NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Guidelines for cost control and analysis of cost-type research and development contracts

The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

Sibbers, C. W.↗

Low energy stage study. Volume 4: Cost benefits analysis and recommendations

The costs and benefits of existing/planned systems, new propulsion concepts, and adaptations of existing/planned systems (as supported by Orbiter interface requirements and operations requirements) were quantified. Scenarios of these propulsion approaches were established which accommodate the low energy regime as defined by the new low energy payload mission model. These scenarios were screened on a cost and then a benefits basis. A propulsion approach comprising existing/planned systems and a new propulsion concept were selected as the most cost effective approach to accommodate the model payloads and the low energy regime they represent. Key cost drivers and sensitivity trends were identified. All costs were derived in 1977 dollars.

Source record↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Low-cost data analysis systems for processing multispectral scanner data

The basic hardware and software requirements are described for four low cost analysis systems for computer generated land use maps. The data analysis systems consist of an image display system, a small digital computer, and an output recording device. Software is described together with some of the display and recording devices, and typical costs are cited. Computer requirements are given, and two approaches are described for converting black-white film and electrostatic printer output to inexpensive color output products. Examples of output products are shown.

Whitely, S. L.↗

Parametric Cost Deployment

Parametric cost analysis is a mathematical approach to estimating cost. Parametric cost analysis uses non-cost parameters, such as quality characteristics, to estimate the cost to bring forth, sustain, and retire a product. This paper reviews parametric cost analysis and shows how it can be used within the cost deployment process.

Dean, Edwin B.↗

Payload analysis for space shuttle applications (study 2.2). Volume 3: Payload system operations analysis (task 2.2.1)

The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.

Source record↗

Outline of cost-benefit analysis and a case study

The methodology of cost-benefit analysis is reviewed and a case study involving solar cell technology is presented. Emphasis is placed on simplifying the technique in order to permit a technical person not trained in economics to undertake a cost-benefit study comparing alternative approaches to a given problem. The role of economic analysis in management decision making is discussed. In simplifying the methodology it was necessary to restrict the scope and applicability of this report. Additional considerations and constraints are outlined. Examples are worked out to demonstrate the principles. A computer program which performs the computational aspects appears in the appendix.

Kellizy, A.↗

The JPL Cost Risk Analysis Approach that Incorporates Engineering Realism

This paper discusses the JPL Cost Engineering Group (CEG) cost risk analysis approach that accounts for all three types of cost risk. It will also describe the evaluation of historical cost data upon which this method is based. This investigation is essential in developing a method that is rooted in engineering realism and produces credible, dependable results to aid decision makers.

cost risk↗

Stereo Vision Based Terrain Mapping for Off-Road Autonomous Navigation

Successful off-road autonomous navigation by an unmanned ground vehicle (UGV) requires reliable perception and representation of natural terrain. While perception algorithms are used to detect driving hazards, terrain mapping algorithms are used to represent the detected hazards in a world model a UGV can use to plan safe paths. There are two primary ways to detect driving hazards with perception sensors mounted to a UGV: binary obstacle detection and traversability cost analysis. Binary obstacle detectors label terrain as either traversable or non-traversable, whereas, traversability cost analysis assigns a cost to driving over a discrete patch of terrain. In uncluttered environments where the non-obstacle terrain is equally traversable, binary obstacle detection is sufficient. However, in cluttered environments, some form of traversability cost analysis is necessary. The Jet Propulsion Laboratory (JPL) has explored both approaches using stereo vision systems. A set of binary detectors has been implemented that detect positive obstacles, negative obstacles, tree trunks, tree lines, excessive slope, low overhangs, and water bodies. A compact terrain map is built from each frame of stereo images. The mapping algorithm labels cells that contain obstacles as no-go regions, and encodes terrain elevation, terrain classification, terrain roughness, traversability cost, and a confidence value. The single frame maps are merged into a world map where temporal filtering is applied. In previous papers, we have described our perception algorithms that perform binary obstacle detection. In this paper, we summarize the terrain mapping capabilities that JPL has implemented during several UGV programs over the last decade and discuss some challenges to building terrain maps with stereo range data.

passive perception↗

Cost-Benefit Analysis of Electricity Resilience Projects: State of the Art and Gap Analysis

Utilities and regulators must weigh the benefits of electricity resilience projects against their costs, which would be passed on to customers. Cost-benefit analysis (CBA) is an appropriate method for assessing this tradeoff. Here, in this paper we review the literature on CBA of electricity resilience projects and analyze gaps in the available methods and tools. The costs of resilience projects are typically straightforward to estimate but their benefits — particularly the avoided costs of power interruptions — are complex to quantify and monetize. A common perception among practitioners is that current CBA tools are not sufficiently mature to be adopted into real-world practice. We propose an electricity resilience CBA framework consisting of several elements: risks, physical impacts, power interruptions, economic impacts, and resilience projects. While methods for some elements are well-developed, there is a need for novel approaches to value avoided power interruptions, integrate multiple risks and benefit streams, and incorporate uncertainty.

Cost-benefit analysis↗

Single stage earth orbital reusable vehicle. Volume 6: Resources

The results of a conceptual study of the resource requirements for a single-stage earth-orbital vehicle are presented. All aspects of program costs for the design, manufacture, test, transportation, launch, and facility modifications were considered. The following program costs are discussed: configuration definition, cost groundrules and assumptions, program requirements, work breakdown structure, cost estimation methods, and cost analysis. High cost areas are identified.

Source record↗

Feasibility study of modern airships, phase 2. Volume 2: Airport feeder vehicle

The Airport Feeder vehicle is a VTOL, semi-buoyant ellipsoidal airship capable of transporting passengers or cargo to major CTOL hub terminals from suburban and downtown depots. Six tasks were reviewed: (1) vehicle design definition, (2) operational procedures analysis, (3) cost analysis, (4) comparison with alternate transportation modes, (5) mission/vehicle feasibility assessment, and (6) technology assessment.

Source record↗

Space Biology Initiative. Trade Studies, volume 1

The six studies which are addressed are entitled: Design Modularity and Commonality; Modification of Existing Hardware (COTS) vs. New Hardware Build Cost Analysis; Automation Cost vs. Crew Utilization; Hardware Miniaturization versus Cost; Space Station Freedom/Spacelab Modules Compatibility vs. Cost; and Prototype Utilization in the Development of Space Hardware. The product of these six studies was intended to provide a knowledge base and methodology that enables equipment produced for the Space Biology Initiative program to meet specific design and functional requirements in the most efficient and cost effective form consistent with overall mission integration parameters. Each study promulgates rules of thumb, formulas, and matrices that serves has a handbook for the use and guidance of designers and engineers in design, development, and procurement of Space Biology Initiative (SBI) hardware and software.

Source record↗

Space Biology Initiative. Trade Studies, volume 2

The six studies which are the subjects of this report are entitled: Design Modularity and Commonality; Modification of Existing Hardware (COTS) vs. New Hardware Build Cost Analysis; Automation Cost vs. Crew Utilization; Hardware Miniaturization versus Cost; Space Station Freedom/Spacelab Modules Compatibility vs. Cost; and Prototype Utilization in the Development of Space Hardware. The product of these six studies was intended to provide a knowledge base and methodology that enables equipment produced for the Space Biology Initiative program to meet specific design and functional requirements in the most efficient and cost effective form consistent with overall mission integration parameters. Each study promulgates rules of thumb, formulas, and matrices that serves as a handbook for the use and guidance of designers and engineers in design, development, and procurement of Space Biology Initiative (SBI) hardware and software.

Source record↗

Common modeling system for digital simulation

The Joint Modeling and Simulation System is a tri-service investigation into a common modeling framework for the development digital models. The basis for the success of this framework is an X-window-based, open systems architecture, object-based/oriented methodology, standard interface approach to digital model construction, configuration, execution, and post processing. For years Department of Defense (DOD) agencies have produced various weapon systems/technologies and typically digital representations of the systems/technologies. These digital representations (models) have also been developed for other reasons such as studies and analysis, Cost Effectiveness Analysis (COEA) tradeoffs, etc. Unfortunately, there have been no Modeling and Simulation (M&S) standards, guidelines, or efforts towards commonality in DOD M&S. The typical scenario is an organization hires a contractor to build hardware and in doing so an digital model may be constructed. Until recently, this model was not even obtained by the organization. Even if it was procured, it was on a unique platform, in a unique language, with unique interfaces, and, with the result being UNIQUE maintenance required. Additionally, the constructors of the model expended more effort in writing the 'infrastructure' of the model/simulation (e.g. user interface, database/database management system, data journalizing/archiving, graphical presentations, environment characteristics, other components in the simulation, etc.) than in producing the model of the desired system. Other side effects include: duplication of efforts; varying assumptions; lack of credibility/validation; and decentralization in policy and execution. J-MASS provides the infrastructure, standards, toolset, and architecture to permit M&S developers and analysts to concentrate on the their area of interest.

Painter, Rick↗

Cost Benefit Analysis of Space Debris Remediation

These slides provide a high-level summary of a cost-benefit analysis of approaches for debris remediation, which is defined as any action taken to reduce the risks posed by orbital debris by moving, removing, or reusing it. A better understanding of the near-term costs and benefits of the different approaches to remediation can support decision-making about R&D investment and policy creation in this area.

Tom Colvin↗