Test Protocols for Advanced Inverter Interoperability Functions – Main Document

Distributed energy resources (DER) such as photovoltaic (PV) systems, when deployed in a large scale, are capable of influencing significantly the operation of power systems. Looking to the future, stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. In 2009, the Electric Power Research Institute (EPRI), Sandia National Laboratories (SNL) with the U.S. Department of Energy (DOE), and the Solar Electric Power Association (SEPA) initiated a large industry collaborative to identify and standardize definitions for a set of DER grid support functions. While the initial effort concentrated on grid-tied PV inverters and energy storage systems, the concepts have applicability to all DER. A partial product of this on-going effort is a reference definitions document (IEC TR 61850-90-7, Object models for power converters in distributed energy resources (DER) systems) that has become a basis for expansion of related International Electrotechnical Commission (IEC) standards, and is supported by US National Institute of Standards and Technology (NIST) Smart Grid Interoperability Panel (SGIP). Some industry-led organizations advancing communications protocols have also embraced this work. As standards continue to evolve, it is necessary to develop test protocols to independently verify that the inverters are properly executing the advanced functions. Interoperability is assured by establishing common definitions for the functions and a method to test compliance with operational requirements. This document describes test protocols developed by SNL to evaluate the electrical performance and operational capabilities of PV inverters and energy storage, as described in IEC TR 61850-90-7. While many of these functions are not currently required by existing grid codes or may not be widely available commercially, the industry is rapidly moving in that direction. Interoperability issues are already apparent as some of these inverter capabilities are being incorporated in large demonstration and commercial projects. The test protocols are intended to be used to verify acceptable performance of inverters within the standard framework described in IEC TR 61850-90-7. These test protocols, as they are refined and validated over time, can become precursors for future certification test procedures for DER advanced grid support functions.

14 SOLAR ENERGY↗

Implementing Zero Energy Design with the U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high performance buildings that push the boundaries of the industry. In the 2020 competition, DOE is piloting Design Partners, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Challenge, Design Partners receive a zero energy alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment and provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. Attendees will leave understanding the “perfect storm” of policy, technology, health, and economic trends that make zero energy buildings desirable and feasible and the value of the U.S. DOE Solar Decathlon to industry. They will also get a sneak peek at innovative solutions 2020 Design Partner pilot projects are bringing to the building industry and how becoming a Design Partner in 2021 could benefit their organization.

30 DIRECT ENERGY CONVERSION↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy (DOE) Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high-performance buildings that push the boundaries of the industry. In the 2020 Design Challenge, DOE piloted the Design Partners Program, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Design Challenge, Design Partners receive a zero-energy design alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment. It also provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. This article summarizes the current policy, technology, health, and economic trends that make zero energy buildings desirable and feasible, and presents the value of the Solar Decathlon to industry. We highlight innovative solutions 2020 Design Partner pilot projects are bringing to the building industry.

30 DIRECT ENERGY CONVERSION↗

Design of water-moderated heterogeneous cores in new STACY facility through JAEA/IRSN collaboration - 14363

In the post-Fukushima prospect, Japan Atomic Energy Agency, JAEA, intends to re-open its Static Experiment Critical Facility STACY, in order to contribute to the validation of fuel debris calculations in conditions close to those affected by the Fukushima Daiichi Nuclear Power Station accident. The reactor core of STACY is being modified by JAEA from homogeneous solution fuel core to heterogeneous pin- type fuel core. The first step of critical experiments is to establish reference experiments involving lattices of UO{sub 2} rods without fuel debris. A design of such experiments is in progress for the widest range of moderation ratios in the frame of JAEA/IRSN collaboration. To anticipate the specification values of materials to be manufactured (grids, rods), an evaluation of uncertainties pertaining to the different parameters driving k{sub eff} is paramount. The following uncertainties of experimental cores are evaluated to estimate the reactivity effect of engineering tolerance/or measurements of the modified STACY: (1) Density of fuel pellets, (2) Enrichment of uranium, (3) Diameter of fuel pellets, (4) Thickness of fuel claddings, (5) Impurities of fuel pellets, (6) Impurities of fuel claddings and (7) Positioning of fuel rods in the lattice. For these calculations, three types of moderation conditions were considered within the experimental parameters of STACY: the lowest moderation (lattice pitch = 1.15 cm; V{sub m}/V{sub f}=1.2), optimum moderation (lattice pitch = 1.5 cm, V{sub m}/V{sub f} = 2.9) and an over moderated case (lattice pitch = 2.55 cm; V{sub m}/V{sub f} = 11). The calculations to derive the overall uncertainty of modified STACY were performed propagating the 1σ uncertainties of parameters of existing STACY in terms of k{sub eff}. For that purpose, a perturbation calculation (differential operator) technique and a stochastic geometry modeling technique were used with the MCNP5 continuous energy Monte Carlo code and a point-wise cross section library based on the JENDL-4.0 evaluated nuclear data library. Moreover, the results of calculations were compared with those calculated by two continuous energy Monte Carlo codes using the correlated sampling technique: - An experimental version of the Japanese MVP2 code combined to the JENDL-4.0 nuclear data library, - The MORET 5 code, developed by IRSN, combined to the JEFF-3.1 nuclear data library. The proposed paper discusses all the aforementioned issues, and confirms that the uncertainty pertaining to the critical experiments of the STACY is sufficiently small. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Future Electric Power Industry and Grids—Now What Again is Our Destination?

Having a vision that others agree to support and work toward is highly desirable but hard to achieve. We seem to lack a common and shared understanding of the vision—or worse, multiple visions (vivid mental images or documented statements) with varying areas of focus and details: • some appear to be similar but have differing underlying goals and characteristics, or • some reflect differing viewpoints as to effects on various stakeholders. These desirable and undesirable situations apply to realizing visions for enterprise and industry, including the electricity sector. Multiple industry stakeholder groups have developed goals, industry vision statements, and characterizations of the future. The viewpoints are promoted, discussed, refined by their stakeholder group, and often published to promote broad understanding and to inform or influence others. The GridWise Architecture Council asked itself how well-aligned these characterizations of the future are. If these publications collectively set the overall direction for the industry, it is useful to identify their answers to questions such as, where is the electric industry headed, guided by what objectives, and with what role(s) for the customers, electric utilities, and other stakeholders? Are these goals, visions, and future states moving toward a common vision, do they provide value for the stakeholders, and are they likely to meet the objective stated? This paper addresses these questions via an assessment and characterization of a sampling of stakeholder groups’ publicly available vision and future state reports for the electricity industry. Identified electric power grid architectural topic areas needing further work are described, along with GridWise Architecture Council analysis and observation, potential collaborative work efforts, and suggested next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Energy Industries, Inc. SEGIS developments

The Solar Energy Grid Integration Systems (SEGIS) initiative is a three-year, three-stage project that includes conceptual design and market analysis (Stage 1), prototype development/testing (Stage 2), and commercialization (Stage 3). Projects focus on system development of solar technologies, expansion of intelligent renewable energy applications, and connecting large-scale photovoltaic (PV) installations into the electric grid. As documented in this report, Advanced Energy Industries, Inc. (AE), its partners, and Sandia National Laboratories (SNL) successfully collaborated to complete the final stage of the SEGIS initiative, which has guided new technology development and development of methodologies for unification of PV and smart-grid technologies. The combined team met all deliverables throughout the three-year program and commercialized a broad set of the developed technologies.

14 SOLAR ENERGY↗

Value Streams from Distribution Grid Support Using Utility-Scale Vanadium Redox Flow Battery: NREL-Sumitomo Electric Battery Demonstration Project

The National Renewable Energy Laboratory (NREL) collaborated with Sumitomo Electric to provide research support in modeling and optimally dispatching a utility-scale vanadium redox flow battery (VRFB) energy storage. The objective of the project was to identify value streams from using utility-scale VRFB for local grid support use-cases, including voltage regulation (droop), capacity firming, peak shaving and valley filling, and energy arbitrage. This project was also supported by San Diego Gas and Electric (SDGandE). SDGandE provided data and approval to operate their VRFB energy storage system on an SDGandE distribution feeder. NREL worked with Sumitomo Electric to evaluate optimal dispatch strategies to VRFB, analyze the technical impacts, and calculate the associated cost-benefit ratio of substation-level energy storage on an SDG&E distribution feeder. To support this research, NREL evaluated the impacts of the battery use cases suggested by Sumitomo on the SDGandE host feeder. In addition to evaluating the battery use case, this effort identified possible ways to monetize the benefits from distribution feeder support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Employing a User-Centered Design Process for Cybersecurity Awareness in the Power Grid

In this paper, we discuss the process we are using in the design and implementation of a tool to improve the situation awareness of cyberattacks in the power grid. We provide details on the steps we have taken to date and describe the steps that still need to be accomplished. The focus of this work is to provide situation awareness (SA) (Endsley, 1995) of the power grid to staff from different, non-overlapping roles in an electrical transmission organization in order to facilitate an understanding of a possible occurrence of a cyberattack. Our approach follows a user-centered design process and includes determining the types of information to display, the format of the displays, and the personnel to whom the display should be shown. Additionally there is the issue of how much help the tool can provide in the way of assessing the probability of a cyberattack given the current status of various portions of the power grid. Regardless, the ability to provide a common operating picture should enable the various groups to collaborate on a response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Cloud Optimized Day-Ahead Forecasting System Based on WRF-Solar (Final Report)

The most persistent challenge in both intraday and day-ahead solar forecasting is to get numerical weather prediction models to produce the right type of clouds with the right frequency at the right time and place. Another challenge is to understand and communicate the forecast uncertainty. The objective of this project was to develop an optimized ensemble-based solar irradiance forecasting system that will (1) demonstrably improve the current state-of-the-art solar forecasts from the deterministic Weather Research and Forecasting-Solar (WRF-Solar) model and (2) provide probabilistic forecasts for grid operations. This probabilistic solar forecasting system, referred to as the WRF-Solar Ensemble Prediction System (WRF-Solar EPS), aims to significantly enhance both the intraday and the day-ahead solar forecasting capability for grid operations. This technical report summarizes the work performed in the past 3 years through a collaboration between the National Renewable Energy Laboratory and the National Center for Atmospheric Research as part of the U.S. Department of Energy's Solar Forecasting 2 program that aims to improve the accuracy of solar energy forecasts and enable increased deployment of solar energy on the electric grid.

14 SOLAR ENERGY↗

Chefornak Energy Configuration Options: Energy Infrastructure Optimization to Reduce Fuel Cost and Dependence in Chefornak, Alaska

The U.S. Department of Energy is funding, through the Grid Modernization Program, the Alaska Microgrid Partnership (AMP), a multi-stakeholder collaborative comprised of national labs and Alaska based partners. The over-arching goal of AMP is to reduce the use of total imported fuel into communities to secure all energy services by at least 50% in Alaska's remote microgrids without increasing system lifecycle costs, while improving overall system reliability, security, and resilience. One goal of AMP is to investigate if a combination of Energy Efficiency (EE) and high contribution (from Renewable Energy (RE)) power systems can reduce total imported energy usage by 50% while lowering Life Cycle Costs (LCC) and improving reliability and resiliency. A techno-economic analysis was conducted for the community of Chefornak to investigate system architectures that could meet the goal of reducing imported fuel consumption by 50% or more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A National Collaboratory to Advance the Science of High Temperature Plasma Physics for Magnetic Fusion

This report summarizes the work of the National Fusion Collaboratory (NFC) Project to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. The original objective of the NFC project was to develop and deploy a national FES Grid (FusionGrid) that would be a system for secure sharing of computation, visualization, and data resources over the Internet. The goal of FusionGrid was to allow scientists at remote sites to participate as fully in experiments and computational activities as if they were working on site thereby creating a unified virtual organization of the geographically dispersed U.S. fusion community. The vision for FusionGrid was that experimental and simulation data, computer codes, analysis routines, visualization tools, and remote collaboration tools are to be thought of as network services. In this model, an application service provider (ASP provides and maintains software resources as well as the necessary hardware resources. The project would create a robust, user-friendly collaborative software environment and make it available to the US FES community. This Grid's resources would be protected by a shared security infrastructure including strong authentication to identify users and authorization to allow stakeholders to control their own resources. In this environment, access to services is stressed rather than data or software portability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Electrical Power Engineering Academic Landscape (November 2011)

University Outreach Initiative Overview The GridWise ® Architecture Council (GWAC) is a team of experts with diverse, relevant industry backgrounds that has documented the guiding principles for the architecture and interoperability of a future, intelligent, transactive, energy system. One of GWAC’s goals includes sharing information about their work broadly with industry and other communities that have a need to understand smart grid architecture and interoperability. The concept of a University Outreach Initiative was developed in the spring of 2011 as a set of market research and outreach activities. These activities were developed to identify opportunities for the dissemination of information about GWAC to academic and workforce development communities. Grant recipients of the Smart Grid Workforce Training Program, funded through the American Recovery and Reinvestment Act (ARRA), were identified as initial outreach recipients. This community consists of academic and workforce program managers involved in the development of electrical power engineering or other closely related smart grid technology and business programs at two and four-year institutions, via private sector curriculum development companies, and governmental or collaborate workforce development agencies. The Outreach Initiative started with the development of the Landscape Database and Contact Directory. These documents provide descriptive project and contact information for the Smart Grid Workforce Training Program recipients. Contact information was gathered through telephone calls and Internet research. Contacts identified by telephone were introduced in conversation to the project and were asked if they wished to participate. Their knowledge of GWAC was assessed. Contacts we could not reach by phone received introductory emails explaining the Outreach Initiative and providing links to important GWAC documents for background. A survey to identify contact interest in the initiative was circulated to all contacts several weeks later.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SEM Grid Testing at NLCTA in BeamNetUS Program

We report on the performance of a secondary electron monitor (SEM) grid used to measure the transverse profile of an MeV range electron beam at SLAC National Accelerator Laboratory’s Next Linear Collider Test Accelerator (NLCTA) facility. When inserted into the path of the electron beam, secondary electron emission results in a measurable current on the wires that make up the grid. We present measurements using this technique to reconstruct the beam profile. The SEM grid was designed and manufactured by a team of undergraduate students at Harvey Mudd College (HMC) and was tested at SLAC’s NLCTA facility in collaboration with NCLTA staff as part of the BeamNetUS program. Developed for real-time diagnostics of MeV-range electron beams, this SEM grid has potential applications in both industrial and medical contexts.

43 PARTICLE ACCELERATORS↗

Solar Energy Grid Integration Systems: Final Report of the Florida Solar Energy Center Team

Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

14 SOLAR ENERGY↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.