Search NASA⌕ Search

SEARCH · Search NASA

Results for “design and dispatch optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Characterizing and improving the performance of molten-salt-steam heat exchangers in concentrating solar power plants

Shell-and-tube heat exchangers (HXs) for steam generation from molten salts in concentrating solar power (CSP) plants experience thermal fatigue due to significant temperature gradients and inherent transient operation. Molten salt-steam HX design lifespans exceed actual lifespans, and, as a consequence, designers overpredict plant profitability and operators neglect appropriate prescriptions to optimize these lifetimes. Here, this study refines HX lifespan estimates with data benchmarked against thermal-fluid mechanical modeling of stress and accumulated fatigue. Reduced-order thermal models of the molten salt-steam, shell-and-tube evaporator and superheater predict transient temperature profiles along the two HXs salt-steam flow paths. The modeled evaporator and superheater temperature profiles enable assessment of cyclic stresses within the HX tubesheets, where molten-salt HX failures are most common. Evaporator and superheater performance data from a current 110 MW elec commercial CSP plant provide a basis for validating the reduced-order HX models. HX life predictions derived from stochastic failure distributions serve as inputs for simulating and optimizing existing plant operations. The impact of the updated lifespans on overall plant revenue depends on operating scenarios. This study suggests that typical ramping rates for a CSP plant with a high-temperature Rankine cycle result in an evaporator and superheater life of approximately 10 and 25 years, respectively, compared to the design target of 30 years. Reduced HX lifespans decrease operational plant revenue on average by 4.6-5.1%. Furthermore, there may be as many as four HX replacements over the 30-year lifetime of the plant; and, purchase agreement loss due to failure to meet contractual production requirements can have ramifications that include the risk of bankruptcy.

14 SOLAR ENERGY↗

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING↗

Hydropower Flexibility Framework (Final Technical Report)

The Hydropower Flexibility Framework (HFF) tool focuses on providing the hydropower community with an effective means of assessing optimized hydropower plant outcomes. This tool combines both site specific characteristics, which act to constrain plant operation, and the hydrologic and grid characteristics which drive hydropower plant operation. The hydropower community faces a confluence of factors which drive the importance of developing such a capability, including an aging hydropower fleet subject to a range of modernization opportunities, a large number of hydropower plant relicensing activities which may affect operational requirements, an electrical grid with increasing levels of variable resources which must be balanced to maintain grid stability, and climate change influencing riverine hydrologic patterns outside of design characteristics. With support from the hydropower community, the project team developed the HFF tool and demonstrated the tool through a series of Use Cases. This guidance was developed as a part of the larger HFF tool User’s Manual (see Appendix B), a resource designed to inform other users and to empower community uptake of the tool. The HFF tool, hosted at https://hfftool.com/, was developed with the support of the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). EPRI is currently exploring alternatives to support the continued maintenance and functionally of the online tool.

13 HYDRO ENERGY↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Next-Generation Energy Technologies for Connected and Automated On-Road Vehicles (NEXTCAR) - Predictive Data-Driven Vehicle Dynamics and Powertrain Control: from ECU to the Cloud (Final Scientific/Technical Report)

This project developed and demonstrated a predictive, data-driven vehicle control system designed to improve energy efficiency and driving performance. The team created intelligent self-driving car technology that optimizes fuel and electricity use by proactively planning vehicle actions. By combining Level 4 autonomous driving capabilities with vehicle-to-everything (V2X) connectivity, the system enables vehicles to adjust speed and change lanes in response to traffic signals, surrounding vehicles, and road conditions, reducing unnecessary stops and delays. In testing, the system improved vehicle fuel economy by more than 30% and reduced travel time by approximately 10%, compared to a conventional adaptive cruise control baseline. These results demonstrate the technical effectiveness of using predictive, V2X-enabled strategies, such as traffic light timing and surrounding traffic awareness, to inform real-time vehicle powertrain control and driving behavior. Additionally, a supporting cloud platform was developed to provide dispatch and route recommendations as well as to log vehicle data, demonstrating the economic feasibility of this approach at the fleet level. By optimizing dispatching and routing operations, this technology enables electric fleet operators to use their vehicles more efficiently and reduce reliance on diesel backups, lowering both operating costs and energy consumption. Overall, this project’s technology advances the future of clean, energy-efficient transportation, enabling vehicles and fleets to reduce energy waste, cut costs, and lower emissions through intelligent automation and connectivity.

33 ADVANCED PROPULSION SYSTEMS↗

Average Incremental Cost Pricing for the AC Unit Commitment Problem [Rev. 1]

Unit Commitment (UC) problems that consider the Alternating Current (AC) model of the transmission network have long been considered intractable to solve at scale by the power system community. Recently, the Grid-Optimization (GO) Competition held by the Advanced Research Project Agency-Energy (ARPA-E) has facilitated the development of the first algorithms to solve large-scale ACUC problems. This new capability opens a path towards the explicit consideration of the AC transmission network model in UC problems used to clear day-ahead electricity markets. This calls for the analysis of electricity market structures that accommodate both the continuous non-linearity of the AC transmission network and the discrete non-linearity of the UC problem simultaneously. This paper serves as an initial effort to do so by proposing an Average Incremental Cost (AIC) pricing structure that is designed around the ACUC problem. In particular, an AIC one-pass pricing problem is proposed that represents a continuously constrained variant of the ACUC problem and allows for the computation of Locational Incremental Prices (LIPs) for both real and reactive power as the local optimal Lagrange multipliers of the power balance constraints. To avoid degeneracy, the pricing problem includes a small parameter ϵ > 0. Under certain assumptions market participants are shown to realize profit that converges to a non-negative value as ϵ approaches zero, practically ensuring profitability for small values of ϵ. We additionally provide many simple and important examples that provide intuition and insights into the proposed prices. Examples illustrate the basic concept of AIC pricing, the derived profitability results, the existence of multiple LIPs, the importance of including reactive power in the dispatch and pricing problems, the need for reactive power prices, and the improved incentives exhibited by LIPs as compared to traditional Locational Marginal Prices (LMPs). We additionally indicate many directions for future work including analysis of larger test cases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis

The First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis (aka the STEP 1 Project or the Project) aimed to (1) developed a brand-new web tool that could provide decision support through free, rapid techno-economic analysis of behind-the-meter solar+storage systems for industrial process heat and (2) conduct high-level analyses of the cost-competitiveness of the same systems across the US in key sectors. The STEP 1 web tool collects key location, land availability, thermal load profile, proccess heat temperature and media, and other key parameters through an easy-to-use user interface (UI). The UI was designed to meet the user at their level of understanding by minimizing the number of required inputs as much as possible while including options for more nuanced inputs if the user desires. STEP 1 advises users on which solar thermal tehcnologies that could fit their needs based on the inputs provided (namely process media and temperature). The tool can model a wide range of solar thermal technologies including flat plate collectors, evacuated tubes, parabolic troughs, linear Fresnel, and molten salt towers all with corresponding thermal energy storage (TES) - solar PV with resistive heating and TES is also included. Once the parameters are collected, a nominal thermal energy production profile for the facility's location is generated using NREL's System Advisory Model (SAM) and then passed to a modified version of NREL's REopt platform to optimize the size (capacity) and dispatch of the solar+storage system to minimize lifecycle costs subject to energy balance, fuel and electricity rates, emission reductions goals, and other constraints. This entire process takes less than 20 minutes, is completely free, requires zero coding skills, and provides the user with a high-level assessment on the techno-economic feasability of deploying solar+storage systems for their energy needs. In addition to the development of the STEP 1 web tool, the project completed two complementary analyses focused on leveraging the backend code of STEP 1, public industrial facility locations and fuel consumption data, and key sector information to assess the economic opportunity of reducing fuel costs at various levels of capacity factor around the US. Both analyses found that there are key markets, locations, industrial sectors (namely food and beverage), and degrees of offset where solar thermal technologies could be cost-effectively deployed, highlighting a key market entry point for these technologies, and assessing deployment potential. In summary, the STEP 1 project improved the opportunities for solar+storage systems to expand into the industrial process heat market through breaking down barriers to assessing these technologies.

14 SOLAR ENERGY↗

High-Fidelity and High-Performance Computational Simulations for Rapid Design Optimization of Sulfur Thermal Energy Storage

Industrial process heating (IPH) accounts for approximately 70% of US manufacturing energy use and is primarily produced by fossil fuel combustion. Approximately 1500 TWht (approximately 60%) of IPH demand is in the temperature range of 100-300. Industrial applications in this temperature range include drying, hydrothermal processing, thermal enhanced oil recovery, food and beverage, bioethanol production, etc. Cost-effective thermal energy storage (TES) that increases the utilization of waste and renewable heat (solar, geothermal, etc.) could provide significant energy savings and reliable heat sources, decrease emissions, and increase US manufacturing competitiveness through reductions in fuel consumption. TES development has historically been dominated by technologies suitable for deployment with concentrating solar power (CSP). State-of-the-art thermal storage deployed commercially with power tower CSP plants uses a 60%/40% NaNO3/KNO3 molten salt and operates between temperatures of approximately 280 degrees Celsius and 570 degrees Celsius using a two-tank configuration. However, these nitrate salts are unsuitable for operation outside of this temperature range due to a high freezing point of approximately 220 degrees Celsius, and limits on high-temperature salt stability and corrosion resistance of containment alloys. Other materials being investigated for TES include those based on: (1) sensible energy storage (various molten salt compositions, inert solid particles, rocks or pebble beds, sulfur, water, concrete, graphite, etc.), (2) latent energy storage in materials that undergo solid-liquid phase change at relevant temperatures (organic materials for low-temperature applications, inorganic salts and/or metals for high-temperature applications), or (3) thermochemical energy storage (hydrides, hydroxides, carbonates, metal oxides, etc.). The application temperature and challenges pertaining to storage material and/or containment cost, energy density, long-term thermal and cyclic stability, and charge/discharge heat transfer effectiveness drive material selection for a given IPH or electricity generation application. Sulfur is a cheap commodity at $80/ton compared to $1100 - 1300/ton for conventional salts. When using a metric of storage cost per kWh, sulfur costs around 2-3 $/kWh. Previous sulfur TES development focused on high temperature (>600 degrees) concentrated solar power applications with sulfur encapsulated in pipes and flow of gaseous HTF (air) in the shell side. However, for lower-temperature IPH applications in the range of approximately 100-300 degrees Celsius Element 16 adopted a compact and scalable TES design with molten sulfur in the shell and HTF pipes submerged in the molten sulfur bath. The low-cost molten sulfur TES for dispatchable IPH has deployment potential for broad applications. The spatial and temporal evolution of the HTF and sulfur temperature is critical to the TES system performance, and thus detailed modeling can improve understanding of the performance and facilitate design improvements. Using high performance computing and computational fluid dynamics (CFD) a low-cost molten sulfur thermal energy storage (TES) system for industrial process heating (IPH) applications was developed. The unique challenges in CFD modeling of sulfur TES are the sharp property changes of sulfur relevant to the working temperatures. Above 159, liquid sulfur undergoes polymerization, and the viscosity of sulfur rapidly increases by several orders of magnitude between 159 degrees Celsius and 188 degrees Celsius, followed by a decrease in viscosity beyond 188 degrees Celsius due to thermal bound dissociation. In addition, various concentrations of H2S impurities can also modify sulfur viscosity. This numerical challenge is especially relevant to transient simulation of the sulfur TES charging and discharging processes as the extreme property variations limit the applicability of traditional heat transfer correlations. Transient CFD simulations including the temperature-dependent sulfur properties and geometric complexity of the TES design were used to predict the effect of natural convection during charging and discharging on the heat transfer process, sulfur temperature uniformity, charge/discharge rates, and performance of the storage devices. The CFD model was validated with experimental results for a full charge and discharge cycle. The work will show 3D and 2D simulation comparisons aimed to facilitate rapid design iterations and a machine learning based design optimization approach.

CFD↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

California Price Response Potential Study

California's energy landscape is undergoing a significant transformation, driven by the increasing integration of renewable energy sources, the increased adoption of distributed energy resources, the electrification of end-use loads, and the growing need for grid efficiency. To address these challenges, recent revisions to the State’s Load Management Standards (LMS) require all of California’s large utilities and community choice aggregators (CCAs) to offer dynamic electricity pricing options to customers by 2027. Dynamic pricing, which involves varying electricity rates based on real-time supply and demand conditions, offers a promising solution for optimizing grid operations, reducing costs, and incentivizing efficient use of grid capacity. Effective implementation of dynamic pricing requires understanding the potential impacts on customer bills, system load, and the cost-effectiveness of automation technologies. This study aims to evaluate the load response of various end-use devices to hourly dynamic prices. The end-uses studied here are space cooling, space heating, water heating, crop irrigation, pool and spa pumps, and electric vehicle (EV) charging, all for both residential and commercial applications, except for crop irrigation. In 2030, these end uses are forecasted to account for 18% of annual electricity demand in the state, but 40% of demand in the peak net load hour. By modeling possible price-responsive load dispatch algorithms and assessing the resulting impacts on both individual bills and the overall grid, we seek to inform policymakers and utilities about the potential benefits and challenges associated with dynamic pricing, and considerations for the design of dynamic pricing tariffs. Additionally, we will explore the cost effectiveness of adopting automation technologies to enable devices to respond more effectively to real-time price signals. This study considers a range of price profiles, accounting for differences across utilities and customer classes, and presents scenarios for dynamic price design via variation in the percentage of total customer electric costs that are allocated dynamically (versus constituting a fixed portion of the hourly volumetric price). We present results focused primarily on 2030, forecasting electricity prices under both low and high-cost scenarios, to inform longer-term tariff design considerations. We design tariffs by starting with 2019 prices that were calculated according to CalFUSE guidance (CPUC, 2022) and that have been used in recent studies; these prices are all-in volumetric rates that vary by utility and are revenue-neutral to each customer class. They are developed by considering six electricity cost components that are allocated hourly based on system load indicators (gross and net load, and wholesale prices). These prices are forecasted to 2030 for low and high cost scenarios, considering recent trends in total electricity costs with and without years of substantial wildfire mitigation investments. These tariffs, which allocate all costs on an hourly basis, are considered our “Full” dynamic tariff design scenario, while two additional scenarios explore allocating a portion of costs as a flat volumetric charge: the “Medium” scenario allocates 50% of revenue dynamically (and keeps 50% flat), while the “Mild” scenario allocates 20% of revenue dynamically. The 20% dynamic allocation on the Mild scenario aims to represent a case where only the marginal operating costs of the grid are included in the dynamic price.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Model for Evaluating the Configuration and Dispatch of PV Plus Battery Power Plants

An open-source model was developed to optimize energy storage operation for photovoltaic- (PV-) plus-battery systems with AC-coupled and DC-coupled configurations. It includes the ability to use forecast energy prices to optimize battery charge and discharge on a rolling time horizon. The model allows for exploration of different configurations, including capital costs, inverter performance, dispatch flexibility, and capturing otherwise clipped energy for the DC-coupled system. The model can run 20 full years of hourly data in approximately two seconds, allowing comparison of a large number of configurations. We applied the model in a test case demonstrating reduced inverter clipping for DC-coupled systems and yielded slightly higher overall value than AC-coupled systems, with an approximately 2 percent increase in internal rate of return or benefit/cost ratio. Our results show that at current estimated prices for lithium-ion battery systems, large-scale PV-plus-battery plants are economically viable under the right conditions, with the configuration playing a role in system flexibility and performance. This model provides the ability for project developers, industry professionals, and researchers to use readily available software to quickly evaluate and design these systems.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Use Cases and Model Development of Thermal Storage Coupling for Advanced Nuclear Reactors

This report discusses the different options for coupling thermal energy storage (TES) systems to advanced nuclear power plants (A-NPPs) in order to enable flexible and hybrid plant operation. An advanced light-water reactor (ALWR) and a high-temperature gas-cooled reactor (HTGR) were selected as the initial use cases for demonstrating a thermally balanced energy storage coupling design for thermal power extraction. Cost functions for the A-LWR were derived from the fully balanced models that were developed based on three different coupling options with three different thermal energy bypass ratios. For the next steps, cost functions for the HTGR will also be derived, and additional nuclear reactors (e.g., a liquid-cooled fast reactor [LFR] or molten-salt reactor [MSR]) will be evaluated for coupling with TES in similar fashion, including the evaluation of their steady-state condition models and cost functions. The models presented herein showcase several design considerations, focusing on optimal deployment methodologies for achieving steady-state operation with minimum disruption to the nuclear power generation cycle. This report presents the results of steady state models developed using Aspen HYSYS®, wherein the thermal energy bypass for an NPP-TES coupling was varied up to 50%. The various components were sized using Aspen Process Economic Analyzer (APEA) and Aspen Exchanger Design and Rating (EDR), when applicable. Cost functions from these models were developed using the latest publicly available data obtained from APEA V11. The current steady-state models and cost functions provide a baseline for additional work focusing on dynamic operation and process optimization by using Idaho National Laboratory (INL)’s Framework for Optimization of Resources and Economics (FORCE) tools to evaluate the technoeconomic viability and transient operations of TES-coupled A-NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

Numerical Modeling & Size Optimization of Thermal Energy Storage for Iron & Steel Production

Iron and steel production are responsible for 90 million MtCO2 per year in the United States. Hydrogen direct reduction of iron (H2DRI) is a promising pathway for a more sustainable iron production than commercially deployed technologies which rely on natural gas. The H2DRI process requires hydrogen at a temperature of up to 950 degrees C fed into a reduction furnace to produce pellets or briquettes that are used in the downstream iron and steelmaking process. In this work, we propose to use an electrical thermal energy storage (ETES) system, that can use renewable electricity to store high-temperature heat and dispatch it upon demand. Such a system can buffer the H2DRI plant from the variability of electricity prices by charging during curtailment and running the plant from storage during times of peak electricity price. We have developed heat transfer models for two different ETES systems that can be used to heat up hydrogen to the required temperatures: a particle-based ETES and a firebrick ETES. These models are used to evaluate the performance of such a system and support the sizing and preliminary cost estimation. The preliminary results using both models show that designing ETES systems for an industrial-scale H2DRI furnace is feasible. The firebrick ETES system has limited operational duration, which might limit the price buffering effect unless significantly oversized. The particle ETES system heat exchanger has industry-feasible dimensions, but its storage capacity would be decided upon the number of particle storage silos.

25 ENERGY STORAGE↗

Approximate Dynamic Programming With Enhanced Off-Policy Learning for Coordinating Distributed Energy Resources

Herein this paper proposes an innovative approximate dynamic programming (ADP) method for distributed energy resource coordination with the loss of life of battery energy storage system (BESS) explicitly modeled. The dispatch policy is designed to account for both calendrical and cyclical aging effects on BESS, explicitly modeling the impacts of ambient temperature on BESS lifespan. The proposed ADP employs an adaptive critic method and enhanced off-policy deterministic policy gradient (DPG) strategy, addressing the limitations of the on-policy gradient-based ADP approaches, including inadequate exploration, low data usage, and computational complexity. In particular, a customized policy is proposed to guide the algorithm to explore some promising decisions and thereby improve exploration capability and learning efficiency compared to conventional DPG-based learning approaches, which may struggle to find a global optimum due to random noisy action-based exploration or require expert demonstration with extra effort. The proposed method is illustrated using the IEEE 123-node system and compared with the existing ADP methods to prove solution accuracy and demonstrate the effects of incorporating degradation models into control design. Case studies showed that the proposed ADP effectively coordinates DERs with a 10 times smaller optimization gap compared to existing methods, and the incorporation of the BESS life loss model ensures the expected lifespan and results in significant cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Neural Architecture and Feature Search for Predicting the Ridership of Public Transportation Routes

Accurately predicting the ridership of public-transit routes provides substantial benefits to both transit agencies, who can dispatch additional vehicles proactively before the vehicles that serve a route become crowded, and to passengers, who can avoid crowded vehicles based on publicly available predictions. The spread of the coronavirus disease has further elevated the importance of ridership prediction as crowded vehicles now present not only an inconvenience but also a public-health risk. At the same time, accurately predicting ridership has become more challenging due to evolving ridership patterns, which may make all data except for the most recent records stale. One promising approach for improving prediction accuracy is to fine-tune the hyper-parameters of machine-learning models for each transit route based on the characteristics of the particular route, such as the number of records. However, manually designing a machine-learning model for each route is a labor-intensive process, which may require experts to spend a significant amount of their valuable time. To help experts with designing machine-learning models, we propose a neural-architecture and feature search approach, which optimizes the architecture and features of a deep neural network for predicting the ridership of a public-transit route. Our approach is based on a randomized local hyper-parameter search, which minimizes both prediction error as well as the complexity of the model. We evaluate our approach on real-world ridership data provided by the public transit agency of Chattanooga, TN, and we demonstrate that training neural networks whose architectures and features are optimized for each route provides significantly better performance than training neural networks whose architectures and features are generic.

Ayman, Afiya↗

Hybrid Power Plants for Energy Resilience: A Case Study

As renewable energy technologies are increasingly adopted, they pose an opportunity to improve the sustainability and resilience of distributed grids, especially when their design and operation is coordinated as a hybrid power plant. When included in hybrid power plants, distributed wind turbines in particular have the potential to enhance the resilience of distributed grids in areas with good wind resource, due to their ability to provide more consistent generation and ancillary services as compared to photo-voltaic (PV) solar panels. Despite this benefit, U.S. distributed wind adoption is lower than other comparable renewable energy technologies. In this study, we seek to demonstrate how hybrid power plants that include distributed wind turbines can contribute to distribution grid resilience by meeting loads (especially critical loads) more consistently, increasing reserve capacity, and providing value to customers during outages. To demonstrate these contributions, we integrate three separate frameworks and apply them to a case study in a rural electric cooperative in Iowa. Through this case study, we simulate and compare hybrid power plant design and operation during two hazard events: a tornado that causes a 48-hour distribution outage and a winter weather event that causes a 6-hour generation outage. The inclusion of a hybrid power plant that leverages 1) increased battery duration and 2) advanced forecasting and dispatch strategies that reserve capacity leading up to a hazard event best reduce lost loads as well as diesel consumption that would otherwise be used to meet those loads during short- and long-duration hazard events. Depending on the hybrid power plant capacity and operation, we find that the outage mitigation value of a hybrid power plant (measured in value to customers to avoid an outage and avoided lost revenues for the utility) is significant in both hazard events; adding wind, solar, and battery assets to the existing system adds about $50-$100M in avoided lost load and at least $4-$8k in utility value in the tornado hazard event, and $570k-$2.2M in avoided lost load and at least $220-$650 in utility value in the winter hazard scenario. In both the tornado and winter hazard scenarios, optimizing the operation of the hybrid system for resilience can lend similar value as increasing battery duration by 5 MWh for the lower capacity systems considered.

17 WIND ENERGY↗