instances in both the ADS and the FDS that exceed the SRDL. Results: Samples of an ADS and FDS for percutaneous coronary intervention, using the dose metric of reference air kerma (K{sub a,r}) (i.e., the cumulative air kerma at the reference point), are used to illustrate the proposed quality process for FGI procedures. Investigation is warranted whenever the FDS is noticeably different from the ADS for the specific FGI procedure and particularly in two circumstances: (1) When the facility's local median K{sub a,r} exceeds the 75th percentile of the ADS and (2) when the percent of instances where K{sub a,r} exceeds the facility-selected SRDL is greater for the FDS than for the ADS. Conclusions: Analysis of the two data sets (ADS and FDS) and of the percent of instances that exceed the SRDL provides a means for the facility to better manage radiation dose (and therefore both deterministic and stochastic radiation risk) to the patient during FGI procedures.

60 APPLIED LIFE SCIENCES↗

SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System.

60 APPLIED LIFE SCIENCES↗

WE-A-BRC-03: Lessons Learned: IROC Audits

Quality and safety in healthcare are inextricably linked. There are compelling data that link poor quality radiation therapy to inferior patient survival. Radiation Oncology clinical trial protocol deviations often involve incorrect target volume delineation or dosing, akin to radiotherapy incidents which also often involve partial geometric miss or improper radiation dosing. When patients with radiation protocol variations are compared to those without significant protocol variations, clinical outcome is negatively impacted. Traditionally, quality assurance in radiation oncology has been driven largely by new technological advances, and safety improvement has been driven by reactive responses to past system failures and prescriptive mandates recommended by professional organizations and promulgated by regulators. Prescriptive approaches to quality and safety alone often do not address the huge variety of process and technique used in radiation oncology. Risk-based assessments of radiotherapy processes provide a mechanism to enhance quality and safety, both for new and for established techniques. It is imperative that we explore such a paradigm shift at this time, when expectations from patients as well as providers are rising while available resources are falling. There is much we can learn from our past experiences to be applied towards the new risk-based assessments. Learning Objectives: Understand the impact of clinical and technical quality on outcomes Understand the importance of quality care in radiation oncology Learn to assess the impact of quality on clinical outcomes D. Followill, NIH Grant CA180803.

60 APPLIED LIFE SCIENCES↗

Compilation of Criteria and Summaries from B332 Seismic Evaluations for the Initial Scoping Document Release of the HS-45 LLNL Audit, February 7, 2013

This study consists of separate evaluations of Increment I, Increment III and the Plenum Building. The analysis was limited to the structural components of these structures and did not include architectural features, components nor mechanical or electrical equipment or systems. The seismic analysis was an elastic dynamic analysis following the UCRL-15910 guidelines.

58 GEOSCIENCES↗

Increasing Energy Efficiency and Reducing Emissions from China's Cement Kilns. Audit Report of Two Cement Plants in Shandong Province, China

The study documented in this report was initiated in order to conduct an energy assessment and to identify the relationship between combustion issues and emissions from cement kilns. A new suspension preheater/precalciner (NSP) rotary cement kiln at one cement manufacturing facility (referred to as Shui Ni 1 in this report) and a vertical shaft kiln (VSK) at another cement manufacturing facility (referred to as Shui Ni 2 in this report), which are both in Shandong Province, were selected to conduct the energy and emission assessments through collection of data. Based on analysis of the data collected during this assessment, several actions are suggested that could lead to reduction in coal use and reduction in emission of gaseous pollutants from the system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗