Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperworkrequired of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

14 SOLAR ENERGY↗

Minerva: User-Centered Science Operations Software Capability for Future Human Exploration

In June of 2016, the Biologic Analog Science Associated with Lava Terrains (BASALT) research project conducted its first field deployment, which we call BASALT-1. BASALT-1 consisted of a science-driven field campaign in a volcanic field in Idaho as a simulated human mission to Mars. Scientists and mission operators were provided a suite of ground software tools that we refer to collectively as Minerva to carry out their work. Minerva provides capabilities for traverse planning and route optimization, timeline generation and display, procedure management, execution monitoring, data archiving, visualization, and search. This paper describes the Minerva architecture, constituent components, use cases, and some preliminary findings from the BASALT-1 campaign.

Deans, Matthew↗

Minerva: User-Centered Science Operations Software Capability for Future Human Exploration

In June of 2016, the Biologic Analog Science Associated with Lava Terrains (BASALT) research project conducted its first field deployment, which we call BASALT-1. BASALT-1 consisted of a science-driven field campaign in a volcanic field in Idaho as a simulated human mission to Mars. Scientists and mission operators were provided a suite of ground software tools that we refer to collectively as Minerva to carry out their work. Minerva provides capabilities for traverse planning and route optimization, timeline generation and display, procedure management, execution monitoring, data archiving, visualization, and search. This paper describes the Minerva architecture, constituent components, use cases, and some preliminary findings from the BASALT-1 campaign.

Deans, Matthew↗

OnAIR: Applications of The NASA On-Board Artificial Intelligence Research Platform

Infusing artificial intelligence algorithms into production aerospace systems can be challenging due to costs, timelines, and a risk averse industry. We introduce the Onboard Artificial Intelligence Research (OnAIR) platform, an open source software pipeline and cognitive architecture tool which enables full life cycle AI research for on-board intelligent systems. We begin a description and user walk-through of the OnAIR tool. Next we describe four use cases of OnAIR for both research and deployed onboard applications, detailing their use of OnAIR and the benefits it provided to development and function of each respective scenario. We conclude with remarks on future work, future planned deployments and goals for forward progression of OnAIR as a tool to enable larger AI and aerospace research community.

Cognitive Architecture↗

Lessons Learned from International Space Station Crew Autonomous Scheduling Test

In 2017, our team investigated and evaluated the novel concept of operations of astronaut self-scheduling (rescheduling their own timeline without creating violations) onboard International Space Station (ISS). Five test sessions were completed for this technology demonstration called Crew Autonomous Scheduling Test (CAST). For the first time in a spaceflight operational environment, an ISS crewmember planned, rescheduled, and executed their activities in real-time on a mobile device while abiding by flight and scheduling constraints. This paper discusses the lessons learned from deployment to execution.

planning and scheduling↗

Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

Marquez, Jessica J.↗

Performance Report: A timeline for the synchrotron calibration of AXAF

Presented herein are the known elements of the timeline for synchrotron reflectance calibrations of HRMA witness samples (Section 2). In Section 3, lists of measurements to be done on each witness flat are developed. The elements are then arranged into timelines for the three beamlines we expect to employ in covering the full 50-12,000 eV energy range (Section 4). Although the required AXAF operational range is only 0.1-10 keV, we must calibrate the extent to which radiation just outside this band may contaminate our in-band response. In Section 5, we describe the working relationships which exist with each of the beamlines, and estimate the time available for AXAF measurements on each. From the timelines and the available time, we calculate the number of flats which could be measured in full detail over the duration of the program for each beamline. A suggestion is made regarding a minimum required baselines of witness flats from each element coating run or qualification run to be used in the calibration. We intend that this suggestion open discussion of the issue of witness flat deployment.

Tananbaum, H. D.↗

Southeast Regional Carbon Sequestration Partnership Phase III Overview of Accomplishments (SECARB Phase III Final Report)

The Southeast Regional Carbon Sequestration Program (SECARB) is a carbon management program established in 2003 and managed by the Southern States Energy Board (SSEB). SECARB is one of seven regional carbon sequestration partnerships formed by the Department of Energy (DOE). The seven partnerships form a national network of more than 400 organizations covering 43 states and four Canadian provinces with expertise in the areas of carbon capture, transportation, and storage. The SECARB program was funded by DOE and cost-sharing partners. The primary goal of SECARB was to identify major sources of carbon emissions, characterize the geology of a 13-state region, determine the most promising options for commercial deployment of carbon dioxide (CO 2 ) sequestration technologies in the South, and validate the technology options through carefully executed field testing through 2017. This report summarizes significant Phase III accomplishments and is organized by task as established within the SECARB Phase III Statement of Project Objectives (SOPO). This document does not provide an exhaustive overview of individual tasks. Rather, this report provides an overview of programmatic accomplishments and a timeline of events. Where applicable, hyperlinks to specific project deliverables are provided.

54 ENVIRONMENTAL SCIENCES↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STS-109 Crew Interviews - Linnehan

STS-109 Mission Specialist 3 (MS3) Richard M. Linnehan is seen during a prelaunch interview. He answers questions about his lifelong desire to become an astronaut and his career path, which included becoming a zoo veterinarian. He gives details on the Columbia Orbiter mission, which has as its main purpose the maintenance and augmentation of the Hubble Space Telescope (HST). As MS3, his primary role in the mission pertains to EVAs (Extravehicular Activities) 1, 3, and 5. During EVA 1, Linnehan and another crewmember will replace one of two flexible solar arrays on the HST with a smaller, more efficient rigid solar array. The second solar array will be replaced on EVA 2 by other crewmembers. EVA 3 will involve the replacement of the Power Control Unit (PCU), and will require the first complete powering down of HST since its deployment. The possibility of a serious problem occurring is greatest during this portion of the mission because the original PCU was not built to be replaced. In EVA 5, Linnehan and another crewmember will install a replacement cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer), which has not been operational. Linnehan discusses his role during the mission as well as that of his crewmates, and provides an abbreviated timeline, including possible contingencies.

Source record↗

High Current Density Cables for Simpler HTS Magnets in Fusion Energy Systems

High current density cables are needed for the engineering design of potentially low cost, simpler geometry high temperature superconducting (HTS) magnets in the promising magnetic configurations as a fusion pilot plant (FPP) option. Significant technology maturation efforts are underway by privately funded startups with the goal to demonstrate mature HTS magnet technology. Test results, however, indicate critical engineering issues remain to be addressed to meet performance goals, and demonstrate HTS coil operation repeatability and reliability. To this end, exploring and enabling multiple viable conductor and cable options is vital. Partnering with a private fusion startup and manufacturers of superconducting strands and cables, Princeton Plasma Physics Laboratory (PPPL) is exploring and seeking to de-risk the aggressive high field approach presently targeted by others. Our main objective is to develop, test and calibrate novel high current density cables for a broad deployment of affordable and reliable coils using Bi-2212 conductors. If successful, such a project will provide technical feasibility for promising FPP configurations including spherical tokamaks (ST) and compact stellarators. Here, we aim at the state-of-the-art Bi-2212 cable technologies toward a current density of 100 A/mm 2 at 16 T and 4.2 K–10 K operation for low cost, simpler geometry toroidal field (TF) coils for compact stellarators developed by fusion startup companies on a timeline consistent with the FPP initiatives and beyond.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Synroc Waste Treatment Facility for Fission-based Molybdenum-99 Production - 19335

ANSTO is building a nuclear waste treatment plant that represents a significant step change in the treatment of intermediate-level waste (ILW) from Molybdenum-99 nuclear medicine production. This industrial scale facility shall deploy ANSTO Synroc technologies; a wasteform tailored for immobilizing fission products, an integrated process line for converting liquid waste into free-flowing powder, automated canister filling and sealing, and a hot isostatic pressing (HIP) system designed for remote operation. The HIP represents the last processing step to consolidate the wasteform into a final durable solid compact with the required performance characteristics. This paper shall outline the various phases of development in realising the final plant design as well as timelines to progress through cold- and hot-commissioning. Further, plans for storage and final disposal of the HIPed canister product will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool

The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the system can evolve into a process management server for the actual process.

Hardy, Roger↗

Managing Environmental Effects to Facilitate Marine Renewable Energy Development

The marine renewable energy (MRE) industry is in the early stages of commercial development. In addition to the challenges of deploying and maintaining devices under harsh ocean conditions and transporting electricity to shore, concerns around potential environmental effects continue to slow permitting (consenting) processes. Regulators and stakeholders perceive a wide array of potential environmental interactions as risky and highly uncertain, and request that considerable baseline assessments and post-installation monitoring be carried out in order to permit or license a project. The MRE industry is struggling with the high cost of baseline assessments and post-installation monitoring, as well as extended timelines for obtaining permits, leading to uncertainty and risk for financing projects. As a means to mitigate this uncertainty and risk, regulators in the US have been engaged to ensure that they understand the underlying science that drives these challenges and to explore the feasibility of transferring learning and information from early MRE projects and analogous industry interactions to inform potential environmental effects and permitting for new MRE projects. The ability to use data and information from one project or location to another can aid the industry by reducing the high costs of environmental monitoring and accelerating permitting processes for future projects. This paper presents findings of a regulator survey and other engagements with regulators, provides insight into the process of data transferability, suggests a framework for data transferability and collection consistency, and details efforts to engage the research community in furthering this process.

Marine renewable energy, environmental effects, da↗

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy↗

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy↗

Launch and Commissioning of the Lunar Reconnaissance Orbiter (LRO)

The Lunar Reconnaissance Orbiter (LRO) launched on June 18, 2009 from the Cape Canaveral Air Force Station. LRO, designed, built, and operated by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center in Greenbelt, MD, is gathering crucial data on the lunar environment that will help astronauts prepare for long-duration lunar expeditions. To date, the Guidance, Navigation and Control (GN&C) subsystem has operated nominally and met all requirements. However, during the early phase of the mission, the GN&C Team encountered some anomalies. For example, during the Solar Array and High Gain Antenna deployments, one of the safing action points tripped, which was not expected. Also, the spacecraft transitioned to its safe hold mode, SunSafe, due to encountering an end of file for an ephemeris table. During the five-day lunar acquisition, one of the star trackers triggered the spacecraft to transition into a safe hold configuration, the cause of which was determined. These events offered invaluable insight to better understand the performance of the system they designed. An overview of the GN&C subsystem will be followed by a mission timeline. Then, interesting flight performance as well as anomalies encountered by the GN&C Team will be discussed in chronological order.

Shah, Neerav↗