Search NASA⌕ Search

SEARCH · Search NASA

Results for “delta-V”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Abort Options for Human Lunar Missions between Earth Orbit and Lunar Vicinity

Apollo mission design emphasized operational flexibility that supported premature return to Earth. However, that design was tailored to use expendable hardware for short expeditions to low-latitude sites and cannot be applied directly to an evolutionary program requiring long stay times at arbitrary sites. This work establishes abort performanc e requirements for representative onorbit phases of missions involvin g rendezvous in lunar-orbit, lunar-surface and at the Earth-Moon libr ation point. This study submits reference abort delta-V requirements and other Earth return data (e.g., entry speed, flight path angle) and also examines the effect of abort performance requirements on propul sive capability for selected vehicle configurations.

Condon, Gerald L.↗

A Lunar Communications and Navigation Satellite Concept for the Robotic Lunar Exploration Program

The Second Robotic Lunar Exploration Program (RLEP) mission has two primary objectives. Broadly stated, they are "To See the Light" and "To Touch the Ice", meaning one mission objective is to survey the lighting conditions on the rim of a candidate crater over the course of a year, and the second objective is to descend into th.! s crater to search for water ice. The Space Communications Program Office at NASA/GSFC is supporting the RLEP-2 Project by developing a communications and navigation architecture for the mission. The primary candidate crater studied is the Shackleton Crater near the South Pole of the Moon. The rim of this crater has approximately 14 contiguous days of visibility to the Earth over the course of a month, while mission elements in the crater have no line of sight to either the Earth or potentially an element on the rim of the crater. One solution studied is to launch a relay spacecraft with RLEP-2 to provide communications and navigation services to the elements on the lunar surface. To support operations concepts requiring long duration contacts between the relay and the elements in the crater, an inclined elliptical orbit originally conceived by Todd Ely a t JPL was chosen for the relay. The orbit was adjusted to lower the maximum range while maintaining its "frozen" nature, meaning once placed in this orbit little delta-V is required for orbit maintenance. The orbital parameters were adjusted such that the relay has visibility into the crater for approximately 8.7 hours of the 12 hour orbital period. The relay satellite design draws heavily upon heritage concepts and hardware to achieve a very low risk implementation. The design concept is a 3-axis spacecraft that is capable of supporting return communication links from multiple surface elements concurrently through a four-element S-Band Multiple Access phased array with two forward links provided through single dedicated elements. The payload is a bent-pipe relay with beamforming performed on the ground (Earth). To mitigate concerns with multipath observed during Mars missions, the preliminary design employs PN-spread signal structures which have been used successfully by Tracking and Data Relay Satellite System (TDRSS) users for simultaneous real-time and recorded data playback. Details of the relay communication trade studies and rationale for the selected design elements are discussed in the paper.

Gramling, Jeffrey J.↗

Advanced Chemical Propulsion System Study

A detailed; mission-level systems study has been performed to show the benefit resulting from engine performance gains that will result from NASA's In-Space Propulsion ROSS Cycle 3A NRA, Advanced Chemical Technology sub-topic. The technology development roadmap to accomplish the NRA goals are also detailed in this paper. NASA-Marshall and NASA-JPL have conducted mission-level studies to define engine requirements, operating conditions, and interfaces. Five reference missions have been chosen for this analysis based on scientific interest, current launch vehicle capability and trends in space craft size: a) GTO to GEO, 4800 kg, delta-V for GEO insertion only approx.1830 m/s; b) Titan Orbiter with aerocapture, 6620 kg, total delta V approx.210 m/s, mostly for periapsis raise after aerocapture; c) Enceladus Orbiter (Titan aerocapture) 6620 kg, delta V approx.2400 m/s; d) Europa Orbiter, 2170 kg, total delta V approx.2600 m/s; and e) Mars Orbiter, 2250 kg, total delta V approx.1860 m/s. The figures of merit used to define the benefit of increased propulsion efficiency at the spacecraft level include propulsion subsystem wet mass, volume and overall cost. The objective of the NRA is to increase the specific impulse of pressure-fed earth storable bipropellant rocket engines to greater than 330 seconds with nitrogen tetroxide and monomothylhydrazine propellants and greater than 335 , seconds with nitrogen tetroxide and hydrazine. Achievement of the NRA goals will significantly benefit NASA interplanetary missions and other government and commercial opportunities by enabling reduced launch weight and/or increased payload. The study also constitutes a crucial stepping stone to future development, such as pump-fed storable engines.

Portz, Ron↗

Use of Cumulative Degradation Factor Prediction and Life Test Result of the Thruster Gimbal Assembly Actuator for the Dawn Flight Project

The Dawn Ion Propulsion System is the ninth project in NASA s Discovery Program. The Dawn spacecraft is being developed to enable the scientific investigation of the two heaviest main-belt asteroids, Vesta and Ceres. Dawn is the first mission to orbit two extraterrestrial bodies, and the first to orbit a main-belt asteroid. The mission is enabled by the onboard Ion Propulsion System (IPS) to provide the post-launch delta-V. The three Ion Engines of the IPS are mounted on Thruster Gimbal Assembly (TGA), with only one engine operating at a time for this 10-year mission. The three TGAs weigh 14.6 kg.

Lo, C. John↗

Lunar Reconnaissance Orbiter (LRO) Guidance, Navigation and Control (GN&C) Overview

The National Aeronautics and Space Administration s (NASA) Lunar Reconnaissance Orbiter (LRO) launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle and into a direct insertion trajectory to the oon. LRO, which was designed, built, and operated by the NASA Goddard Space Flight Center in Greenbelt, MD, is gathering crucial data on the lunar environment that will help astronauts prepare for long-duration lunar expeditions. The mission has a nominal life of 1 year as its seven instruments find safe landing sites, locate potential resources, characterize the radiation environment, and test new technology. To date, LRO has been operating well within the bounds of its requirements and has been collecting excellent science data images taken from the LRO Camera Narrow Angle Camera of the Apollo landing sites appeared on cable news networks. A significant amount of information on LRO s science instruments is provided at the LRO mission webpage. LRO s Guidance, Navigation and Control (GN&C) subsystem is made up of an onboard attitude control system (ACS) and a hardware suite of sensors and actuators. The LRO onboard ACS is a collection of algorithms based on high level and derived requirements, and reflect the science and operational events throughout the mission lifetime. The primary control mode is the Observing mode, which maintains the lunar pointing orientation and any offset pointing from this baseline. It is within this mode that all science instrument calibrations, slews and science data is collected. Because of a high accuracy requirement for knowledge and pointing, the Observing mode makes use of star tracker (ST) measurement data to determine an instantaneous attitude pointing. But even the star trackers alone do not meet the tight requirements, so a six-state Kalman Filter is employed to improve the noisy measurement data. The Observing mode obtains its rate information from an inertial reference unit (IRU) and in the event of an IRU failure, the rate data is be derived from the star tracker, but with degraded pointing performance. The Delta-V control mode responsibility is to maintain attitude pointing during the cruise trajectory, insertion burns and lunar orbit maintenance by adjustments made to the spacecraft s velocity magnitude and vector direction. The ACS also provides for a thruster based system momentum management algorithm (known as Delta-H) to maintain the system and wheel momentum to within acceptable levels. In the event an anomaly causes the LRO spacecraft to lose the ability to maintain its current attitude pointing, a Sun Safe mode is included in the ACS for the purpose of providing a known power and thermally safe coarse inertial sun attitude for an indefinite period of time, within the manageable limits of the reaction wheels. The Sun Safe mode is also the initial spacecraft control mode off of the launch vehicle and provides for a means to null tip-off rates immediately after separation. The nominal configuration is to use the IRU for rate information in the controller. In the event of a gyro failure a gyroless control mode was developed that computes rate information from the CSS data.

Garrick, Joseph↗

TRW - Lunar Descent Engine

As we went through the program, what we determined, and what we all agreed on, was that the thrust coefficient (Cf) of the nozzle, after you get past a certain point, is really an engineering parameter. It s not a fundamental parameter that is going to be highly variable. Once we knew what the contour of the nozzle was, and once we knew what its characteristic was out to 2:1, we could calculate what the 48:1 thrust coefficient was going to be. In every case that we made a test, the calculation was precise. We weren't looking for a problem out at 48:1. Once we crushed the nozzle and said, "Yeah, we can land on the boulder," and once we had the thermal profile of that columbium nozzle, we did not require a lot of effort there. The real characterization was done in throttling over the 10:1 with the injector and controlling the mixture ratio on that - the whole head-end assembly - out to 2:1. I think everybody at NASA and Grumman agreed that flying like you test is great, particularly if you are using an aircraft engine. But, in this case, the thrust coefficient of the nozzle was not an issue. We had the tandem configuration of the service module, the command module, and the LEM sitting out there, and we were to fire the LEM. On Apollo 5, we were firing the LEM to show how it would work. There was a problem. I can t remember where the problem was, but something caused a problem before that engine had finished its burn. It was not in the engine, but there was some other problem, and NASA made a controlled shutdown. Then, they came to us and asked, "Hey, we re up there. We want to finish this test program. Is it okay if we restart that engine again in space with this tandem configuration?" We said, "As long as it has been more than forty minutes since you shut down, our analysis says that you will be okay in terms of the thermal characteristics of the inside of that chamber." They restarted it and pushed that system around in orbit on Apollo 5. It turned out, that when it came to Apollo 13, we went back into the record, and said, "Hey, we have pushed this system around up there on Apollo 5, and we have also restarted this tandem configuration." The requirements on Apollo 13 were to put it back into play. The spacecraft was out of free return to the earth at the time of the accident. It would not have come back. NASA said, "Okay, we ll use the descent engine to put the spacecraft in a free trajectory; it will go around the moon and be on free trajectory back to Earth." Then, as it came around the far side of the moon, the guys found out that they had an oxygen problem. As you remember, things were getting pretty bad in there. They said, "We ve got to get it back as fast as we can. Is it okay if we re-fire the engine? Now, we re in a free trajectory, so we want to put as much delta-v (or change in velocity) in as we can. Can we re-fire right now?" We said, "Yes, the data says it has been this period of time." We could re-fire the engine, run the rest of the duty cycle up as far as we needed while preserving enough fluids to make the final correction as the spacecraft got near Earth, and restart the engine. It was pretty fortuitous that we could give them those answers.

Elverum, Gerard W.↗

Demonstration of an Aerocapture GN and C System Through Hardware-in-the-Loop Simulations

Aerocapture is an orbit insertion maneuver in which a spacecraft flies through a planetary atmosphere one time using drag force to decelerate and effect a hyperbolic to elliptical orbit change. Aerocapture employs a feedback Guidance, Navigation, and Control (GN&C) system to deliver the spacecraft into a precise postatmospheric orbit despite the uncertainties inherent in planetary atmosphere knowledge, entry targeting and aerodynamic predictions. Only small amounts of propellant are required for attitude control and orbit adjustments, thereby providing mass savings of hundreds to thousands of kilograms over conventional all-propulsive techniques. The Analytic Predictor Corrector (APC) guidance algorithm has been developed to steer the vehicle through the aerocapture maneuver using bank angle control. Through funding provided by NASA's In-Space Propulsion Technology Program, the operation of an aerocapture GN&C system has been demonstrated in high-fidelity simulations that include real-time hardware in the loop, thus increasing the Technology Readiness Level (TRL) of aerocapture GN&C. First, a non-real-time (NRT), 6-DOF trajectory simulation was developed for the aerocapture trajectory. The simulation included vehicle dynamics, gravity model, atmosphere model, aerodynamics model, inertial measurement unit (IMU) model, attitude control thruster torque models, and GN&C algorithms (including the APC aerocapture guidance). The simulation used the vehicle and mission parameters from the ST-9 mission. A 2000 case Monte Carlo simulation was performed and results show an aerocapture success rate of greater than 99.7%, greater than 95% of total delta-V required for orbit insertion is provided by aerodynamic drag, and post-aerocapture orbit plane wedge angle error is less than 0.5 deg (3-sigma). Then a real-time (RT), 6-DOF simulation for the aerocapture trajectory was developed which demonstrated the guidance software executing on a flight-like computer, interfacing with a simulated IMU and simulated thrusters, with vehicle dynamics provided by an external simulator. Five cases from the NRT simulations were run in the RT simulation environment. The results compare well to those of the NRT simulation thus verifying the RT simulation configuration. The results of the above described simulations show the aerocapture maneuver using the APC algorithm can be accomplished reliably and the algorithm is now at TRL-6. Flight validation is the next step for aerocapture technology development.

Masciarelli, James↗

Guidance and Control System for a Satellite Constellation

A distributed guidance and control algorithm was developed for a constellation of satellites. The system repositions satellites as required, regulates satellites to desired orbits, and prevents collisions. 1. Optimal methods are used to compute nominal transfers from orbit to orbit. 2. Satellites are regulated to maintain the desired orbits once the transfers are complete. 3. A simulator is used to predict potential collisions or near-misses. 4. Each satellite computes perturbations to its controls so as to increase any unacceptable distances of nearest approach to other objects. a. The avoidance problem is recast in a distributed and locally-linear form to arrive at a tractable solution. b. Plant matrix values are approximated via simulation at each time step. c. The Linear Quadratic Gaussian (LQG) method is used to compute perturbations to the controls that will result in increased miss distances. 5. Once all danger is passed, the satellites return to their original orbits, all the while avoiding each other as above. 6. The delta-Vs are reasonable. The controller begins maneuvers as soon as practical to minimize delta-V. 7. Despite the inclusion of trajectory simulations within the control loop, the algorithm is sufficiently fast for available satellite computer hardware. 8. The required measurement accuracies are within the capabilities of modern inertial measurement devices and modern positioning devices.

Bryson, Jonathan Lamar↗

CASTOR: Cathode/Anode Satellite Thruster for Orbital Repositioning

The purpose of CASTOR (Cathode/Anode Satellite Thruster for Orbital Repositioning) satellite is to demonstrate in Low Earth Orbit (LEO) a nanosatellite that uses a Divergent Cusped Field Thruster (DCFT) to perform orbital maneuvers representative of an orbital transfer vehicle. Powered by semi-deployable solar arrays generating 165W of power, CASTOR will achieve nearly 1 km/s of velocity increment over one year. As a technology demonstration mission, success of CASTOR in LEO will pave the way for a low cost, high delta-V orbital transfer capability for small military and civilian payloads in support of Air Force and NASA missions. The educational objective is to engage graduate and undergraduate students in critical roles in the design, development, test, carrier integration and on-orbit operations of CASTOR as a supplement to their curricular activities. This program is laying the foundation for a long-term satellite construction program at MIT. The satellite is being designed as a part of AFRL's University Nanosatellite Program, which provides the funding and a framework in which student satellite teams compete for a launch to orbit. To this end, the satellite must fit within an envelope of 50cmx50cmx60cm, have a mass of less than 50kg, and meet stringent structural and other requirements. In this framework, the CASTOR team successfully completed PDR in August 2009 and CDR in April 2010 and will compete at FCR (Flight Competition Review) in January 2011. The complexity of the project requires implementation of many systems engineering techniques which allow for development of CASTOR from conception through FCR and encompass the full design, fabrication, and testing process.

Mruphy, Gloria A.↗

Human Exploration of Earth's Neighborhood and Mars

The presentation examines Mars landing scenarios, Earth to Moon transfers comparing direct vs. via libration points. Lunar transfer/orbit diagrams, comparison of opposition class and conjunction class missions, and artificial gravity for human exploration missions. Slides related to Mars landing scenarios include: mission scenario; direct entry landing locations; 2005 opportunity - Type 1; Earth-mars superior conjunction; Lander latitude accessibility; Low thrust - Earth return phase; SEP Earth return sequence; Missions - 200, 2007, 2009; and Mission map. Slides related to Earth to Moon transfers (direct vs. via libration points (L1, L2) include libration point missions, expeditionary vs. evolutionary, Earth-Moon L1 - gateway for lunar surface operations, and Lunar mission libration point vs. lunar orbit rendezvous (LOR). Slides related to lunar transfer/orbit diagrams include: trans-lunar trajectory from ISS parking orbit, trans-Earth trajectories, parking orbit considerations, and landing latitude restrictions. Slides related to comparison of opposition class (short-stay) and conjunction class (long-stay) missions for human exploration of Mars include: Mars mission planning, Earth-Mars orbital characteristics, delta-V variations, and Mars mission duration comparison. Slides related to artificial gravity for human exploration missions include: current configuration, NEP thruster location trades, minor axis rotation, and example load paths.

Condon, Gerald↗

Determining Atmospheric-Density Profile of Titan

A method was developed for measuring the atmospheric density of Titan, the largest moon of Saturn, to create an accurate density profile as a function of altitude. This will allow mission planners to select safe flyby altitudes, and for navigation engineers to accurately predict the delta-v associated with those flybys. The spacecraft angular rate vector profile as a function of time is collected via telemetry from the onboard attitude estimator once every 2 seconds. The telemetry for thruster times, as a function of time, for eight Reaction Control System (RCS) thrusters is gathered, once a second, from the Propulsion Manager algorithm of the Cassini onboard attitude-control flight software. Using these data, the ground software computes the angular momentum vector profile and the per-axis external torque as a function of time imparted from the spacecraft only due to the atmospheric drag. The software can then determine the Titan atmospheric density profile as a function of time and altitude with the known values of spacecraft center of mass, the Titan-relative range and velocity data, the projected area, and the aerocenter, along with the estimated drag coefficient in a free molecular flow field.

Sarani, Siamak↗

The TPF Mission at L2

The Terrestrial Planet Finder (TPF) is one of the center pieces of NASA's Origins Program. The goal of TPF is to identify terrestrial planets around stars nearby the Sun. For this purpose, a space-based interferometer with a baseline of approximately 100 m is required. To achieve such a large baseline, a distributed system of five spacecraft flying in formation is an efficient approach. Since the TPF instruments need a cold and stable environment, a halo orbit about 4 is ideal. First, we describe formation flight near the Lagrange point is feasible for the TPF mission. Second, we propose a novel approach for human servicing of Lagrange point missions by placing a Lunar service station in an Lunar L1 orbit. The TPF spacecraft can be transferred to a Lunar L1 orbit in a few days and requires relatively little delta-V. This efficient transfer results from the system of low energy pathways connecting the entire Solar System generated by the Lagrange points. The halo orbits are the portals of this Interplanetary . A Lunar Station at the L,portal, in addition to servicing missions from the Sun-Earth Lagrange points, may play an even more important role in the future development of space.

human servicing↗

Automated Escape Guidance Algorithms for An Escape Vehicle

An escape vehicle was designed to provide an emergency evacuation for crew members living on a space station. For maximum escape capability, the escape vehicle needs to have the ability to safely evacuate a station in a contingency scenario such as an uncontrolled (e.g., tumbling) station. This emergency escape sequence will typically be divided into three events: The fust separation event (SEP1), the navigation reconstruction event, and the second separation event (SEP2). SEP1 is responsible for taking the spacecraft from its docking port to a distance greater than the maximum radius of the rotating station. The navigation reconstruction event takes place prior to the SEP2 event and establishes the orbital state to within the tolerance limits necessary for SEP2. The SEP2 event calculates and performs an avoidance burn to prevent station recontact during the next several orbits. This paper presents the tools and results for the whole separation sequence with an emphasis on the two separation events. The fust challenge includes collision avoidance during the escape sequence while the station is in an uncontrolled rotational state, with rotation rates of up to 2 degrees per second. The task of avoiding a collision may require the use of the Vehicle's de-orbit propulsion system for maximum thrust and minimum dwell time within the vicinity of the station vicinity. The thrust of the propulsion system is in a single direction, and can be controlled only by the attitude of the spacecraft. Escape algorithms based on a look-up table or analytical guidance can be implemented since the rotation rate and the angular momentum vector can be sensed onboard and a-priori knowledge of the position and relative orientation are available. In addition, crew intervention has been provided for in the event of unforeseen obstacles in the escape path. The purpose of the SEP2 burn is to avoid re-contact with the station over an extended period of time. Performing this maneuver properly requires knowledge of the orbital state, which is obtained during the navigation state reconstruction event. Since the direction of the delta-v of the SEPI maneuver is a random variable with respect to the Local Vertical Local Horizontal (LVLH) coordinate system, calculating the required SEP2 burn is a challenge. This problem was solved using a neural network as a model-free function approximation technique.

Flanary, Ronald↗

OTIS Modeling of IBEX Flight

When a launch vehicle carries a payload into space, it must follow a very particular trajectory to achieve its desired orbit. Modern rockets have very tight delta-v budgets and many forces work to rob the rocket of energy, placing limits on the performance of the launch vehicle. Trajectory optimization evolved out of this need to economize on every bit of energy of a launch vehicle. Today NASA uses Optimal Trajectory by Implicit Simulation (OTIS) to optimize trajectories based on given parameters. The Interstellar Boundary EXplorer (IBEX) mission profile is unique and required special alterations to the standard OTIS data output.

deZarraga, Gaston↗

Launch Period Development for the Juno Mission to Jupiter

The Juno mission to Jupiter is targeted to launch in 2011 and would reach the giant planet about five years later. The interplanetary trajectory is planned to include two large deep space maneuvers and an Earth gravity assist a little more than two years after launch. In this paper, we describe the development of a 21-day launch period for Juno with the objective of keeping overall launch energy and delta-V low while meeting constraints imposed on Earth departure, the deep space maneuvers' timing and geometry, and Jupiter arrival.

mission design↗

Applications of Multi-Body Dynamical Environments: The ARTEMIS Transfer Trajectory Design

The application of forces in multi-body dynamical environments to pennit the transfer of spacecraft from Earth orbit to Sun-Earth weak stability regions and then return to the Earth-Moon libration (L1 and L2) orbits has been successfully accomplished for the first time. This demonstrated transfer is a positive step in the realization of a design process that can be used to transfer spacecraft with minimal Delta-V expenditures. Initialized using gravity assists to overcome fuel constraints; the ARTEMIS trajectory design has successfully placed two spacecraft into EarthMoon libration orbits by means of these applications.

Folta, David C.↗

Three year orbital trim maneuver performance of the Cassini spacecraft attitude control subsystem.

Cassini is a sophisticated interplanetary spacecraft providing scientific findings that continue to offer insight into our solar system. After arriving at Saturn on June 30, 2004 it has completed three years of a four year prime mission. To date, Cassini has completed 49 orbits about Saturn and over 40 targeted flybys of Saturn’s moons. This has been achieved with a nominal design using three delta-V maneuvers per targeted encounter.

Smith, Brett A.↗