Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost estimation cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Weight and the Future of Space Flight Hardware Cost Modeling

Weight has been used as the primary input variable for cost estimating almost as long as there have been parametric cost models. While there are good reasons for using weight, serious limitations exist. These limitations have been addressed by multi-variable equations and trend analysis in models such as NAFCOM, PRICE, and SEER; however, these models have not be able to address the significant time lags that can occur between the development of similar space flight hardware systems. These time lags make the cost analyst's job difficult because insufficient data exists to perform trend analysis, and the current set of parametric models are not well suited to accommodating process improvements in space flight hardware design, development, build and test. As a result, people of good faith can have serious disagreement over the cost for new systems. To address these shortcomings, new cost modeling approaches are needed. The most promising approach is process based (sometimes called activity) costing. Developing process based models will require a detailed understanding of the functions required to produce space flight hardware combined with innovative approaches to estimating the necessary resources. Particularly challenging will be the lack of data at the process level. One method for developing a model is to combine notional algorithms with a discrete event simulation and model changes to the total cost as perturbations to the program are introduced. Despite these challenges, the potential benefits are such that efforts should be focused on developing process based cost models.

Prince, Frank A.↗

The Application of Architecture Frameworks to Modelling Exploration Operations Costs

Developments in architectural frameworks and system-of-systems thinking have provided useful constructs for systems engineering. DoDAF concepts, language, and formalisms, in particular, provide a natural way of conceptualizing an operations cost model applicable to NASA's space exploration vision. Not all DoDAF products have meaning or apply to a DoDAF inspired operations cost model, but this paper describes how such DoDAF concepts as nodes, systems, and operational activities relate to the development of a model to estimate exploration operations costs. The paper discusses the specific implementation to the Mission Operations Directorate (MOD) operational functions/activities currently being developed and presents an overview of how this powerful representation can apply to robotic space missions as well.

Department of Defense Architecture Framework (DoDA↗

NASA Instrument Cost/Schedule Model

NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

JCL↗

The structure of the software cost function

It is the purpose of this paper to analyze the structure of the cost estimating relationships that commercial cost models use and to test whether they are viable cost functions.

cost function cost estimating relationship wage ra↗

Assembly-line Simulation Program

Costs and profits estimated for models based on user inputs. Standard Assembly-line Manufacturing Industry Simulation (SAMIS) program generalized so useful for production-line manufacturing companies. Provides accurate and reliable means of comparing alternative manufacturing processes. Used to assess impact of changes in financial parameters as cost of resources and services, inflation rates, interest rates, tax policies, and required rate of return of equity. Most important capability is ability to estimate prices manufacturer would have to receive for its products to recover all of costs of production and make specified profit. Written in TURBO PASCAL.

Chamberlain, Robert G.↗

Satellite Constellation Cost Modeling: An Aggregate Model

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

Towards A Flexible Data Fusion Tool Incorporating Model, Satellite, Regulatory Monitor and Low-Cost Sensor Data for Air Quality Estimation and Forecasting

Air quality managers, researchers, and concerned community scientists around the world have a variety of sources for air quality information, ranging from traditional regulatory monitoring networks and atmospheric chemistry models to remote sensing data products and low-cost sensor networks. However, the ability to incorporate data from these disparate sources and synthesize a comprehensive overview of the local air quality situation remains a considerable barrier for many end-users. This presentation will outline a tool, currently in development, which will address this need using a flexible data fusion approach. The tool will make use of air quality forecast model outputs (primarily from the NASA GEOS-CF composition forecast modeling system), satellite remote sensing data (from instruments including MODIS, VIIRS, TROPOMI, plus TEMPO for the US when available), and in-situ data from official regulatory and/or low-cost networks where these are available. The ability to incorporate data from low-cost sensor networks will be a key feature of the tool; it will make use of other available data sources to calibrate the low-cost sensor data on a regional scale, then use these calibrated low-cost sensor data for localized updating to resolve finer-scale air quality patterns. Development of this tool is taking place with the help of national and international partners and end-user groups, coordinated through the US EPA and the United Nations Environment Programme (UNEP). The tool is being developed on the Google Earth Engine cloud computing platform to facilitate integration of diverse data sources and free access by a broad community of end-users. Stewardship of the tool will be passed to US EPA and UNEP to support future activities with end-users in the US and around the world, and the tool itself will remain freely accessible. We hope that this tool will lower the barrier to entry for various user groups worldwide, including community scientists, who struggle to integrate disparate data sources to gain insight into their local air quality situations. This presentation will cover the early stages of the development of the tool, including the underlying methods and some pilot case studies in integrating low-cost sensor data.

global models↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM) is a computer program that simulates pertinent aspects of the testing of rocket engines for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Source record↗

Sensitivity study of Space Station Freedom operations cost and selected user resources

The results of sensitivity studies performed to estimate probable ranges for four key Space Station parameters using the Space Station Freedom's Model for Estimating Space Station Operations Cost (MESSOC) are discussed. The variables examined are grouped into five main categories: logistics, crew, design, space transportation system, and training. The modification of these variables implies programmatic decisions in areas such as orbital replacement unit (ORU) design, investment in repair capabilities, and crew operations policies. The model utilizes a wide range of algorithms and an extensive trial logistics data base to represent Space Station operations. The trial logistics data base consists largely of a collection of the ORUs that comprise the mature station, and their characteristics based on current engineering understanding of the Space Station. A nondimensional approach is used to examine the relative importance of variables on parameters.

Accola, Anne↗

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft↗

Blind Validation Study of Parametric Cost Estimation Tool SEER-H for NASA Space Missions

One of the primary parametric cost modeling tools used by NASA and the aerospace industry to estimate the development and production cost of future spacecraft hardware is SEER-H by Galorath. To date, no independent validation of this tool for cost estimation of space missions has been reported in the literature. In the present validation study, cost estimators used SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. The point estimates of SEER-H had an average error of 23%, median error of -0.3%, and a standard deviation of 43%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates. Several factors independent of SEER that may have affected the accuracy of the results have been identified and are discussed; these include: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER-H↗

Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

Rosenberg, Leigh↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM), a discrete event simulation developed in Extend , simulates pertinent aspects of the testing of rocket propulsion test articles for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Smith, C. L.↗

Preliminary Parametric Cost Model for X-Ray Grazing Incidence Optics for Space Flight

Parametric cost models offer a lot of utility in planning and comparing different missions and concepts. Furthermore, they have a significant advantage over other estimating methodologies as they can be quickly and easily replicated. The cost model presented in this paper focuses on estimating the most likely cost for the X-ray Mirror Assembly (XMA) of space-based X-ray telescopes with grazing incidence optics. The authors recognize the complexities of generating a single cost model that covers multiple fabrication techniques, so they have limited this preliminary study to techniques used on previous and current missions, such as direct polished glass full shell, replicated, and foil optics

Space Telescope Cost Model↗

MESSOC capabilities and results

MESSOC (Model for Estimating Space Station Operations Costs) is the result of a multi-year effort by NASA to understand and model the mature operations cost of Space Station Freedom. This paper focuses on MESSOC's ability to contribute to life-cycle cost analyses through its logistics equations and databases. Together, these afford MESSOC the capability to project not only annual logistics costs for a variety of Space Station scenarios, but critical non-cost logistics results such as annual Station maintenance crewhours, upweight/downweight, and on-orbit sparing availability as well. MESSOC results using current logistics databases and baseline scenario have already shown important implications for on-orbit maintenance approaches, space transportation systems, and international operations cost sharing.

Shishko, Robert↗

Terminal Area Productivity Airport Wind Analysis and Chicago O'Hare Model Description

This paper describes two results from a continuing effort to provide accurate cost-benefit analyses of the NASA Terminal Area Productivity (TAP) program technologies. Previous tasks have developed airport capacity and delay models and completed preliminary cost benefit estimates for TAP technologies at 10 U.S. airports. This task covers two improvements to the capacity and delay models. The first improvement is the completion of a detailed model set for the Chicago O'Hare (ORD) airport. Previous analyses used a more general model to estimate the benefits for ORD. This paper contains a description of the model details with results corresponding to current conditions. The second improvement is the development of specific wind speed and direction criteria for use in the delay models to predict when the Aircraft Vortex Spacing System (AVOSS) will allow use of reduced landing separations. This paper includes a description of the criteria and an estimate of AVOSS utility for 10 airports based on analysis of 35 years of weather data.

Hemm, Robert↗

Making the Case for Reusable Booster Systems: The Operations Perspective

Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

reusable launch vehicle↗