Search NASA⌕ Search

SEARCH · Search NASA

Results for “cable systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Leading/lagging cable referencing platform for monitoring the health of underground cable networks

A system for detecting water trees in branching underground electrical cables includes a pulse generator configured to inject a pulse into a first underground cable that branches into a second underground cable and a third underground cable. The system includes a first sensor associated with the first cable, a second sensor associated with the second cable, and a third sensor associated with the third cable. The system includes a control device configured to obtain a first, second, and third signal associated with the first, second and third sensors, respectively. The control device determines a lead-lag relationship between the second and third signals and determines presence of a water tree within at least one of the second and third cable based on the lead-lag relationship. When presence of a water tree is determined, the control device generates a control action associated with repairing or replacing the second and/or third cable.

Burkes, Klaehn W.↗

Power transmission cable development for the Space Station Freedom electrical power system

Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

Schmitz, Gregory V.↗

Connected Lighting Systems Efficiency Study - PoE Cable Energy Losses, Part 1 [Revised]

First report in a study of the efficiency of connected lighting systems. The report summarizes the results of an exploratory study investigating power losses in Ethernet cables used between PoE switches and luminaires in PoE connected lighting systems. Testing was conducted at the Pacific Northwest National Laboratory (PNNL) Connected Lighting Test Bed in September 2017. The results were analyzed to explore the impact of cable selection on PoE lighting system energy efficiency, as well as the effectiveness of guidelines recently introduced by the American National Standards Institute (ANSI) C137 Lighting Systems Committee.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Material selection and evaluation of new encapsulation compounds for electric cables for launch support system

Eight urethane compounds were evaluated as possible replacement for the existing encapsulating compoounds for electrical cables for the Launch Support System at Kennedy Space Center (KSC). The existing encapsulating compound, PR-1535, contains the curative MOCA 4-4'-Methylene-BIS (2-chloroaniline), which is a suspect carcinogen and hence may be the subject of further restrictions of its use by the Occupational Safety and Health Administration (OSHA). The samples made in the configuration of cable joints and in the form of disks were evaluated for flammability and hypergolic compatibility. These also underwent accelerated weatherability tests that measured the residual hardness of the exposed samples. Three candidates and the existing compound passed the hardness test. Of these, only one candidate and the existing compound passed the flammability test. The thermal and hydrolytic stability (weatherability) of these samples was studied using thermogravimetric analysis (DSC) techniques. The TMA and DSC data correlated with the residual hardness data; whereas, the TGA data showed no correlation. A hypergolic compatibility test will be conducted on the compound V-356-HE80, which passed both the flammability and accelerated weatherability tests.

Ray, Asit K.↗

Real-time demonstration hardware for enhanced DPCM video compression algorithm

The lack of available wideband digital links as well as the complexity of implementation of bandwidth efficient digital video CODECs (encoder/decoder) has worked to keep the cost of digital television transmission too high to compete with analog methods. Terrestrial and satellite video service providers, however, are now recognizing the potential gains that digital video compression offers and are proposing to incorporate compression systems to increase the number of available program channels. NASA is similarly recognizing the benefits of and trend toward digital video compression techniques for transmission of high quality video from space and therefore, has developed a digital television bandwidth compression algorithm to process standard National Television Systems Committee (NTSC) composite color television signals. The algorithm is based on differential pulse code modulation (DPCM), but additionally utilizes a non-adaptive predictor, non-uniform quantizer and multilevel Huffman coder to reduce the data rate substantially below that achievable with straight DPCM. The non-adaptive predictor and multilevel Huffman coder combine to set this technique apart from other DPCM encoding algorithms. All processing is done on a intra-field basis to prevent motion degradation and minimize hardware complexity. Computer simulations have shown the algorithm will produce broadcast quality reconstructed video at an average transmission rate of 1.8 bits/pixel. Hardware implementation of the DPCM circuit, non-adaptive predictor and non-uniform quantizer has been completed, providing realtime demonstration of the image quality at full video rates. Video sampling/reconstruction circuits have also been constructed to accomplish the analog video processing necessary for the real-time demonstration. Performance results for the completed hardware compare favorably with simulation results. Hardware implementation of the multilevel Huffman encoder/decoder is currently under development along with implementation of a buffer control algorithm to accommodate the variable data rate output of the multilevel Huffman encoder. A video CODEC of this type could be used to compress NTSC color television signals where high quality reconstruction is desirable (e.g., Space Station video transmission, transmission direct-to-the-home via direct broadcast satellite systems or cable television distribution to system headends and direct-to-the-home).

Bizon, Thomas P.↗

Lunar surface structural concepts and construction studies

The topics are presented in viewgraph form and include the following: lunar surface structures construction research areas; lunar crane related disciplines; shortcomings of typical mobile crane in lunar base applications; candidate crane cable suspension systems; NIST six-cable suspension crane; numerical example of natural frequency; the incorporation of two new features for improved performance of the counter-balanced actively-controlled lunar crane; lunar crane pendulum mechanics; simulation results; 1/6 scale lunar crane testbed using GE robot for global manipulation; basic deployable truss approaches; bi-pantograph elevator platform; comparison of elevator platforms; perspective of bi-pantograph beam; bi-pantograph synchronously deployable tower/beam; lunar module off-loading concept; module off-loader concept packaged; starburst deployable precision reflector; 3-ring reflector deployment scheme; cross-section of packaged starburst reflector; and focal point and thickness packaging considerations.

Mikulas, Martin↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

Gill, Tracy↗

Systems and methods for assessing cable insulation

Methods for assessing cable insulation are provided that can include engaging a first tine gap interdigital capacitor assembly with the exterior of the cable jacket to determine a first capacitance and dissipation factor value of the insulation using the first tine gap interdigital capacitor assembly; engaging a second tine gap interdigital capacitor assembly with the exterior of the cable jacket to determine a second capacitance and dissipation factor value of the insulation using the second tine gap interdigital capacitor assembly.Systems for assessing cable insulation are also provided. The systems can include a cable jacket encompassing cable insulation and conductive material; at least two tine gap interdigital capacitor assemblies engaged with the cable jacket; and processing circuitry operatively engaged with the capacitor assemblies.

Glass, III, Samuel W.↗

Connected Lighting Systems Efficiency Study: PoE Cable Energy Losses, Part 2

Power over Ethernet (PoE) technology offers the ability to provide both low-voltage direct current (DC) power and communication over a standard Ethernet cable—also referred to as a local area network (LAN) cable or Category cable. Light-emitting diode (LED) technology has reduced the power required for lighting applications, while advances in PoE standards and technology have yielded substantial increases in the amount of power that can be delivered to a networked device over a single cable. As a result, PoE technology is emerging in lighting and many other applications beyond its historical foothold in telephony and networking equipment. Several major LED luminaire manufacturers have introduced PoE connected lighting systems in recent years, making this a potentially disruptive technology. PoE lighting systems can offer improved efficiency relative to traditional line voltage alternating current (AC) systems, because AC-DC power conversion losses can be reduced if this work is consolidated among one or more PoE switches, rather than being distributed among a greater number of smaller LED drivers. However, this effect can be offset to some extent by increased losses associated with an increased voltage drop in the low-voltage Ethernet cabling. In fact, these losses could exceed 15% in poorly designed systems. Aspects of cable design that can affect cable energy performance include American Wire Gauge (AWG), Category (e.g., 5e), shielding, and fire rating (e.g., CMP). Installation practices (e.g., bending, bundling, conduit) can also affect cable performance. Although cable energy losses can be predicted with knowledge of conductor DC resistance (DCR), and DCR can be estimated based on rated AWG, most product datasheets state maximum DCR - or reference standards that specify DCR limits - in lieu of nominal DCR.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smart monitoring system based on adaptive current control for superconducting cable test

A smart monitoring system for superconducting cable test is proposed with an adaptive current control of a superconducting transformer secondary. The design, based on Fuzzy Gain Scheduling, allows the controller parameters to adapt continuously, and finely, to the working variations arising from transformer nonlinear dynamics. The control system is integrated in a fully digital control loop, with all the related benefits, i.e., high noise rejection, ease of implementation/modification, and so on. In particular, an accurate model of the system, controlled by a Fuzzy Gain Scheduler of the superconducting transformer, was achieved by an experimental campaign through the working domain at several current ramp rates. The model performance was characterized by simulation, under all the main operating conditions, in order to guide the controller design. Finally, the proposed monitoring system was experimentally validated at European Organization for Nuclear Research (CERN) in comparison to the state-of-the-art control system [P. Arpaia, L. Bottura, G. Montenero, and S. Le Naour, “Performance improvement of a measurement station for superconducting cable test,” Rev. Sci. Instrum.83, 095111 (2012)] of the Facility for the Research on Superconducting Cables, achieving a significant performance improvement: a reduction in the system overshoot by 50%, with a related attenuation of the corresponding dynamic residual error (both absolute and RMS) up to 52%.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Connected Lighting Systems Efficiency Study: PoE Cable Energy Losses, Part 2

This is the second report of an investigation into energy losses in Ethernet cables used between Power over Ethernet (PoE) switches and luminaires in PoE connected lighting systems. Testing for Part 2 of the study was conducted in DOE’s Connected Lighting Test Bed in July and August 2018 and was a continuation of Part 1 studies conducted there in September 2017.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cable Diagnostic Focused Initiative

This report summarizes an extensive effort made to understand how to effectively use the various diagnostic technologies to establish the condition of medium voltage underground cable circuits. These circuits make up an extensive portion of the electric delivery infrastructure in the United States. Much of this infrastructure is old and experiencing unacceptable failure rates. By deploying efficient diagnostic testing programs, electric utilities can replace or repair circuits that are about to fail, providing an optimal approach to improving electric system reliability. This is an intrinsically complex topic. Underground cable systems are not homogeneous. Cable circuits often contain multiple branches with different cable designs and a range of insulation materials. In addition, each insulation material ages differently as a function of time, temperature and operating environment. To complicate matters further, there are a wide variety of diagnostic technologies available for assessing the condition of cable circuits with a diversity of claims about the effectiveness of each approach. As a result, the benefits of deploying cable diagnostic testing programs have been difficult to establish, leading many utilities to avoid the their use altogether. This project was designed to help address these issues. The information provided is the result of a collaborative effort between Georgia Tech NEETRAC staff, Georgia Tech academic faculty, electric utility industry participants, as well as cable system diagnostic testing service providers and test equipment providers. Report topics include: •How cable systems age and fail, •The various technologies available for detecting potential failure sites, •The advantages and disadvantages of different diagnostic technologies, •Different approaches for utilities to employ cable system diagnostics. The primary deliverables of this project are this report, a Cable Diagnostic Handbook (a subset of this report) and an online knowledge based system (KBS) that helps utilities select the most effective diagnostic technologies for a given cable circuit and circuit conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗