Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

HOM Spectra Measurements in 1.3 GHz Cavities for LCLS-II

Fermilab recently completed production and testing of 1.3 GHz cryomodules for the LCLS-II project. Each cryomodule consists of eight TESLA-shaped super-conducting elliptical cavities equipped with two High Order Mode (HOM) coupler ports. Measurement of the HOM spectrum is part of the incoming quality control of cavities at room temperature and the final qualification cold test of cryomodules at the Cryomodule Test Facility (CMTF). In this paper we describe the procedure for measuring the HOM spectrum along with further data processing. Finally, we present accumulated statistics of individual HOM frequencies and quality factors related to various cavity vendors and dis-cuss the possible contribution of HOMs to heat loads and beam dynamics.

Lunin, A.↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

Results of High Order Modes Spectra Measurements in 1.3 GHz Cavities for LCLS-II

Fermilab recently completed production and testing of 1.3 GHz cryomodules for the LCLS-II project. Each cryomodule consists of eight TESLA-shaped superconducting elliptical cavities equipped with two High Order Mode (HOM) coupler ports. Measurement of the HOM spectrum is part of the incoming quality control of cavities at room temperature and the final qualification cold test of cryomodules at the Cryomodule Test Facility (CMTF). In this paper we describe the procedure for measuring the HOM spectrum along with further data processing. Finally, we present accumulated statistics of individual HOM frequencies and quality factors related to various cavity vendors and discuss the possible contribution of HOMs to heat loads and beam dynamics.

43 PARTICLE ACCELERATORS↗

Status of the PIP-II Cryoplant

The Proton Improvement Plan-II (PIP-II) is an essential upgrade to the Fermilab accelerator complex featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac). The Linac contains 23 SRF cryomodules with the SRF cavities operating at 2 K, a high temperature thermal shield at 40 K and low temperature intercepts at 4.5 K. The PIP-II cryoplant will provide the necessary cooling for the cryomodules and the cryogenic distribution system interconnecting cryoplant and cryomodules. This paper describes the evolution of the PIP-II cryoplant conceptual design and specifications, including the expected heat loads, required cooling features and the integrated design. The cryoplant capacity margin analysis and fast cool-down mode will also be discussed.

43 PARTICLE ACCELERATORS↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

Design Study of a Superconducting Quadrupole Magnet System Sustainable Under Dark Current Heating in ILC Main Linac

The International Linear Collider (ILC) main linac comprises a series of 12 m-long cryomodules. The cryomodule contains eight 9-cell superconducting (SC) RF (SRF) cavities and an SC quadrupole magnet combined with dipole correctors to focus and steer electron and positron beams. The magnets are installed between the SRF cavity string and at the longitudinal center of a common cryomodule/cryostat. These magnets are conductively cooled by pure aluminum channels thermally connected to a 2 K two-phase helium pipe for cooling the SRF cavities. A recent study shows that field-emitted electrons, so-called “dark current” initiated in the SRF cavities, are transmitted through the SRF cavity string and reach the SC magnet. The energy is inevitably absorbed in the SC coil due to the magnetic field, resulting in risks of a quench caused by the coil heating. We are investigating alternate magnet designs by using Nb $_{3}$ Sn or $\text{MgB}_{2}$ SC and by adding the dark current absorber surrounding the beam-pipe to realize sustainable magnet operation under the dark current heating. We report the design study of the magnet system and interfaces to the cryomodule accommodating it with the SRF cavities.

43 PARTICLE ACCELERATORS↗

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

In Situ Plasma Processing of Superconducting Cavities at JLab

Jefferson Lab has an ongoing R&D program in plasma processing which is close to going into production pro-cessing in the CEBAF accelerator. Plasma processing is a common technique for removing hydrocarbons from surfaces, which increases the work function and reduces the secondary emission coefficient[1]. The initial focus of the effort is processing C100 cavities by injecting RF power into the HOM coupler ports. The goal will be to improve the operational gradients and the energy margin of the CEBAF linacs by processing cryomodules in situ. Results from processing cryomodule in the cryomodule test bunker as well as vertical test results will be present-ed. This work will describe the systems and methods used at JLAB for processing cavities using an argon oxygen gas mixture. Before and after plasma processing results will also be presented.

Powers, T.↗

HE Production Update at JLab - Introducing an Enhanced Nitrogen Purge for Clean String Assembly

A major limitation to cryomodule performance is field emission caused by particulates within the superconducting cavities. To reduce contamination of the inner surfaces during assembly in a cleanroom, the whole string can be connected to a purge system, which maintains a constant overpressure of dry, clean nitrogen gas. Following successes of similar systems at XFEL and Fermilab, Jefferson Lab followed this example for the production of LCLS-II HE cryomodules. Implementing this system required new procedures, infrastructure, and hardware, as well as significant testing of the system before production began. This paper will summarize the implemented controls and procedures, including lessons learned from Fermilab, as well as the results of mock-up tests. Based on the latter, the system was used to assemble the first article string in April 2022, and was also used during a rework required due to issues with cold FPC ceramics two months later. The benefits of using a purge system with regards to procedure, time savings, and added flexibility for potential rework have already proven to provide a significant improvement for the production of LCLS-II-HE cryomodules at Jefferson Lab.

Owen, P. D.↗

STC Qualification Tests of PIP-II HB650 Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3.3 · 10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. The Fermilab Spoke Test Cryostat (STC) has been upgraded to accommodate testing of 650 MHz cavities. Commissioning of upgraded STC has been reported at SRF’19 conference. In this paper we present results of testing of the prototype HB650 cavity in upgraded STC facility. We characterize cavity performance and qualify it for the prototype HB650 cryomodule assembly.

43 PARTICLE ACCELERATORS↗

Machine Learning Based Cavity Fault Classification and Prediction

We report on the development of machine learning models for classifying C100 superconducting radio frequency (SRF) cavity faults in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. CEBAF is a continuous-wave recirculating linac utilizing 418 SRF cavities to accelerate electrons up to 12 GeV through 5-passes. Of these, 96 cavities (12 cryomodules) are designed with a digital low-level RF system configured such that a cavity fault triggers waveform recordings of 17 RF signals for each of the eight cavities in the cryomodule. Subject matter experts (SME) can analyze the collected time-series data, identify which of the eight cavities faulted first, and classify the type of fault. This information is used to find trends and strategically deploy mitigations to problematic cryomodules. However, manually labeling the data is laborious and time-consuming. By leveraging machine learning, near real-time – rather than post-mortem – identification of the offending cavity and classification of the fault type has been implemented. We discuss the performance of the ML models during a recent physics run.

43 PARTICLE ACCELERATORS↗

Plasma Processing of SRF Cavities at Jefferson Lab

Jefferson Lab has an ongoing R&D program in plasma processing which is close to going into production pro-cessing in the CEBAF accelerator. Plasma processing is a common technique for removing hydrocarbons from surfaces, which increases the work function and reduces the secondary emission coefficient [1]. The initial focus of the effort is processing C100 cavities by injecting RF power into the HOM coupler ports. The goal will be to improve the operational gradients and the energy margin of the CEBAF linacs by processing cryomodules in situ. Results from processing a cryomodule in the cryomodule test bunker as well as cavity vertical test results will be presented. This work describes the systems and methods used at JLAB for processing cavities using an ar-gon/oxygen gas mixture.

Powers, T.↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Precision measurement of the magnetic field in run 1 of the g-2 experiment

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB 650 CM.

Yoon, S. [Fermilab]↗

The Fermilab SSR1 and HB650 Synoptic and EPICS remote cryogenic control system

The 325MHz Single Spoke Resonator 1 (SSR1) Cryomodule (CM) has a 5.3-meter length, and it has 288-liter liquid helium @ 4.5K mode. The High Beta 650 MHz (HB650) CM contains six elliptical cavity cryomodules, has a 9.9-meter overall length and it has 530-liter liquid helium. The SSR1 and HB650 CM had been tested at Fermilab Cryomodule Test Facility (CMTF). Their cryogenic control system includes the Siemens Process Control System S7-400, Automation Direct DL205 PLC, and remote synoptic HMI/EPICS Phoebus GUI. This paper presents a method which has been successfully used by Fermilab PIP2 IT cryogenic remote on-line, real-time control systems.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign, an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real-time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB650 CM.

Yoon, S. [Fermilab]↗