Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

An Overview of RF Systems for the EIC

The Electron Ion Collider (EIC) to be constructed at Brookhaven National Laboratory in the USA will be a complex system of accelerators providing high luminosity, high polarization, variable center of mass energy collisions between electrons and protons or ions. To achieve this a variety of RF systems are required. They must provide for capture, formation and storage of Ampere-class beams in the electron and hadron storage rings (ESR and HSR), fast acceleration of high-charge polarized electron bunches in the rapid cycling synchrotron (RCS), provision of cold high current electron bunches in the high-energy cooler ERL and precise high-gradient crabbing of electrons and hadrons either side of the interaction point. The challenges include strong HOM damping in the storage ring cavities and cooler ERL, very high fundamental mode power in the ESR and cooler injector, extremely stable low-noise operation of the crab cavities, mitigation of transient beam loading from gaps, and operating over a wide range of energies and beam currents. We describe the high-level system parameters and principal design choices made and progress on the R&D plan to develop these state of the art systems.

Rimmer, R. A.↗

Overview of escalator applications in rail transit

The difference in operating environment and in construction between escalators in transit and nontransit use, the impact of recent escalator innovations, and areas which could benefit from urban mass transportation administration sponsored research and development are determined. Several factors causing a more severe transit escalator operating environment are identified. There are no significant design differences between transit and nontransit escalators. Recent innovations that have affected performance and cost include outdoor escalators, extra flat steps at both landings, and modular escalators. Data were collected by interviews at transit agencies. Long term, unscheduled, escalator maintenance records were available for analysis from one property. A description of escalator operating principles is provided. Transit represents less than 5% of the U.S. escalator market. Transit agencies have limited leverage on escalator industry practices. A substantial impact on transit escalator cost and performance can be achieved by research identifying when and how to apply and specify several of the more recent innovations. Purchase of escalators under long term (25 year) maintenance contracts is one method that has been used to promote escalators manufactured for minimum life cycle cost.

Deshpande, G.↗

A survey of parametrized variational principles and applications to computational mechanics

This survey paper describes recent developments in the area of parametrized variational principles (PVP's) and selected applications to finite-element computational mechanics. A PVP is a variational principle containing free parameters that have no effect on the Euler-Lagrange equations. The theory of single-field PVP's based on gauge functions (also known as null Lagrangians) is a subset of the inverse problem of variational calculus that has limited value. On the other hand, multifield PVP's are more interesting from theoretical and practical standpoints. Following a tutorial introduction, the paper describes the recent construction of multifield PVP's in several areas of elasticity and electromagnetics. It then discusses three applications to finite-element computational mechanics: the derivation of high-performance finite elements, the development of element-level error indicators, and the constructions of finite element templates. The paper concludes with an overview of open research areas.

Felippa, Carlos A.↗

Remote Sensing May Provide Unprecedented Hydrological Data

Basic hydrological research and water resources management may reap tremendous benefits from remote sensing technology, studies are showing. Satellite coverage may allow unprecedented accuracy in the quantification of the global hydrological cycle, for example. Yet despite such benefits, few hydrologists currently use such data. This is partly because the needed tools and algorithms are not fully developed. Such development requires field experiments that combine remotely sensed data with detailed in situ observations. AGU's Remote Sensing in Hydrology Committee has constructed a Web site (http://Iand.gsfc.nasa.gov/RSHC.html) that gives an overview of many such experiments. Included on the site is information on each experiment's overall goal, the types of in situ and remotely sensed measurements taken, relevant climate and vegetation conditions, and so forth. Links to additional relevant Web sites are included. The site is designed to be a suitable starting point for those interested in learning more about remote sensing in hydrology. It lists members of the committee who can be contacted for further information. Hydrologists have recognized the potential of remote sensing technology since the 1970s. It offers a way to avoid the logistical and economic difficulties associated with obtaining continuous in situ measurements of various hydrological variables, difficulties that are particularly pronounced in remote regions. Microwave instruments in particular can potentially provide all-weather, areally averaged estimates of certain variables (such as precipitation, soil moisture, and snow water content) that have been essentially unattainable in the past. In remote sensing, the conversion of emitted and reflected radiances into useful hydrological data is a complex problem. The measured radiances, for example, reflect the integrated character of a pixel area, a scale inconsistent with the point measurements of traditional hydrology. To develop the needed algorithms, field experiments must be designed that combine relevant satellite measurements with traditional in situ measurements in regions that are al- ready well understood hydrologically. Such field experiments can lead to the development of hydrological models that are driven with remotely sensed data. Once the performance of these models is deemed acceptable in the heavily monitored basins, they can be "transported" for use in regions having little or no in situ measurement system. Author,5: Randal D. Koster, Paul R. Houser and Edwin T. Engman, Hydrological Sciences Branch, Laboratory for Hydrospheric Process, NASA Goddard Space Flight Center, Greenbelt, Maryland, USA; William P. Kustas, Hydrology Laboratory, Agricultural Research Service, U.S. Department of Agriculture, Beltsville, Maryland, USA.

Koster, R.↗

Expedition 6 Crew Interviews: Don Pettit, Flight Engineer 2/ International Space Station (ISS) Science Officer (SO)

Expedition 6 member Don Pettit (Flight Engineer 2/ International Space Station (ISS) Science Officer (SO)) is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. Pettit, who had been training as a backup crewmember, discusses the importance of training backups for ISS missions. He gives details on the goals and significance of the ISS, regarding experiments in various scientific disciplines such as the life sciences and physical sciences. Pettit also comments on the value of conducting experiments under microgravity. He also gives an overview of the ISS program to date, including the ongoing construction, international aspects, and the routines of ISS crewmembers who inhabit the station for four months at a time. He gives a cursory description of crew transfer procedures that will take place when STS-113 docks with ISS to drop off Pettit and the rest of Expedition 6, and retrieve the Expedition 5 crew.

Source record↗

eRHIC Design Overview

The Electron-Ion Collider (EIC) is being envisioned as the next facility to be constructed by the DOE Nuclear Physics program. Brookhaven National Laboratory is proposing eRHIC, a facility based on the existing RHIC complex as a cost effective realization of the EIC project with a peak luminosity of 10³⁴ cm⁻² sec⁻¹. An electron storage ring with an energy range from 5 to 18 GeV will be added in the existing RHIC tunnel. A spin-transparent rapid-cycling synchrotron (RCS) will serve as a full-energy polarized electron injector. Recent design improvements include reduction of the IR magnet strengths to avoid the necessity for Nb₃Sn magnets, and a novel hadron injection scheme to maximize the integrated luminosity. We will provide an overview of this proposed project and present the current design status.

43 PARTICLE ACCELERATORS↗

Overview of the SNS Target System Testing and Initial Beam Operation Experience

The Spallation Neutron Source (SNS) construction project has been completed including initial beam operation with the mercury target, moderators and associated systems. The project was initiated in 1999, with groundbreaking in December of 1999. Final integrated system testing for the mercury target, cryogenic moderators, shutter systems, water and other utility systems and all control and safety systems were completed in April 2006 and first beam on target delivered April 28, 2006. This paper will give an overview of the system testing conducted in preparation for beam operation and initial operating experience with low power beams. One area of testing was extensive remote handling testing in the Target Service Bay to demonstrate all key operations associated with the target and mercury loop. Many improvements were implemented as a result of this experience. Another set of tests involved bringing the supercritical cryogenic moderator systems on line. Again, lesions learned here resulted in system changes. Testing of the four water loops was very time consuming because of the complexity of the systems and many instrumentation issues had to be resolved. A temporary phosphor view screen was installed on the front of the target which has been extremely useful in evaluating the beam profile on the target. Initial profile results will be presented. Target System performance for initial beam operation will be discussed. In general, all systems performed well with excellent availability. There were some unexpected findings. For example, xenon spallation gas products are believed to have deposited on a downstream gold amalgamation bed designed to remove mercury vapor and increased the local dose rate. A summary of findings and plans for ramping up in power will be given.

Spallation↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

42 ENGINEERING↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

14 SOLAR ENERGY↗

Overview of Field Experience - Degradation Rates & Lifetimes

The way a PV module fails may depend not only on its design and the materials used in its construction, but also on the weather it experiences, the way it is mounted, and the quality control during its manufacture. This presentation gives an overview of Field Experience - what degradation rates and what lifetimes are being observed in various regions.

14 SOLAR ENERGY↗

Space research and technology base overview

Information in viewgraph form is given on aerothermodynamics, space energy conversion, spacecraft propulsion, spacecraft construction materials, spacecraft communications, spacecraft control, human factors engineering, and systems analysis.

Couch, Lana M.↗

Current Practices in Constructing and Evaluating Assurance Cases With Applications to Aviation

This report introduces and provides an overview of assurance cases including theory, practice, and evaluation. This report includes a section that introduces the principles, terminology, and history of assurance cases. The core of the report presents twelve example uses of assurance cases from a range of domains, using a novel classification scheme. The report also reviews the state of the art in assurance case evaluation methods.

David J Rinehart↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events 2022

Nov 20th, 2022 marks the 24th anniversary of the beginning of construction of the International Space Station(ISS). The ECLS system is constantly changing to meet the needs of current missions and future exploration. The ISS has become the laboratory that was always envisioned, allowing for an ever-growing class of exploration level technologies that will propel the stage forward as humanity advances beyond Low Earth Orbit (LEO). This paper will review the past year, and look towards the future for each U.S. ECLS subsystem. The impacts, challenges, and successes related to the intermingling of incumbent and cutting edge technologies are summarily discussed in this paper.

Steven F Balistreri↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events 2022

Nov 20th, 2022 marks the 24th anniversary of the beginning of construction of the International Space Station (ISS). The ECLS system is constantly changing to meet the needs of current missions and future exploration. The ISS has become the laboratory that was always envisioned, allowing for an ever-growing class of exploration level technologies that will propel the stage forward as humanity advances beyond Low Earth Orbit (LEO). This paper will review the past year and look towards the future for each U.S. ECLS subsystem. The impacts, challenges, and successes related to the intermingling of incumbent and cutting-edge technologies are summarily discussed in this paper.

Steven F Balistreri Jr.↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events 2023

November 20th, 2023 marks the 25th anniversary of the beginning of construction of the International Space Station (ISS). The ECLS system is constantly changing to meet the needs of current missions and future exploration. The ISS has become the laboratory that was always envisioned, allowing for an ever-growing class of exploration level technologies that will propel the stage forward as humanity advances beyond Low Earth Orbit (LEO). This paper will review the past year, and look towards the future for each U.S. ECLS subsystem. The impacts, challenges, and successes related to the intermingling of incumbent and cutting edge technologies are summarily discussed in this paper.

Steven F Balistreri Jr.↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events 2023

Nov 20th, 2023 marks the 25th anniversary of the beginning of construction of the International Space Station (ISS). The ECLS system is constantly changing to meet the needs of current missions and future exploration. The ISS has become the laboratory that was always envisioned, allowing for an ever-growing class of exploration level technologies that will propel the stage forward as humanity advances beyond Low Earth Orbit (LEO). This paper will review the past year, and look towards the future for each U.S. ECLS subsystem. The impacts, challenges, and successes related to the intermingling of incumbent and cutting edge technologies are summarily discussed in this paper.

Steven F Balistreri, Jr↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events 2023

Nov 20th, 2023 marks the 25th anniversary of the beginning of construction of the International Space Station (ISS). The ECLS system is constantly changing to meet the needs of current missions and future exploration. The ISS has become the laboratory that was always envisioned, allowing for an ever-growing class of exploration level technologies that will propel the stage forward as humanity advances beyond Low Earth Orbit (LEO). This paper will review the past year, and look towards the future for each U.S. ECLS subsystem. The impacts, challenges, and successes related to the intermingling of incumbent and cutting edge technologies are summarily discussed in this paper.

Kristina Robinson↗

Integrating Embodied Carbon Knowledge for Design Decisions: Preprint

Measuring energy consumption of buildings is well established, and techniques to evaluate the carbon associated with operating buildings are improving. Embodied carbon of buildings is more complex as it considers the release of carbon throughout the building material supply chain and building material end of life fate. Decisions made early during the design and construction of the building can influence and potentially reduce the embodied carbon of buildings. The design and construction communities are uniquely positioned to make decisions that reduce embodied carbon. The objective of this project is to understand barriers to low carbon design and delivery and to point the design and construction communities to useful resources that will result in decisions that reduce embodied carbon. The outcomes of this work include educational resources that familiarize designers and contractors with embodied carbon and life cycle assessments (LCA), case studies that focus on design changes from LCA results, an overview of LCA tools, and examples of readily available, cost-effective design and construction steps to lower embodied carbon. We present an evaluation of existing resources, organized in a decision tree guidance, and identify gaps for further resource development. Through this evaluation process we investigated ways to streamline the process of identifying barriers to implementing solutions quickly.

design professional decisions↗